Proactive, Self-motivated and ability to work in diverse environment, Good verbal and
written communication skills, Ability to work alone or as part of a team, Extremely
productive in a high volume and high stress environment.
Handled a number of relevant jobs to construction such as supervision, Preparing of bar
bending schedules, Estimation, Billing, Planning and Correspondence with consultants,
Client and sub-contractors and all technical evolution of various parameters related to
changes in design etc
• Plan all construction operations and schedule intermediate phases to ensure deadlines will be met
• Resolve complex design problems, demonstrating a tenacious approach tackling problems
• Establish and maintain working relationships with a range of multidisciplinary stakeholders, demonstrating strong influencing skills
• Advocate and promote the company’s well-being strategies and policies
• Quality control to ensure that all execution works are in line with industry and legal standards
• Advise logistics department on developing and managing construction contracts
• Responsible to ensure that latest management systems are followed by our department, adequate safety of staff and other personnel at site is maintained
• Regular checks and follow ups with all parties concerned for progression of all works
• Proposing third part to carry out peer review /value engineering exercises in case of major defects
• Co-ordination with the consultant for selection of the materials specification and reviewing the tender and contract document.
• Following up with the contractor to mobilize on site as per the time frame
• Performing risk and value management and cost control
• Giving timely feedback on yours and your section’s performance with weekly performance reports to the Managing Director
• Ensure the proper utilization of material and control misuse and wastage of material
• Timely arrange labor and material for construction requirements
• Supervising contracted staff, checking the bills of subcontractors; Ensuring projects meet agreed specifications, budgets and timescale
• Ensure the proper utilization of material and controlled misuse and wastage of material
• Make sure construction work according to drawings of project and planning
Project
Construction of LOTTE KOLSON pvt. Ltd.
(Chocó pie production unit:11,52,000 packets/day + LOTTE Spout Production Unit) 50km lahore-multan road
• Buildings: PEB- Steel Structure Factory, Offices ground & 1st floor, PEB- Steel Structure Waste Water Treatment plant, Waste Storage & Boiler Room
• Position: Architecture, Civil & QA/QC Engineer
• Consultant: LOTTE E&C, MAP HANTERIN Architectures & Engineers co., Ltd.
• Client: LOTTE KOLSON pvt. Ltd.
• Activities performed:
• Plan all construction operations and schedule intermediate phases to ensure deadlines will be met.
• Conduct routine inspections related to SOG’s, Steel Structures and survey of the site using Total Station
• Conduct inspections related to installation of Sandwich Urethane Panels, PIR panels, Al. Composite Panels, Glass Wool Sound Proofing Acoustic Panels and Standing Seam Roofing System & Drywall & Acoustic Tiles
• Conduct routine inspections related to Sika Flooring 5mm ( Epoxy screed with ‘Sikafloor 161’ and ‘Sikadur 506’ +self-leveling ‘Sika floor 263 SL and Sikadur 504’) and Epoxy Self leveling mortar ensuring the hygienic conditions
• Ensure the proper utilization of material and control misuse and wastage of material
• Inspection & Supervision of all the work as per approved design, drawings, standard specifications and within provisions of the contract
• Supervising contracted staff, checking the bills of subcontractors; Ensuring projects meet agreed specifications, budgets and timescale
• Liaising with subcontractors and other professional staff, checking and preparing site reports and drawings
• Providing technical advice; problem solving, Ordering and negotiating the price of materials, Ensuring site safety
• Evaluate progress and prepare detailed reports
Construction of ATTOCK CEMENT Factory Pakistan ( Line III,4000 TPD),
Hub Lasbela Baluchistan
i) Project
• Buildings: Pre Heater , C.T, Rotary Kiln Department & Coal Grinding, Clinker Cooler, Dust Collector & Main C.C.R
• Position: Site Engineer
• Consultant: A.A.Associates (Planners & Consulting Engineers) & HIFEI China
• Client: ACPL
• Activities performed:
• To ensure that the project construction and execution of work may be executed properly in true letter & spirit to achieve the ACI standards on site
• Ensure that all operating equipment, tools and plants meet standards prior to its deployment at project site
• Follow on of daily job activities & execution work as per required standards
Responsible to Coordinate to Client and Other departments regarding Project
• Determined needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitation.
• Ensure the proper utilization of material and controlled misuse and wastage of material.
Construction of Style Textile Mills, 2.5 km off Manga Mandi , Lahore
i) Project
• Building: Finish Fabric Store, Dyeing & Finishing Unit, Utility Block, Chemical Store Double Story Building & Induction Store (Double Story Building)
• Area: 41,000 sq. ft.
• Position: Site Engineer
• Consultant: A.A.Associates (Planners & Consulting Engineers)
• Client: Style Textile (pvt.) ltd.
• Activities performed:
• Establish and communicate the standards to all employees and sub-contractors
• Done the routine Inspection of overall layout of the building
• Prepared the bar bending Schedules
• To ensure that the project construction and execution of work may be executed properly in true letter & spirit to achieve the ACI standards on site
• Preparing of Bill of Quantity
• Supervision of all the work as per approved design, drawings, standard specifications and within provisions of the contract
• Follow on of daily job activities & execution work are as per required standards
• Responsible to Coordinate to Client and Other departments regarding Project