Easy going by nature and able to get along with both work colleagues and senior managers, currently looking for a suitable Civil engineer position
I am a civil engineer working at Lahore DHA Phase 11 Project. I have completed 3 homes residential until now.
my responsibilities at the site as a site engineer manage all the site.
1. bedding of contracts
2. Estimation of project
3. Aale purchasing of materials
4. The hiring of staff for projects.
It was a very easy to project for me .i was face very difficulties during construction but the help of God and with prayers of my parents, I have completed all.
a project has with basement its big home at the society.
total estimation of all homes has 10 crores.
we have used number 1 construction materials.
process of construction
layout excavation of foundations.
use water stopper at the base joint in R.C.C wall.
use bitchumen for waterproofing of R.C.C wall.
use steel 60 grade.
the ratio of concrete (1:2:4) in RCC slab.
use ratio of plater 1:4
use 60 grade steel in columns.
project of Engieers town lahore
I am a civil engineer working at Lahore DHA Phase 11 Project. I have completed 3 homes residential until now.
my responsibilities at the site as a site engineer manage all the site.
1. bedding of contracts
2. Estimation of project
3. Aale purchasing of materials
4. The hiring of staff for projects.
It was a very easy to project for me .i was face very difficulties during construction but the help of God and with prayers of my parents, I have completed all.
a project has with basement its big home at the society.
total estimation of all homes has 10 crores.
we have used number 1 construction materials.
process of construction
layout excavation of foundations.
use water stopper at the base joint in R.C.C wall.
use bitchumen for waterproofing of R.C.C wall.
use steel 60 grade.
the ratio of concrete (1:2:4) in RCC slab.
use ratio of plater 1:4
use 60-grade steel in columns.
It was a very easy to project for me .i was face very difficulties during construction but the help of God and with prayers of my p
HABIB CONSTRUCTION SERVICES, Lahore
Site Supervisor at LAHORE ORANGE LINE METRO TRAIN (Package I)
10-01-2016 to 20-12-2016
-Analyze & review the structures, design plans and drawings.
-Perform site inspection.
-Coordinate with construction team.
-Ensure task completion within scheduled time.
I am professional in AutoCAD field.
I knew about structural drawings. I can execute all types of the structure according to drawings.
I am experts in 2d/3d in AutoCAD.
I can make models in 3d at Google SketchUp.
I have a diploma of the special training center of Pakistan.
Drafted detailed construction drawings, site surveying that involved taking measurements to create floor plans, creating building elevations and cross-sections, assessing fit and finishes for contractors bid packages.
Reviewed rough sketches, red mark drawings, specifications, and other engineering data received from architects or designers.
Took plans to Labor & Industry for preliminary and/or final review.
Performed other duties as described under drafter. Interacting with clients, delivering drawings and helping answering phones.
Technipower is nationwide company skillfully staffing a diverse group of individuals as desired.
Drafted 3D models using AutoCAD (2007).
Utilization of external reference to modify Architectural Floor Plans via red lining/markups.
Completed Architectural Drafting, Mechanical Drafting, & Electrical Drafting techniques.
Reviewed schematics and blueprints, for industry standard practices.
Worked closely with lead Architects, Engineers, and Contractors on various Commercial and Residential projects
Met on a regular basis with clients as needed
Collected background information and documentation including "as-built" data, as necessary
Coordinated with Architectural and Engineering staff regarding building design and development
Maintained up-to-date knowledge of Florida Building Code and International Building Code
Worked closely with lead Architects, Engineers, and Contractors on various Commercial and Residential projects
Met on a regular basis with clients as needed
Collected background information and documentation including "as-built" data, as necessary
Coordinated with Architectural and Engineering staff regarding building design