1. From 15th May 2015 i am working as Assistant Manager Electrical in Al-Hussain Traders Contractors Lahore, Posted in Hyderabad.
Project 220KV New G/S Jhampir to 220KV T.M Khan (Lot-I).
2. From 11th Feb 2013 to 30th April 2015, worked as an Electrical Engineer in Integrated Digital System (IDS) Hyderabad.
3. From Sep 2012 to Feb 2013, worked as a Technical Assistant (Procurement) in SIEMENS Pak. Engineering Company Karachi.
Responsibilities
Responsible for the preparation of TOCO (Total Cost of Ownership of Projects).
Responsible for the preparation of Comparative Statement of suppliers offer.
FAT (Factory Acceptance Test) I am also perform a Fat Auditor.
4. From Sep 2010 to Sep 2011, worked as a Trainee Engineer (Electrical) in AL KARAM GAS TURBINE POWER GENERATION PLANT at Karachi.
Responsibilities
Operation Maintenance of Power generation plant which includes
Analyzing, Monitoring and measurement of Temperature.
Analyzing, Monitoring and measurement of Pressure Load of DEMI water treatment plant, Turbines Boilers on Hourly basis with various test gear instruments to perform preventative and corrective maintenance.
• Responsible for the preparation of TOCO (Total Cost of Ownership of Projects).
• Responsible for the preparation of Comparative Statement of suppliers offer.
• FAT (Factory Acceptance Test) I am also perform a Fat Auditor.
• Operation & Maintenance of Power generation plant which includes:
• Analyzing, Monitoring and measurement of Temperature.
• Analyzing, Monitoring and measurement of Pressure & Load of DEMI water treatment plant, Turbines & Boilers on Hourly basis with various test gear instruments to perform preventative and corrective maintenance.