Electrical Engineering graduate with 1.7 year experience in UAE as MEP Engineer and 4 years of experience in Pakistan in the same field, I am performance driven professional in MEP & Civil projects execution, I have experience in designing AutoCAD drawings, Load schedules, single line diagrams, installation of electrical, low current, BMS, plumbing, and HVAC systems at construction sites.
· Making work shedule on daily basis,man power handling and supposing day today site operation.
· Responsible for installation of conduits for electrical systems during slab as per approved shop drawings.
· Responsible for schematics wirings for electrical and low current
systems(lig
· hting,power,Etisalat,CCTV,publicadressed,access control and BMS).
· Installation of LV panels (DBS,SMDBS,MDB,MCC panels,Ats panel,capacitor bank etc).And termination of cables asperapproved load schedule and single line diagram.
· Installation of cable tray, cable ladder and cable tanking.
· Installation and testing of lighting protection system and earthing system.
· Installation, testingand commissioning of diesel gensets.
· Installation of HAVC system (chiller,FAHU,AHU,FCU) split and package units.
· Installation of plumbing system(water supply,drainage,sanitary,GRP tanks,water filter system).
· Well aware of fire alarm and fire fighting systems.
· Planning and scheduling of MEP work programs conduit regular inspection’s and services mechanical,Elecrical and HVAC system and its equipment at site and make
necessary adjustments it require.
· Review all assigned projects electrical/HAVC and plumber installation shop drawings for compliance with all company and projects instruction (Electrical
· drawings,equipments location drawings, schematics wiring etc)
· Carry out the inspection on completed of work with MEP coordinator and consultant.
· To attends site coordination meetings with the sub-contractor and affort tradesof works.
· To attends site meetings concerning the progress of work
· Prepares Technical material, technical queries, samples & drawing submittals for consultant’s approval.
· Preparing as build drawings.
· Responsible for material quantity calculations, material requests and handling material at site.
· Able to work within PM Schedule from week to week and preparing work progress reports daily, weekly, monthly.
· Coordinating for ongoing projects with engineers, site team and sub-contractors for all kind of documentation to ensure the smooth execution of work.
· Making work shedule on daily basis,man power handling and supposing day today site operation.
· Responsible for installation of conduits for electrical systems during slab as per approved shop drawings.
· Responsible for schematics wirings for electrical and low current
systems(lig
· hting,power,Etisalat,CCTV,publicadressed,access control and BMS).
· Installation of LV panels (DBS,SMDBS,MDB,MCC panels,Ats panel,capacitor bank etc).And termination of cables asperapproved load schedule and single line diagram.
· Installation of cable tray, cable ladder and cable tanking.
· Installation and testing of lighting protection system and earthing system.
· Installation, testingand commissioning of diesel gensets.
· Installation of HAVC system (chiller,FAHU,AHU,FCU) split and package units.
· Installation of plumbing system(water supply,drainage,sanitary,GRP tanks,water filter system).
· Well aware of fire alarm and fire fighting systems.
· Planning and scheduling of MEP work programs conduit regular inspection’s and services mechanical,Elecrical and HVAC system and its equipment at site and make
necessary adjustments it require.
· Review all assigned projects electrical/HAVC and plumber installation shop drawings for compliance with all company and projects instruction (Electrical
· drawings,equipments location drawings, schematics wiring etc)
· Carry out the inspection on completed of work with MEP coordinator and consultant.
· To attends site coordination meetings with the sub-contractor and affort tradesof works.
· To attends site meetings concerning the progress of work
· Prepares Technical material, technical queries, samples & drawing submittals for consultant’s approval.
· Preparing as build drawings.
· Responsible for material quantity calculations, material requests and handling material at site.
· Able to work within PM Schedule from week to week and preparing work progress reports daily, weekly, monthly.
· Coordinating for ongoing projects with engineers, site team and sub-contractors for all kind of documentation to ensure the smooth execution of work.
· Making work shedule on daily basis,man power handling and supposing day today site operation.
· Responsible for installation of conduits for electrical systems during slab as per approved shop drawings.
· Responsible for schematics wirings for electrical and low current
systems(lig
· hting,power,Etisalat,CCTV,publicadressed,access control and BMS).
· Installation of LV panels (DBS,SMDBS,MDB,MCC panels,Ats panel,capacitor bank etc).And termination of cables asperapproved load schedule and single line diagram.
· Installation of cable tray, cable ladder and cable tanking.
· Installation and testing of lighting protection system and earthing system.
· Installation, testingand commissioning of diesel gensets.
· Installation of HAVC system (chiller,FAHU,AHU,FCU) split and package units.
· Installation of plumbing system(water supply,drainage,sanitary,GRP tanks,water filter system).
· Well aware of fire alarm and fire fighting systems.
· Planning and scheduling of MEP work programs conduit regular inspection’s and services mechanical,Elecrical and HVAC system and its equipment at site and make
necessary adjustments it require.
· Review all assigned projects electrical/HAVC and plumber installation shop drawings for compliance with all company and projects instruction (Electrical
· drawings,equipments location drawings, schematics wiring etc)
· Carry out the inspection on completed of work with MEP coordinator and consultant.
· To attends site coordination meetings with the sub-contractor and affort tradesof works.
· To attends site meetings concerning the progress of work
· Prepares Technical material, technical queries, samples & drawing submittals for consultant’s approval.
· Preparing as build drawings.
· Responsible for material quantity calculations, material requests and handling material at site.
· Able to work within PM Schedule from week to week and preparing work progress reports daily, weekly, monthly.
· Coordinating for ongoing projects with engineers, site team and sub-contractors for all kind of documentation to ensure the smooth execution of work.
MEP,CIVIL
Key responsibilities.
· Making work shedule on daily basis,man power handling and supposing day today site operation.
· Responsible for installation of conduits for electrical systems during slab as per approved shop drawings.
· Responsible for schematics wirings for electrical and low current
systems.