Total Experience 17 years
Working with Consultant, Contractor ,INGO ,NGO ,third party verification of Govnt projects . Working on Rehabilitation, New construction ,Designs, estimate , drawings and BOQs of below mention components in details .
Shelter Energy Efficient Houses , Lime stabilized mud shelter ,Low cost shelter ,Permanent shelter , 5 story residential Buildings , Labor Colony All new construction and Rehabilitation .construction through local and market building material
Agriculture Land levelling ,Water courses lining, de-silting work ,Drip irrigation ,Sprinkler irrigation ,pitcher irrigation .Kitchen Gardening , storage of seed bins.
Environmental Bio gas ,village cleaning, Dust Bins ,filling in ditches in the village through CFW, energy efficient stove, STU
Water resource On spot Hand pump shallow and deep ,Lead Hand pump ,Overhead water Tank ,Reservoir ,Tube wells , Tankas Nadi filter ,Bio sand filter ,
Mass communication Metaled Road ,Earthen Road , Brick Soiling road and village street ,Culverts
FSL
Livestock Construction of Animal Shade , Goat / sheep dips
Fisheries Construction of fish Ponds
Education construction and rehabilitation of school Buildings
Latrines Pit latrine ,Four-flush latrine ,Eco-sand latrine , in emergency ,recovery ,and development Phase
Hospital Rehabilitation of building ,and WASH components .
WASH components Trainings and implements PATS ,CLTS ,SLTS Also well know about PHAST,CHAST.CATS .Approaches in WASH
Testing
Water Testing ( physical ,chemical ,Biological )
Cement (Initial and final setting times )
Concrete (compressive strength )
Steel (Tensile strength ,Elongation)
Bricks (water absorption ,compressive strength ,material used in bricks )
Road (Field density test ,Asphalt density , sieve analysis of aggregates )
Nutrition HEART Approach ,
Core sector FSL, Nutrition , WASH , DRR in Development ,Emergency ,Shelter .
Working with institution Consultant Ashock Associate , FWO ,Umar munshi ,SAM PAK LTD
NGO SAFWCO , RDF, BRDS, LHDP, Indus Earth , NDS, SDI
INGO Islamic relief , Acted , Qatar Charity , SIF , IRC , Johnitier International Assistance , Malteser International Pakistan ,
Thanks sir Above is a brief history and introduction of myself .
Working on project Strengthening capacities of vulnerable communities through inclusive humanitarian WASH and Food Security measures through integration of disaster preparedness in district Sanghar, Sindh province/ Pakistan. Complete Task rehabilitation of school Buildings ,Lead & on-spot hand pumps ,Demo latrines for CLTS approach ,Different CFW Schemes
Non profit organization working on "project Securing water Rights and use for farmers in Mirpur khas " Purely on Agriculture Based Project ,Funded By Trocair .
I have Prepared BoQ ,Design and implements in field such activities , construct 20 Washing pads,construct 20 culverts ,2000 m lining of water course ,Repair Head Regulator of minor ,Repair of 32 out lets of minor ,construct 20 water ponds ,Repair Critical section of water course ,Repair Critical section of Minor
• Primarily survey for pre- feasibility report of scheme
• Prepared BOQ, Estimation, Drawings, and Design of Easy latrine , Low cost demo latrine ,Water supply schemes Hand pumps ,DRR Kits .
• evaluate the quantity of required material which utilizes in construction
• Supervise and well orient to staff on activity and steps
• Review and comments for material submitted in accordance with project specification.
• Supervision of the projects, monitoring the site as per the scope of work.
• supervision all the schemes works accordingly specification & BOQ
• Maintaining progress record, inspection records etc.
• Inspection all material delivered to site for the approval as per project
• Planning for construction of activity within duration
• Timely Resolving all issue regarding construction
• Reporting all activity to PM.
• Planning for implement All soft Activity within timeframe
• Planning for implement CLTS Approach in community
• Planning for delivered health and hygiene session through Different methodology (Games ,songs, Session )
• Prepared all IEC material Regarding heath and hygiene session
• Distribution of Hygiene kits
• Prepared all BCI regarding purchasing all required material
• Ensure all quality of material as per provided specification and standard of organization
• Prepared planning for village cleaning campaign
Prepared BoQ of model latrine,Bio sand nadi filter ,Chalo Pond ,Nadi pond ,Rehabilitation of Dug well,IEC material for clts Approach ,Orient and implement health and hygiene awareness session in field ,Distribution of hygiene kits
contruction of lime stabilized mud brick shelter
Working on PATS Approach
Construction of STU ,Latrine, Water ponds ,Hand Pump -Lead-Deep-Solar -On spot
Construction of Permanent RCC 250 Houses