I can help industries in maintaining their machinery through hands-on maintenance skills and by applying reliability analysis tools.
Providing third party services to Signify for the project of the implementation of local production of high runner products under import substitution industrialization
Worked as a Project In-charge stationed at Jiangsu Dajin Heavy Industries, covering 62 milestones in a period of 2 yearsSupervised 9 engineering professionals for completion of Integrated Logistics Support (ILS) of Naval shipWorked as part of team of Jiangsu Dajin Heavy Industries for the information provision from equipment OEMsCoordinated with Local office, Jiangsu Dajin Heavy Industries Design team and OEMs for timely completion of submissionRepresented company at Field Level Coordination Meetings with Pakistan Navy (China), OEMs and Jiangsu Dajin Heavy IndustriesMaintained quality of deliverables by the Local office team
Prepared project schedule coinciding with construction schedule for project timely completionConducted project review meeting on weekly basis with shipyard concerned staff and dish out MoM as per agreed formatValidated the support of installed equipment and ILS throughout the ships' Deployment Cycle including visiting construction site and authenticating equipment fittings as according to maintenance personnel and operator extentPrepared MMS (PMS Schedule & JICs) of all equipment as per format given in PN agreed layoutPrepared parts data sheets of technical Manual IPCs parts as per order of assemblies and subassembliesSupervised ILS engineers and assign tasks as per the Ship’s deployment cycle.Developed & improved ILS business on documentation, training & special toolsSupervised the use of AR&M tools within the company, including FMECA & RCM
Assist the senior engineer in day-to-day maintenance activities
Diagnose faults in BOPP, CPP, Metallizers and Slitters in the plant facility
Keep a record of preventive and corrective maintenance activities
Create SOPs for repair actions
Control electrical inventory through SAP
Equipment testing
• Providing area, lighting and small power load calculations and verification of active projects
• Assisting Senior project design engineers in projects in Pakistan and UAE.
• Playing significant role in research and development
• Working with AutoCAD and Dialux Evo
PQA has 8 terminals on which private sector energy projects have been initiated. Therefore, I had been placed for 2 weeks respectively, to participate in their maintenance, operations and problem solving teams, at all the 8 terminals.
Following are the private sector projects I have worked for,
Fauji Oil Terminal & Distribution Company Ltd.
Project: Survey of ICCP system installed at FOTCO.
Duration: 1st June 2015 - 16th June 2015
FELDA WESTBURY Qasim (Pvt) Limited.
Project: Survey of Galvanic CP system installed at FWQ.
Duration: 25th June 2015 – 30th June 2015
ENGRO Vopak Terminal and ENGRO Elengy Terminal.
Project: Design solar system for administration building and control room
Duration: 6th July 2015 – 12th July 2015
K-Electric Bin Qasim Power Station (BQPS-1)
Project: Operational mechanism of thermal power plant
Duration: 4th August 2015 – 31st August 2015
Qasim International Container Terminal
Duration: 7th September 2015 – 30th September 2015
Project: Inventory management and heavy vehicles introduction (RS, RTG, STS, QC)
Pakistan International Bulk Terminal (PIBT)
Duration: 12th October 2015 – 30th October 2015
Project: Study of Conveyor Belt and Powerhouse
Port Qasim Authority
Duration: 3rd November 2015-30th November 2015
Project: Operational Mechanism of PQA