05 Years Office and Site Experience in Building Constructions and Underground Wastewater Treatment Tanks and Superstructures).
Site Execution • Project Management • Prepare Bar Bending Schedule • MS (Word, Excel, PowerPoint)• Estimate, Bill of Quantities (BOQ)• Inspect the Quality of Project Materials • Site Progress Reports• Layout or Demarcation on the Ground• Health and Safety Measures• Monitoring Technical Design aspects• Technical and Design Implementation •Setting out level of the Site.
Technical Support to implementation of WASH related interventions. Technical Support to ensure all Infrastructures Project which is constructed under as per government rules and
climate resilient.
Lead to management of Innovation of the Project.
Site Execution, Project Management, Check the Quality of Building materials, Calculate Quantity of Building Materials, Preparation of Bill of Quantities (BOQs) and Estimates, Understand the Plans, Elevations, Sections of any Particular Drawing.
Site Supervision, Feasibility Study, Quantity and Quality Inspection, Bill of Quantities (BOQs) and Estimates, Preparation of CAD/ Engineering Drawing, Survey Maps and Layout.
An autonomous organization working under the administrative control of Ministry of Science and Technology, to cater the need of Research and Development in the field of housing and works.
Duties:
Worked for Light weight Aggregate Project and Water Testing Laboratory, Tested the structural member (Column) through Non-destructive Test (NDT), Worked at Laboratory Testing Extension Services Section (LTES), Worked at Construction & Material Section (CM), Worked at Geo-Tech Laboratory
A Public sector autonomous body working under the Federal Government of Pakistan through Aviation Division Cabinet Secretariat, which oversees and regulates all aspects of civil aviation in Pakistan.Duties: Planned the design of Airport, Estimated the cost of a Single Room , Estimated the cost of Roads
A Pakistani Federal Government agency that oversees the Operations of the Port of Karachi.Duties:Worked on Reconstruction of Berth 15-17 A including SRB’s 1 & 11 on East Wharves at a Port of Karachi site.