To seek knowledge and innovation by engaging myself in a challenging environment, this will provide growth of my abilities and skills. I can utilize my technical skill, experience and capabilities to perform specific tasks and run an organization successful. I am a dynamic individual and throughout my coursework have been involved in Project and Engineering Management.
Working as Engineering Service Coordinator in raw milk collection and supply department name as MPAS from February 1,2018 till time. My responsibilities as Engineering Service Coordinator included:
Coordination of all operational and maintenance activities in Milk Collection Centers/Dispatch Points for smooth milk Purchasing, Chilling and Suppling operation.
Coordination with Service Technicians and MCCs staff for solving fault in minimum duration.
Making rotation plans for Service Technicians for inspection in daily, weekly and monthly.
Ordering and receiving new equipment, tools, machinery etc. and calculate its total costs.
Maintain all records about tools issuance, approvals and other documents.
Organizing technical and HSE training sessions for mobile staff.
Making schedule for visiting Head Office Engineering staff and Engineering Manager to MCCs and DPs.
Prepare budget and technical report about ongoing/upcoming projects and finalizing its invoices with Account Department.
Ensure all necessary material availability in warehouse and field.
During the flash milk session organized and review previous contract with vendors for enhance men power.
Preparing Medical invoices and salary scroll of staff and hand over to HR department.
Harappa Solar Power Plant have 18MW installed capacity with Sigle Axis Tracking System I’m worked as Site Supervisor my responsibilities as Site Supervisor included:
Ensure teams’ availability, tools and safety at working site.
Review and brief discussion about drawing with Project Management and trained workers before going to site as per approved drawing.
Supervision of the Photovoltaic (PV) Module frames fitted, low & high voltage cable laying, installation PV Array with Combiner Boxes.
Monitoring the installation, testing and commissioning of Sigle Axis Tracking System.
Supervision of the installation of 3MW Inverter boxes.
Ensured execution of all work as per approval drawing.
Have also performed Megger Test, Insulation Resistance Test of Photovoltaic modules during the installation.
Clearing fault in minimum duration to complete work within short time.
Daily work reporting to Project Management.
I have done my summer Intership in Fazal ur Rehman Fabrics, Multan. during my intership i learnt following:
Learnt triple M safety rules (Man, Machinery and Material)
Power Plant hazard, production and distribution.
Equipment’s maintenance and troubleshooting with plant team.
Calculating power consumption of each department (Auto Cone, Sizing, Weaving and Packaging)