Process Engineer with experience in Feasibility studies, Conceptual/Pre-Feed Design, FEED/Basic/Preliminary design & Detailed engineering activities of Refinery, Petrochemical and Oil and Gas (Oil & Gas upstream facilities, Gas Processing Facilities, Gas Compression Plants).


Key Qualifications:


  • Process key document preparation for e.g. P&ID, PFD with H&MB.

  • Process simulations (using HYSYS, UNISIM),

  • Equipment sizing and rating/adequacy check (pumps, separators, tanks, towers, knockout drum, heat exchangers).

  • Calculations: Pumps & control valves, Evaporation Pond Sizing, Desalter PSV and blowdown, Instrument sizing calculations.

  • Equipment List, Line list, Line Sizing.

  • Preparation of philosophical documents such as operation and control, Vent & Drain, Tie-in, Isolation and shutdown philosophy etc. Preparation of Process design basis, process control documents like interlock description, cause and effect diagrams, Operational safeguarding narrative etc.,

  • Process datasheets for static and rotary Equipments (Vessels, Pumps, Towers, Tanks, Heat Exchangers etc.),

  • Conversant with following Engineering Softwares:Process Simulation Software Like Aspen HYSYS, Aspen Plus & Unisim,

  • Pipeline Hydraulics, Flash Calculations,

  • Ariel Compressor Selection for Various Applications.

  • Heat Exchanger Sizing by using HTRI & EDR,

  • Column Sizing by using SULCOL & KG Tower,

  • Control Valve Sizing by using FISHER,

  • PSV Sizing by using Size Master,

  • Familiar to well-known engineering codes and standards like API 520, API 521, API 610, API 660, API 661, API 650, API 560, API 2001, GPSA, TEMA, SHELL DEP, standards and Design Practices.


项目

Production of Ethylene from Naphtha Cracking

工作经历

公司标识
Process Engineer
ILF CONSULTING ENGINEERS ABU DHABI
Jun 2017 - 代表 | Abu Dhabi, United Arab Emirates


Project: FEED Services for Mirfa Plant Optimization Study (Mirfa Turndown 2) (Client: ADNOC Gas Processing, Abu Dhabi)
Key Responsibilities:
Involved in preparation of Process Description, Process Engineering Narrative, Process Flow diagrams, Piping and Instrumentation Diagrams (P & IDs), Equipment List, Line List, Adequacy report for Existing facilities, Utility Summary, Process Datasheets for Pig Launcher, Pig Receiver, Pressure Reduction Skid, Gas Metering Skid, Filter, Nitrogen Injection Compressor, Relief, Vent and Blowdown Philosophy, Vent and Depressurization Studies Report, Isolation & Tie-In philosophy
Project: Pre-FEED/Conceptual Study for Engineering Services for BUT Upgrading Phase II (Client: CNOOC Iraq)
The project scope is to perform the Conceptual Study/Pre-FEED Study and provide the debottlenecking solution for expansion on BUT Terminal from 300 to 350 KBOPD. Adequacy studies of existing equipment, FEED for flare tip with steam system Upgrade
Key Responsibilities:
Block Flow Diagram (BFD) of BUT CPF Facility
Process Flow Diagrams (PFDs), Utilities Flow Diagram (UFDs) for BUT CPF Facility
BUT CPF Facility Equipment's Process Datasheet
Equipment List
Two Trains Expansion Line Sizing Report
Crude Oil Storage Tanks Expansion Study Report
Adequacy Check Report of Utilities (Hot Medium Oil System, Nitrogen Gas, Instrument Air, Plant Air, Steam, Sweet Gas, Fresh Water)
Adequacy Check Report: Pumps, Slug Catcher (Including Emulsion Study), CPF Heat Exchanger, Water Bath Heaters, Stripping Towers, Wash Water Tanks, NGP-Boiler Section, NGP Compressor Section
Equipment Calculation Report
Adequacy Study Summary Report, Conceptual Design Report
Project: Detailed Engineering for Replacement of HSK/HCK Compressor and Steam Turbine & Upgrade (Client: AG Projects Group, UAE)
The project scope is to replace the existing centrifugal compressors with a new higher efficient machine from the same manufacturer with improved sealing and control systems and Overhaul/Upgrade of Steam Turbine.
Key Responsibilities:
My responsibilities were to update Process Design Basis, to develop Process Flow Diagrams PFDs (Construction & Demolition), Interface P&IDs (Construction & Demolition) as per new Vendor package (New Compressor & Turbine System, Lube Oil System, Seal Gas System), Interconnecting Tie-in P&IDs (Construction & Demolition) for all process, utility, flare, vent and drain lines connected to new Vendor package, Attended HAZOP & SIL Studies by Vendor and updated deliverables as per HAZOP recommendations, Line List, Anti-Surge Valve Sizing Calculations, Interface P&IDs review meeting
Project: Pre-FEED/FEED for CPF Extension at CPF S-1 Well Site, Garmian Block, Kurdistan for CPF Expansion and Gas Facilities (Client: Gazprom Neft Middle East B.V. Iraq)
Key Responsibilities:
My responsibilities were to develop Process Block Flow Diagram, PFDs, MSDs, Equipment's Process Datasheet, Vertical K.O. Drum (LTS) Sizing Calculations, Horizontal 3-Phase Separators Sizing Calculations, Separators Adequacy Check Summary & Report based on revised PW rate, Mist Extractor CS Area Calculations, Water and Salt Content Balance for 2-Stage & 3-Stage Desalter, Evaporation Pond Sizing Calculations, Evaporation Pond Adequacy Study, Adequacy Check of Storage Tank, Chemical Consumption Summary, Utility consumption summary, Equipment List.
Project: FEED Engineering Production for Power Plant Expansion Phase III & IV (Client: CNOOC, Iraq)
The project scope is to study the Power Plant Expansion, Missan Oil Field demand for electricity for different stages of the field development plan, FEED design for Expansion of the Existing Power Plant Phase III.
Key Responsibilities:
Involved in preparation of Simulation Report, HMB, PFDs, P&IDs, UFDs, Equipment List, Line List, Utility Adequacy and Design Report, Depressurization Report, Tie-in Philosophy, Isolation Philosophy, ESD Philosophy, Relief, Venting, Drainage & Blowdown Philosophy, Cause & Effect Chart
Project: Detailed Engineering Sarsang Oil Export Pipeline Detailed Engineering (Client: KAR Group Ltd., Erbil, Kurdistan Region)
Key Responsibilities:
Involved in preparation of Overall System Flow Diagram, PFDs, P&IDs, Equipment List, Line List, Line Sizing Report, Control Valve Calculation Report, Thermal Relief Valve Sizing Calculations, Utility Calculations, Utility Adequacy and Design Report, Cause & Effect Chart, Operating Control & ESD Philosophy, Steady State Hydraulic Study Report, Transient Analysis Hydraulic Report.
Detailed Engineering for Reinstatement of Dislocated STH Line and Installation of New Drip Legs Steam Traps in Pipe Racks 92/77 Habshan (Client: Descon Engineering Limited, UAE)
Key Responsibilities:
P&IDs
Line List
FEED/Detailed Engineering for Ain Sifni Development Plan, Engineering Services (Client: HUNT Oil Middle East Limited USA) for EPF facilities
The project scope is to provide Engineering support and services for EPF facilities.
Feed/Detailed Design for 8kbopd new gas /oil separation Train plus Utilities.
Feed /Detailed Design of a Fuel Gas treatment and sweetening unit plus 6kbfpd Test Train.
Key Responsibilities:
Involved in preparation of BFD, Oil, Water & Gas Processing PFDs, P&IDs, Utility and Distribution System P&IDs, 3D Model review using NAVIS work, Equipment List, Line List, Hydraulics/Line Sizing Calculations, Process Cause & Effect chart Update, Utility Consumption report, Tie-in philosophy, ESD & isolation philosophy, Start-up shutdown & drain relief philosophy, Instrument valve sizing.

学历

University of Engineering & Technology
学士, BSc, BSc Chemical Engineering Technology‎
Chemical Engineering
2017
Govt. Post Graduate College Sheikhupura
中级/A级, 理学院(工程预科), FSc Pre-Engineering‎
Mathematics, Chemistry, Physics
所占比重 72%
2012
BISE Lahore
大学入学/0级, 科学, Matriculation (Science)‎
Chemistry, Mathematics, Physics
所占比重 83%
2009

技能

熟练 ASPEN Hysys
中级 EDR
熟练 Handling Assignments
中级 HTRI Software
熟练 Unisim
中级 رسم الآلات

语言

熟练 旁遮普语
熟练 乌尔都语
熟练 英语

关注的公司