概要

                 I am an effective planner and organizer. My friendly and outgoing nature lets me interact with all the staff members at every level and take immense pride in saying that I bring the right measure of enthusiasm into this equation. My accompanying resume will give you a better idea of my potential in making a strong contribution to your organization. I am looking forward for an interview to discuss my credentials further. I can be reached at +92-333-4495390 and nasirhayatkhan89@gmail.com .


Thank you for your consideration and time

项目

Cancer Hospital-PIMS, Islamabad-Pakistan
Capital Icon Mall and Residency Islamabad
Punjab Forensic Science Agency
Pakistan Kidney and Liver Hospital & Research Center, Lahore (PKLI&RC)
Punjab Agriculture, Foods and Drugs Authority of Punjab

工作经历

公司标识
Resident Engineer
Atif Nazar Associate Pvt. Ltd.
Jun 2023 - 代表 | Islamabad, Pakistan

            I have been joined the “Atif Nazar Associates” from 01st –June 2023 as a Resident Engineer (RE) at Construction of Cancer Hospital-PIMS-Islamabad.                       
            PIMS cancer hospital will be 200 bedded hospital for indoor admission facility for various cancer patients and project cost is 3406.169-millions with covered area of 262,000-sft level of 1-B & G+4. The division of the bed as:-
a)     75 beds for adults oncology.
b)     25 beds for paeds.
c)     25 beds for gynae.
d)     25 beds for ICU.
e)     30 beds for private.
f)      20 beds for emergency.
·       Manage, supervise and administer all civil works contracts, incl. progress monitoring.
·       Supervise the works with proper allocation of responsibilities to the individual national supervisors and monitor, train and coach their work to ensure effective execution.
·       Ensure that all design requirements are met to acceptable standards, ascertain quality, and certify and approve stages of construction;
·       Verify drawings, specifications & work schedules process measured work, as well as Contractors’ claims, approve works and recommend for payments.
·       Ensure Works are executed in accordance with all provisions of the Contracts.
Ensure that environmental and social management and that the contractor has his own OHS plan in place and applied
·       Deliver reports that document compliance/ non-compliance with relevant Myanmar legislation, regulations and permits and related key performance indicators.
·       Maintain full & detailed permanent site records.
·       Conduct training duties (formal and on-the-job training) as per the training component plan, expected to make regular inspection visits to the project sites.
·       Also performing as team head of Handing-Over_Taking-Over (HOTO).
·       Make sure applications of RFI’s & Submittal’s and supervise the shop drawings as per site requirement.
·       Fabrications & installations of steel structure.
·       Testing and Commissioning as per contracts.
·       Make sure all is working according’s to updated drawings.
·       Make sure complete legal documents & Physical Progress at Site w.r.t IPC.
·       Make sure IR’s is closed according’s to activities.
·        Update the schedule & weekly monitoring progress.

Prepare and create project Budget for construction projects in respect to all terms of technical aspects to provide an accurate project budget in coordination with other stockholders.
Manage the contractor’s submitted EOT claims with respect to the approved baselines providing the full analyses needed after the verification and the study of the claim events & assessment done by the Engineer in a timely manner to avoid impacting the project progress and keep progress Ontrack.
Review Tender B.O.Q’s received by design consultants before tendering
Review payment certificates for contractors, consultants, and suppliers.
Responsible for the VO process and coordination between all parties till we finalize the VO .
Ensure applying contract conditions, especially with regard to payment terms , penalties, deductions .... etc.
Prepare cost estimates and review cost assessments received from consultant.
Monitor and control projects Budgets.
Liaise with all departments to ensure scope of works are well identified.
prepare monthly cost report for the monitor of projects.
Advise the project director/PM on any issues that may impact cost or time and provide cost control advice to projects team.
Prepare final accounts and update project cost estimate considering any changes occurred or expected.
Ensure documents are maintained with the company policies and procedures.
Assist in preparing the company cash flow for the upcoming years by estimating the entire upcoming projects budget in accordance with projects schedule.
Ensure records and documents are filed and maintained in line with Company procedures.
Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.
Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan.
Liaises with all team leaders and/or members to communicate required completion dates and interface between the functional team/operational team and project team.
Participate all meetings (progress meetings, coordination meetings . . . etc.).
Ensure that time-limited work is brought to the attention of the line manager/officer
Ensure procurement, material and submittal logs are created and maintained.
Monitor design, procurement and construction progress for compliance with the contract. requirements.
Develop mitigation strategies.
Prepare weekly / monthly project progress reports to be issued to the top management.
Assist in identifying critical milestones including critical interfaces with utility providers and other. third parties.

公司标识
Project Manager
MMA Construction Pvt. Ltd.
Mar 2022 - May 2023 | Islamabad, Pakistan

 MMA Construction Pvt. Limited.
 Now i am working with the “MMA Construction Pvt Limited” as a Project Manager (PM) from 01st April-2022 at project of “Capital Icon Mall & Residency”(3-B, G+27 & covered area = 871,000 sft), Islamabad, Pakistan.

公司标识
Planning Manager
Mughals Pakistan Pvt. Ltd
Jul 2021 - Mar 2022 | Lahore, Pakistan

Responsibilities:
 Evaluated Extension of Time (EoT) claims and applied various forensic Analysis and Time Impact Analysis techniques with Primavera P6.
 Contract administration, using FIDIC 2010 – Red Book, of all the contractual matters or disputes between the parties.
 Prepared revised cost estimates of Lahore Orange Line Metro Train Project
 Prepared cost estimates for At Grade Works along the route of Lahore Orange Line Metro Train Project
 Developed system for monitoring actualized activities against baseline project plan and schedule and issued timely updates to project stakeholders.
 Developed an integrated project design schedule for monitoring progress.
 Coordinated with the contractor and other project stakeholders to incorporate necessary revisions to the Detailed Time Programme / Master Programme to facilitate execution of project deliverables.
 Monitored the major milestones, critical and near-critical path activities in the Detailed time Programme and timely informed the contractor and relevant departments.
 Attended on-site weekly and monthly progress review meetings and prepared minutes of meetings.
 Generated cash flow S-curves for monthly monitoring the Physical and Financial progress

公司标识
Engineer Civil
Infrastructure and Development Authority of Punjab
Jul 2021 - Nov 2021 | Lahore, Pakistan

As a Gazetted Officer
Responsibilities:
 Developed system for monitoring actualized activities against baseline project plan and schedule and issued timely updates to project stakeholders.
 Prepared the detail resource loaded schedule of Recep Tayyip Erdogan Hospital extension Project in order to determine the man-hours required to complete the project within stipulated time frame.
 Coordinated with the contractor and other project stakeholders to incorporate necessary revisions to the Detailed Time Programme / Master Programme to facilitate execution of project deliverables.
 Monitored the major milestones, critical and near-critical path activities in the Detailed time Programme and timely informed the contractor and relevant departments.
 Attended on-site weekly and monthly progress review meetings and prepared minutes of meetings.
 Generated cash flow S-curves for monthly monitoring the Physical and Financial progress.

公司标识
Assistant Resident Engineer (ARE)
CPG-ARCOP JV
Jan 2017 - Jul 2021 | Lahore, Pakistan

Resident Engineer
 53.5-months (01-Feb-2017 to 15-July-2021) worked
with CPG-ARCOP & Associates JV as an Assistant
Resident Engineer (ARE) at Pakistan Kidney and Liver
Institute and Research Centre (PKLI & RC), DHA-VI, Lahore, Pakistan.
PKLI & RC (Pakistan Kidney and Liver Institute & Research Center) DHA Phase-VI, Lahore. It's Asia's biggest hospital worth RS. 34-billion Project, being built on 60 acres of land. Total covered area 4 million sqft. Kidney and liver hospital is 800 beds, Center of excellence is 800 beds and Dialysis is 200 beds.
• Correspondence meetings with Client & Contractors.
• Also performing as team head of Handing-Over_Taking-Over (HOTO).
• Make sure applications of RFI’s & Submittal’s and supervise the shop drawings as per site requirement.
• Maintain the quality and achieve the targets as per schedule.
• Inspect all materials & check all activities.
• Fabrications & installations of steel structure.
• Testing and Commissioning as per contracts.
• Make sure all is working according’s to updated drawings.
• Make sure complete legal documents & Physical Progress at Site w.r.t IPC.
• Supervising the final handing over taking over (HOTO) activities.
• Make sure IR’s is closed according’s to activities.
• Update the schedule & weekly monitoring progress.
• Finalized the snag lists/checklists & also handing and taking over.
• Supervised the underground water tanks (City water tank, Filter water tank, Boarding water tank, Stormwater tank), MEP corridor, Energy Center, all the steel structure of mosque, gray structure of hospital buildings, and also all the architectures activities (Tiles work, Gutka bricks, Dado work, Glasswork, Solid & Hollow Blocks work, Plasterwork, Paintwork, Waterproofing treatments of roof garden and Planter beams & others relevant activities), Special design of boundary wall.

公司标识
Cost Control Planning Engineer
DESCON Engineering Limited
Jul 2015 - Jan 2017 | Wazirabad, Pakistan

Ø  19-Months (July-2015 to Jan-2017) worked with DESCON ENGINEERING LIMITED as a Cost Control Planning Engineer in Planning Department at NEW KHANKI
BARRAGE, WAZIRABAD, PUNJAB, PAKISTAN.
 
Building Structure:
·       As a Site Engineer worked at Basic Health Unit (BHU), Overhead Water Tank (OWT), ARE House, CRE House, Seniors & Juniors Staff Quarter with all references of RITs, Site Monitoring Progress & Materials Reports.
·       Correspondence meeting with Client & Consultant.
·       Supervised all finishes activities (Gutka bricks, pigmented plaster, tiles work, plasterwork, paintwork &, etc).
·       Supervised the gray structure of different buildings and other relevant infrastructure. 
·       Management of all buildings & allied services at site activities.
 
Hydraulic Structure of Barrage Working at New Khanki Barrage:
·       Reconciliation of Concrete, Steel Rebar, Water Stopper, Fiber (Polypylene), Construction Sleeves, Dowel Bars, Bricks, Wooden Items, and Other Materials.
·       Worked at AUTO-CADE drawings of Main Barrage, Guide Banks and Building as a FEDE Engineer.
·       Worked at RFI / RIT (Request for Inspection) in SAP (Systems, Applications & Products) by using the Transaction code QM01 & QM10 of Irrigation Buildings, Roads, and main hydraulic structure.
·       Budgeting and Monitoring Variation Orders (VO’s) Up-Stream Left & Right Guide Banks of New Barrage.
Monitoring of Earth Working in which Quantity, Equipment monitoring for Embankment of Roads and Guide Banks of New Barrage.
·       Comparison of Actual & Planned Cost for the Dismantling of Old Mechanical & Civil Hydraulic Structure of Barrage.      
·       Depreciation of POL of HTV & LTV Cost Center Wise (CCTR) and Equipment Wise.
·       Overall Cost Incurred. Unit Rates of Materials.
·       Salary Comparison for Direct Labor.
·       Monitoring of Equipment & Progress of Dismantling of Existing Barrage.
·       Plan Revenue FTM and Actual Revenue for the Previous Month.
·       Schedule Plan Weekly Equipment Report.
·       Working at BCTC (Balance Control to Cost) of New Khanki Barrage Project. 
·       Care & Handling of Guide Bank Up-Stream, Down Stream, Left & Right Side, and Worked at Coffer Dam.
·       Cost monitoring of dewatering and Un-Watering of all Projects of Barrage.
Monitoring of Manpower with respect to Planned &Actual Man-hours on Monthly Bases.

公司标识
Site Engineer
SAAD-ULLAHA Khan & Brother's (SKB) Construction Company
Apr 2014 - Jul 2015 | Lahore, Pakistan

Ø  15-months (April-2014 to June-2015) worked at SKB (SAAD-ULLAHA KHAN & BRO.) Head Office Lahore, Punjab, Pakistan.
·       (7- months Worked in Bidding Department as Assistant Proposal
 Engineer at SKB Head Office Lahore.)
ü  Prepare the summary of upcoming Projects for Bid.
ü  Coordinate the running projects by the site management team.
ü  Upcoming and ongoing letters.
ü  Calculate the quantities for bill of quantities (BOQ).
ü  Maintain the IFC & Revised drawings data.
ü  Calculate the cost estimate of upcoming projects.
Attend the pre-bid & final-bid meetings.
·       (8-month Worked as a Site Engineer at Building Project of NFC RESIDENCIA Model Town, Lahore, Punjab, Pakistan).
ü  Correspondence meeting with Client & Consultant.
ü  Supervised all finishing activities at site (Gutka bricks, tiles work, paint work, garden lights, plaster work, installation of doors & windows according to drawings).
ü  Make sure the external development according to site gradation plan.
ü  Management of all trenches, foundation of pads and building site activities according to approved schedule.
ü  Calculate the quantity of required materials.
ü  Procurement required the materials from market.
ü  Make sure that work done according to quality assurance and quality control (QA/QC) at site.
ü  Monitor the actual progress vs plan.
ü  Monitor the actual cost vs plan.
Arranged the required equipment’s, materials and formworks for project.

学历

The Superior College
哲学硕士, Civil Engineering‎
Civil Engineering
Completed
2019

技能

中级 3D Software Tools Command
熟练 Analytical Skills
熟练 Civil Design Knowledge
熟练 Civil Planing
熟练 Civil survey
熟练 Computer Skill
熟练 Condition Monitoring
熟练 Construction Consulting
熟练 Construction Management
熟练 Ecellent Communication Skills
熟练 Excel Formula's
熟练 Financial and Budgeting Skills
熟练 HSE Management Systems
中级 Microsoft Project
熟练 Monitoring Analysis
中级 Rhinoceros 3D Rhino
熟练 Software Working
熟练 Use of Medical Equipment
熟练 Voltage Systems Handling Skills
熟练 رسم الآلات

语言

熟练 乌尔都语
熟练 旁遮普语
熟练 英语