My motive is to grow professionally by developing skills and competencies for betterment of humanity. I have got
exposure of working as a leader, team member in different public and private sector organizations. Especially, in
departments i.e. Power Generation, Transmission, Distribution, Utilities and Manufacturing. Where, I have developed
different techniques which enable me in performing analysis, planning, operation, project management and
achieving goals within the framework of area.
Role and responsibilities
Responsible for managing the overall operation of Laptop department i.e. team of 150 employees.
Responsible for Planning, Assembling, Production, Quality, Warehouse, import of shipment and Audit.
Complete handling and operation of SMD Machines for Production of Main board and IO Board.
Responsible for making, maintaining and implementation of overall SOPs.
Complete analysis of quality of material and direct communication with vender for productivity enhancement keeping in view customer satisfaction in case of problem.
Propose performance improvement plan and implement it by giving best possible solution in case of faults.
Ensures timely project completion i.e. achieving targets within specified time and budget.
Training the workforce for better Production and Quality.
Work as a leader and team player in dynamic, energetic and proactive environment with other teams.
Daily communication and reporting to Chinese and Pakistan Project Manager.
Take prompt action to solve process problems to ensure safety, product quality, machine and manpower efficiency etc.
Coordinate among different working processes of the whole production line or among functions in factory.
Responsible for overall operational efficiency of production line with all Process KPIs and performance or process equipment's.
Develop and maintain trust based relationship with customers.
Proactive approach for emphasizing defect prevention by analyzing the data
Interactions with various equipment service venders and stake holders.
Work in AES LalPir & PakGen Thermal Power Plant of 730 MW based on Oil Fired most efficient IPP.
Boiler steam generation capacity of 2 x 1200 TPH and fuel 2 x 80 TPH made by (MHI). Steam Turbine 2 x 365 MW. Generator 2 x 429MVA made by Parson Electric. 1 MW solar park.
Responsible for assisting start up, shut down, trouble shooting performance, meeting KPI standards, efficiency and protective testing as per safety requirement.
Plan and perform assigned tasks within the framework of areas’ schedules, budget, quality and cost constraints.
Collaborate and contribute with manager in setting realistic and challenging operation goals·
Propose new analyses, techniques and methodologies with respect to specific area of responsibility where applicable.
Principle contact and liaison between the maintenance department and operation planning.
Ensure area assigned and conditions based (from DCS, PLC and Local area) professional operations service in a timely manner to ensure high equipment healthiness, availability and performance.
Maintain all planned work requests in area with appropriate resources to set a preliminary priority.
Perform raw water pre treatment activities for water in Cooling Tower. Post treatment water activities for Demineralised water i.e. use in Boiler for steam production. Laboratory testing and environmental parameters.
Also complete training on boiler which includes Fuel supply, firing, burning, air and gas system. Steam water cycle and operation of soot blowers.
Get a brief experience of Turbine area which includes HP, IP, LP turbine, its respective extractions, Boiler feed water pumps (6.3 MW discharge pressure of 230 Bar), LP,HP Feed water Heaters.
Maintain safe operation of 365 MW Generator and associated axillaries i.e. Generator Excitation system, Hydrogen cooling system, Stator water cooling system, Hydrogen Seal oil.
Complete understanding of 220 KV Switchyard, Unit Electrical Load, and Generator step up Tra