As an engineer having a diverse experience of more than three years in maintenance and utility department of textile industry. Having good exsposure of plant engineering, management and projects execution.
Execution and monitoring of electrical work on site including electrical diagrams, single line diagram and schematic diagram.
Develop and implement maintenance schedule for manufacturing and service equipment.
Troubleshooting, fault diagnosing and working on root cause of machine breakdown.
Manage the inventory of all local and imported parts of machine.
Preventive, breakdown and annual maintenance.
Calibrate the instruments according to standards.
To assist manager for preparation of project cost, execution and work-time estimates.
Parameterize inverter and troubleshooting of PLC and communication to peripherals Maintain machine complains record on ERP system.
Audit And Compliance work.
• Assists Machine Erection and commissioning.
• Erection of STENTEX Stenter Machine.
• Automation of Manual Operated STENTEX Stenter Machine with the help of Siemens PLC (S7-300).
• Parameterization and PLC Programming in Sematic Step 7 Professional 2006 SR6 and Design HMI in Sematic Wincc Flexible 2008 SP2.
• Operating Burner through (Ignition transformer, Solenoid value, flaming rod, spark plug, pressure switches, thermostat, RTD, modulating motor, damper,
• Working these thing through Inverter (Padder, Entry Rolls, Over Feed, Left Shrink & Right Shrink, Tenter Chain, Exit Roll and Platter).
I do Internship in Pakistan International Airlines (PIA) in HR Training and Automation Office in Engineering department.I visit different shop in PIA like Battery ,Radio,Instrument and Base.I also visit in Boeing 777 airplane and see the cockpit. I learn many things from there.