Project Management,Planning,Design of structure (steel concrete),Steel Structures,Highway Engineering,Building construction estimation,Architecture town planning,Hydraulics,Strength of Material,Human resource management in construction,Management of design process,Sustainability build environment,Team work leader ship Strategic management in construction.nnAssessment, design, planning and execution of small and medium level infrastructure projects ( such as Street Pavement,link roads, Flood protection walls, Irrigation Channel, Drinking water supply hand pumps, tube wells, dug wells), sanitation and other community projects etc)
Description of Project / Activity
• Monitor Inspections conducted by the District Engineer (DE) using the MIS Dashboards and random field visits.
• Advice and technical support on all construction related procurement.
• A minimum of four Unique School Site visits per week, to verify at least 1 inspection conducted by each DE. An additional Audit Inspection entry is a requirement. Priority should be given to schools with major quality of work concerns or community complaints and significant progress delays. Carry out one inspection per school block before the approval of Milestone
• The final milestone visits to require joint measurements conducted with District Engineer & Contractor Engineer together on site.
• During the site visit ensure that the Contractor has maintained the updated site records on site. These include (but not limited to):
Quality Control Plan
Health & Safety Plan
Construction Schedules
Drawings
Site Register
Contract Statement of Requirements/Specifications
Statement of Requirements (Scope of Work)
Hard Copy Record of All Documents
• During the site visit check to see that monitoring and enforcement of the widespread use of PPE Equipment & Removal of Debris and notification of child labor is being done by the DE
• Conduct a bi-weekly Meeting with the Contractor, with minutes circulated to the DM, Contractor & CSM within 2 working days
• Assist the District Manager in finalization of bi-weekly work schedules of DEs
• Verified the submitted invoices (based on the desk evaluation of joint measurement sheets and random field visits)
• Responsible for quality control of Construction drawing and specs, on site tests and site layouts
• Using Capacity Assessment tools identify Humqadam related Infrastructure Engineering capacity of target Customers
• Accurate and timely activity based reporting as per project SOPs: weekly, monthly, quarterly etc
• Informative, timely and effectively presented written reports/nume
• Overall progress sharing with project manager
• Construction materials specifications
• Evaluation of contactors performance on weekly basis
• Meetings with client & technical staff
• Advisory on technical and contractual issues to project manager
• Implementation of project drawings and specifications
• Coordination with client & contractor
• Monitoring and technical assistance in construction
• Quality assurance while controlling the quality by contractor
• Review and checking of all submittals, drawings, bar bending schedule, quality control plan, working methodology and construction schedules submitted by the contractors.
• Dealing with contractor about all the construction activities. A biweekly meeting is attended to review progress and next planning.
• Payment to the contractor according to their work done as per specification
• Coordination with client according to construction activities
Task/Project: Construction of multi storey building Shaukat Khanum Memorial Cancer Hospital and Research Center (SKMCH & RC) at Peshawar
Client: Shaukat Khanum management
Action: to implement the approved drawings/design, specification and insure the quality of all construction activities within approved cost and time period.
Result s/Achievements: completed the Hospital in all respects and also provided the complete water supply scheme and fire fighting system to hospital in district Peshawar
Physical infrastructure sector will be responsible for assisting Monitoring and evaluation – Specialist in managing monitoring and evaluation of projects under Roads, Energy and Governance Infrastructure sectors. My main responsible are as follows:
• Assisting Monitoring and Evaluation – Specialist in preparing monitoring and evaluation plan and procedures for infrastructure sector projects;
• Assisting Monitoring and Evaluation – Specialist in designing tools and format for recording and reporting of findings of monitoring and evaluation activities related to infrastructure sector;
• Coordinating with respective line departments for arranging on-site monitoring and evaluation of identified projects;
• Carrying out monitoring and evaluation of infrastructure related projects; like Drinking water hand pumps, open well/dug well, tube wells, water Chanel, Irrigation Channel ,Street Pavement, Link road, gravel/shagal roads, Protection bund/flood protection walls, rehabilitation & maintenance of BHU’s & School’s, sanitation and other community projects
• Carrying out desk reviews and primary data analysis;
• Submitting required data to Data Manager on periodic basis;
• Preparing and submitting monitoring and evaluation reports to Monitoring and Evaluation – Specialist identifying issues, if any, to be addresses together with Actions required and timelines;
• Analysis of Project outcomes to determine whether those are in line with expected indicators as defined in the Integrated Monitoring and Evaluation Plan;
• Facilitating M&E officers of social and productive sectors for executing monitoring and evaluation of construction related activities in their respective sectors;
• Ensuring compliance with applicable policies and procedures;
• Updating status of follow up reports;
• Identifying and reporting modifications to the strategic or operational course of project implementation;
• Performing appraisal of sub-ordinate staff
Task/Project: Khyb
• Assessment, design, planning and execution of small and medium level infrastructure projects ( such as Street Pavement, Flood protection walls, Irrigation Channel, Drinking water supply hand pumps, tube wells, dug wells and roads), sanitation and other community projects).
• Providing Technical Support to the Program in designated geographical areas (Agency/F.R) of responsibility.
• Manage technical and engineering components related to the program implemented in an agency within FATA including the management of contractors.
• Design architectural and structural drawings as well as create bills of quantity, material specifications lists, and other technical documentation relating to infrastructure programming within FATA.
• Coordination with different stakeholders for identification of Household & Community infrastructure schemes
• Maintaining close coordination with Political Administration regarding program activities
• Managing and conducting Technical feasibility of identified C&HH infrastructure schemes
• Reporting to Construction Coordinator HH & C Infrastructure regarding identification and technical feasibilities of HH & C Infrastructure schemes.
• Assist Construction Coordinator to Preparation of BOQs and specifications for feasible schemes
• Preparation of Project Management Committee for implementation and maintenance of schemes
• Coordination with Project management committee about day-to-day progress of the schemes
• Daily reporting to Construction Coordinator HH & C Infrastructure on day-to-day program activities.
• Arranging visits to sites to check the quality and providing technical support to the workers
• Assist Construction Coordinator to sending recommendations to upper management for realizing of funds to Project Management Committee
Task/Project: Upper Fata livelihood development program (LDP)– outcome 1 (household and community infrastructure component)
Action: To implement the approved drawings/design specification an
• Monitoring and technical assistance in construction of schools, colleges and Hospitals
• Quality assurance while controlling the quality by contractor
• Review and checking of all submittals, drawings, bar bending schedule, quality control plan, working methodology and construction schedules submitted by the contractors
• Technical Assistance to the Resident Engineer in all construction activities
• Conducting test like Field Density Test, cylinder compression test, reinforcement tensile test, sieve analysis test of aggregate, gradation of coarse & fine aggregates and analysis of soil for backfilling etc
• Dealing with contractor about all the construction activities. A biweekly meeting is attended to review progress and next planning
• Payment to the contractor according to their work done as per specification coordination with US-AID according to construction activities
• Project coordination and management for the reconstruction of earthquake resistant structures
• Attending meeting with all the stakeholders for implementation of the project
• Approval of technical & material submittals, preparation of reports
• Verification of contractor’s payment certificates, escalation claims & variation orders
Task/Project: Pakistan Earthquake Reconstruction & Recovery Program
Action: To implement the approved drawings/deign, specification and insure the quality of all construction activities within approved cost and time period.
Result s/Achievements: Completed 03nos BHUs (Basis Health Unit) and also provided bore well facilities where required in Bagh kashmir
My responsibilities included layout, billing, Quality control of supervision, planning, monitoring, bill verifications, processing for payment, scheduling & takes the work according to specification, design & drawing.
• Supervision Construction, maintenance of buildings, water supply schemes, housing schemes, sewage systems, roads, and bridges etc
• Management of work force for detailed supervision of different construction phases
Action: To implement the approved drawings/design, specification and insure the quality of all construction activities within approved cost and time period.
Result s/Achievements: Completed 03nos green houses construction, Agricultural university construction block, rehabilitation /maintenance of 50 houses in wapda colony and cannel lining near wapda house in District Peshawar and completed 20nos. telecom tower construction with all respect in District Punjab