Pakistan Motorway M4 ⅡB, overall length is 30km, from JAMANI to SHORKOT Section (Km89+200 to Km 119+200).
The Owner: National Highway Authority of Pakistan
Funding: Asian Development Bank
The bidding price of the contract is 88,270,000 USDs, the total time limit is 730 days. There are bi-directional four lanes. Therein, subgrade project needs backfilling 6,530,000m³, excavating 26,000 m³, concrete 74,000 m³, asphalt concrete 136,000 m³. The structure is constructed with 5 bridges, 101 pipe culverts, 39 box culverts, 6 cattle creeps, 31 subways, one service station.