To get a challenging and responsible role in a dynamic organization, where I can contribute towards the growth of the organization and myself.
Working in ADC (F&P) Office Wana South Waziristan
Lower. Monitor and Consult MAGP Hard Activities, Such
as Construction of Prefabricated VC Offices, QLD Program
and District Packages. On Behalf of ADC supervise and
monitor AIP and ADP Projects and prepare the profiling of
both AIP and ADP for ACS Peshawar.
Working in Head Office. Prepared PC-I, Revised PC-I, T.S,
VO, IPC’s, Shop Drawings and Checking Contractor IPC’s ,
VO’s, TS and Drawings
i: Construction of Construction Of Rcc Bridge (Length
241m and 8 Span) At Touchi River Banda Village Miran
Shah NWD KPK.
ii: Construction of Sakhar Zai Water Channel (Length
4890m) Miran Shah NWD KPK.
iii: Construction of DPO and Special Branch Building
Miran Shah NWD KPK.
WASH Emergency and Up Scaling Rural Sanitation
Emergency Interventions and Pakistan Approach towards
Total Sanitation (PATS) in Bannu UC’s.
Supervising LLIN Survey and Distribution Project in Bannu UC’s.
Construction Of Be Energy Bulk Oil Terminal Thalian Chakri Rawal Pindi. Supervision and Management of all Civil Work. Preparation of IPC’s, Plotting all types of Shop Drawings of Allied Work i.e Ring wall of HSD Tank, Admin Building, gate House, Lubricant, Substation, Product Pump House, Gantry, Dyke Wall, Boundary Wall and Plot Filling. Did official Correspondence with client and consultants. Use man power and machinery for the betterment of company.
Construction of Swat Motor Way Project under FWO Sawabi. Phase-I 4 Km Main and 4 Nos of Loop Construction. Supervision and Management of Road & its Allied work and Preparation of IPC’s,Plotting X-Sections and all types of Shop Drawings of Allied Work. Did official Correspondence with client and consultants. Use man power and machinery for the betterment of company.
Improvement / Rehabilitation & Construction Of Road From Baran Dam Bannu to Bakka Khel Bannu Length 15 Km, Executing by Communication & Works Departments (C & W) Bannu. Supervision of Road & its Allied work and Preparation of IPC’s,Technical Sanctions, Plotting X-Sections, Profile and all types of Shop Drawings of Allied Work.
Worked at Hard Activities at PATS Project In three UC's and Camp Donner UNICEF. Hard Activities included Hand Pump, Pressure Pump, Disable Latrine, Demo Latrine, Hand Wash, Twinset Latrines, Drainage, Laundry and Installation of Water Tank. As well as Prepared Estimates, Bills and write Technical Report.