i have almost 14 years of professional experience out of which 6 year was s Teaching specific for Associate engineers at ITRD Chitral along with professional responsibilities. where I have taught 2 Batch of Electrical department comprising 17 and 23 students capacity Both.I have latest teaching skills,innovative methods of teaching and sound concept in Maths,PhysicsChemistry and Hene all other subjects including English.i Believe that I am competent,dedicated and energetic with high quality of students motivation and abide by the rules and code of conduct.I am ready to accept teaching related task with utmost enthusiasm and zest.My other technical expertise are here also for overview.
Graduated in Electrical Engineering from UET Peshawar, I have a diverse and substantial work experience of more than 12 Years in the fields of Power Sector, Data Center Power Management & Maintenance ,Electrical installation as per IEEE and NEC standards, Testing of Electrical Equipment’s ,Preparation of Preventive maintenance & Implementation, Battery Bank installation, Setting and testing, Supervising teams and providing Technical support to teams, Expertize in Multi-vendor Management, Leading role in Diesel generator overhauling for company(for more than 900 cell sites) and providing acceptance after testing and procedure, Experience in Energy management software and looking after Power Cluster ,added responsibility of being technical focal person for North-ii Region for sales team and customers, expertize in fault identification and rectification of electrical equipment’s such as Diesel Gensets , UPS, Rectifier ,ATS,DP and Low voltage transformer. Excellent understanding and skills in executing Roll out projects including civil structure, Engineering drawings and MEP drawings. Excellent demonstrative skills and understanding in preventive maintenance of medium and high volt (11 KV and 220 KV) Grid stations. Installation of Circuit breaker  , Disconnector Switch ,CT and PT at SWICTH yard of 132 KV Grid station .Giving cable layout for medium volt indoor and outdoor Grid. Design & implementation of Solar set up for irrigation and domestic, commercial need of solarization.
Apart from Power arena, I have in Hand experience of operation and maintenance of Communication (BTS, BSC, Microwave, and Satellite) .KPI reconciliation with Multiple vendor (Huawei, ZTE) on behalf of company (Mobilink GSM Pakistan) for final invoicing. Excellent Auditor of Equipment’s (Power and Communication) & addressing fault well in time before MTTR Breached. Clear command on hand overing and take overing of company assets from security vendor to new security vendor.
 I have always focused on utilizing the learned skills effectively and efficiently and strongly believe in the philosophy of working beyond the call of duty.Â
 Electrical Supervisor on Behalf of WAPDA with Fitchner consultant Power Generation on Golan Goal Project 108 MW (2 Years):
I have worked with ANDRID HYDRO team as Field Engineer at Golangol Power House chitral since June 10 2017—Dec 2018. I have actively worked in execution of MEP drawings, installation of Grounding mesh of switch yard, Synchronous Generator, stator, rotor, turbine, HVAC system, MV circuit Breaker, Power cable, Auxiliary transformer, UPS system, Battery Banks, Installation of High voltage equipment’s, Current transformer, Potential Transformer, Capacitor Voltage Transformer, Line trap, Disconnector Switch, Grid coupling Transformer, Circuit Breaker (SF6 for 132 KV system), Busbar 1 and Bus Bar 2. Routing of Power Cable, Control cable and Termination of Cables according to Drawing, installation of Power Cubicles according to Electrical Drawing. Adjustment of Disconnector switches individually and combines.
 ü Actively Performed Electrical Testing on Equipment’s details is as under.
 ü Continuity test of Power Cables
 ü Resistance test of Power cable
 ü Induction test of STATOR
 ü Tan delta test of Generator.
 ü Tan delta of Transformer (45 MVA)
 ü Winding Resistance test.
 ü Winding impedance test.
 ü Grounding resistance test of switch yard Mesh.
 ü Auto operation and indication of MV circuit Breakers LED and verification.
 ü Checking of tagging and proper installation with proper routing of cables (Power+ Control)
 ü Test Operation of circuit breaker for 132 KV switch yard.
 ü Open /Close time testing of individual phase and then Gang operation
 ü Contact resistance test of Circuit breakers.
 ü TTR test for 45 MVA transformers& 200 KVA & 100 KVA transformer auxiliary transformer.
 ü Insulation resistance test of Bus bars, Power cables.
 ü Dehydration test of transformer oil on site.
 ü Open close timing of disconnecting switch.
 ü Hotspot testing of stator conductor.
 ü Verification of proper installation according to single line diagram of switch yard equipment’s.
 ü Rotor pole insulation test via megger.
 ü TTR test of Current Transformer.
 ü TTR test of PT.
 ü TTR test of CVT.
AS an internee Engineer at Sangjani 500 KV/220 KV grid station Taxila(jan-2017-March-2017):-
Â
 ü Worked with NTDC team and actively participated in shut downed activities of circuit breakers, transformer 160 MVA, Disconnector switch, and testing of breakers, CT’s ,PT’s and auxiliary transformer.
 ü Â
 ü Opern closed timing of Disconnector switch.
 ü Contact resistance of Disconnector switch.
 ü Contact resistance of circuit breaker.
 ü Gas pressure of SF6 gas in Circuit breaker.
 ü Moisture test of SF6 Gas in circuit breaker.
 ü TTR test of 160 MVA transformer.
 ü C&DF test of Transformer.
 ü  DES test of transformer Oil.
Field engineer Mobiserve (August 2005—May-2006):
Â
 ü        Worked as a field engineer/Power engineer for the Overhauling of 102 Diesel Generator at Lower Dir and sawat valley.
 June 2006 to December 2012– Mobilink Gsm Pakistan (Multinational Company);
AS A Field Engineer Based in Chitral:
Â
 ü Responsible for overall company assets, Supervising new site construction , logistics, troubleshooting and rectification and technical support.
 ü Responsible for implementation Engineering drawing civil, mechanical and electrical and coordination with planning team in cause of technical problem related to drawing.
 ü Installation and commissioning of Power cube (Huawei),Delta, Emerson/Power one and Eltek Rectifier and controller
 ü Boost up parameters /BLVD/LLVD configuration for standalone power ups systems.
 ü O&M and configuration of ATS and IPS.
 ü ATS /IPS timing setting.
 ü Ensuring of successfully shifting of power from CP to GP and UPS.
 ü Ensuring 100% power KPI.
 ü Co-coordinating with different departments for timely accomplishment of tasks related to power
 ü Installation, operation and maintenance of transmission equipment’s. NEC, Huawei etc. Troubleshooting of faults and rectification of alarms for smooth operation.
 ü Installation, Operation and maintenance of V-sat indoor and outdoor units.
 ü Installation of ATS and its Maintenance.
 ü Installation of Distribution Panels and its maintenance.
 ü Installation of grounding PITS/Mesh and its check. Checking of proper grounding of equipment’s.
 ü Installation of Low voltage consumer transformer 200,250,50,25,15 KVA on site and its operation and maintenance.
 ü Troubleshooting of transformers of low voltage.
 ü To check and make system redundant on commercial power and Generator power without interrupting smooth availability of power to the Building/equipment’s.Â
 ü Ensuring protection of equipment’s by inspecting Surge arrestors, Lightning arrester and grounding inspection.
 ü Best team management and equipped team with hazards protective tools and meeting with teams regarding Safety procedures and implementation on field/job
AS A Team LEAD (2012 -2016 Mobilink Pakistan):
Â
As a team lead my responsibilities were First POC from technical Operation Regarding Customer complain forwarded by customer care center Peshawar, Health Check of Data Center Power equipment’s ,commercial Power, UPS, Battery Banks, Environmental issues of data center, Supervision of construction for new roll out sites, Operation and Maintenance of Diesel Generators(500 KVA,800 KVA).Lead company Diesel Generator overhauling project for 900 cell sites with different contractors. Lead process of KPI reconciliation on Behalf of Mobilink with Huawei /ZTE for assigned KPI’s.
   ü Looking after complete Data center Health Check.
   ü Supervision & Acceptance of New Roll out site from Construction phase to Final Operation including installation of Electrical & environmental equipment’s.
   ü Rectification of Environmental issues.
   ü Installation of Rectifier (Delta, Emerson, eltek 48 V DC).
   ü Installation of UPS (MGE, Power ware, Delta, Power cube)
   ü Testing of Power redundancy and Auto Operation.
   ü Installation and testing of Battery Bank, Health check of battery Banks, setting of UPS, Rectifiers.
   ü Installation of Firefighting equipment’s (CO2,control unit along with calibration)
   ü Health check of Rectifiers unit, PM  & CM of Rectifiers ATS, Dual ATS, DP.
   ü Testing of resistance, impedance, continuity and grounding of equipment’s along Preventive maintenance.
   ü Calibration of Transformer (distribution transformer of 250 KVA, 150 KVA) ,stepping and testing of transformer.
   ü Cleaning, Greasing and Blowering of rotating and static part effectively.
   ü Charging and discharging of Battery Banks, Battery testing via hydrometer, setting of Boost charge and float charge mode.
   ü Testing of UPS function and rectification of Alarms.
Replacement of faulty batteries and rectification