ACADEMIC/PROFESSIONAL QUALIFICATION
Abasyn University Islamabad
campus 2017 BEE 2.75/4.0
Mardan Board 2013 FSC B
Mardan Board 2009 SSC A
Elective Courses Power System Analysis, Power Generation, Power Electronics, Power Engineering
During this internship I have developed my skills in Maintenance, Operations and Planning Department.
In maintenance, I got knowledge in following
• Different tests of Generator and Transformer.
LIKE MEGGER AND LOOP RESISTANCE TEST FOR MOTOR , DISCREPANCY AND LOOP TEST OF CIRCUIT BREAKERS, EARTH RESISTANCE TEST AND OIL TEST OF TRANSFORMER
• 132 / 220 KV Switchyards Protection.
• Maintenance of different electrical components.
In operation, I got knowledge in following
• Overall process theory of combined cycle technology.
• Start-up and shutdown sequence of Gas Turbine, HRSG and steam Turbine.
• Gas Turbine, HRSG and Steam Turbine alarms and protections.
• BOP's AND plant auxiliaries.
• Generator, Transformer and Bus Bar Electrical Protections.
• Electrical Diagrams.
• Monitoring and analyzing plant operating parameters to predict potential faults and taking appropriate actions.
• Providing safety from system derived hazards to personnel working on plant and apparatus by implementing KAPCO safety rules.
• Monitoring of plant efficiency parameters and taking necessary actions if there for any abnormality.
In planning, I got knowledge in following
• Planning of routine maintenance activities and enabling the business to meet availability, reliability, efficiency, generation and cost targets, safely and coordination among the departments.
• KPI monitoring by checking outstanding works of fault and preventive maintenance and generate report from CMMS as Key Performance Indicator report regularly.
• Planning and troubleshooting of power plant equipment with good reporting capabilities.
• Check quality and accuracy of maintenance project schedules, analyze schedule variations and evaluate trends.
• Look after all maintenance and make sure all is being considered and implemented in the maintenance plans.
• Circulate monthly report to reduce backlog in CMMS by checking PM/CM ratio to ensure maintenance only when it is actually required
9HA GE COMBINED CYCLE POWER PLANT, CCPP OPERATIONS TRAINING
POWER PLANT VISITS AND ON-SITE ASSIGNMENTS (PQR)
Controllers: Arduino , raspberry pi and software development Projects