An enthusiasm Executive who seeking for an opportunity to work with an organization that will provide a platform to utilize technical and managerial skills to help in the process of organizational and self-growth
Responsible of planning meeting/workshops to roll-out the agreed work breakdown structures and working methods to the various planning contributors.
Responsible for the preventative maintenance plan and implementation for power house, air compressors, chiller, production and manufacturing machines including mixers, tube filling machines, Bottle filling machines, Sachet Filling machines, conveyors, packaging machines.
Responsible for the troubleshooting of temperature controllers, servo & stepper drives, motors, VFDs, proximity sensors, mark sensors,PLC & HMI.
Designed and implemented aerosol plant project as per electrical standards, make sure all work done as per approved power schematic drawing and electrical layouts.
Designed fire alarm system and CBC System as per project site.
Ensure that any necessary project site planning interface with the site Work Management Process (WMP) is established.
Prepare weekly plan for training of shift engineers, supervisors and task allocation according to the production plan.
Designed electrical protection system.
Responsible for the record of breakdown analysis, why why analysis, LOTO, PTW and LTI reports.
Ensure that all inspections, installation and testing commissioning of MEP equipment meets the project specification, consultant and client requirement.
Supervising installation of power distribution system, BMS, fire alarm system, lighting control system, emergency and exit lights system, Public address, CCTV, SMATV and Telephone system) .
Supervising installation of SIMPLEX fire alarm system (including smoke detectors with sounder base and continuity base, void smoke detector, control module, monitor module, flasher, breaker glass and fire alarm panel)
Overseeing building automation (including integration of fire alarm system with FAHU,EF, Package units, motorized fire damper, lighting control system, emergency and exit light system)
Responsible for taking approval of fire alarm system from abu dhabi civil defense authority
Responsible for taking approval from consultant for material submittal, testing & commissioning for all electrical services (LV panels, Capacitor banks, ATS system, and generator installation)
Responsible for inspected site work on daily basis progress
Responsible for Distribution of Power according to load schedule for electrical equipment, HVAC system (FCUs, FAHU, RAHU, motorized damper), chillers and related.
Following up for material required on site and arranged accordingly from suppliers
Processed vendor quotes and created accordingly documentation to proceed purchase order issuance and follow up for LPO with procurement on daily basis.
Responsible for submit daily site reports, inspection requests, estimates and all applicable monitoring reports.
Responsible for follow up the electrical drawings as per the site
Provided experimental findings for progress reports
Meeting with senior health service staff or managers to exchange findings
Supervised electrical department (testing and installation of SMDB, DBs, ATS, PFI panel)
Designed electrical network as per requirements and standard loads of the channel
Resolved all technical obligations associated with installation
Supervised electrical department responsible for cabling and DB’s installation
Maintained all safety and quality control project standards
Supervised electrical and mechanical grounding system associated with the installation
• Worked with Senior Engineers to enhance knowledge in practical field
• Worked with Assistant Manager to enhance knowledge in Engineering Entrepreneurship
• Understand the construction of power transformer and distribution transformer
• Worked on testing of transformer
• Understand the construction of instruments transformers
• Understand the construction of energy meters including single phase meter and three phase meter
• Understand the construction of HT, MV and LV switchgear panels
• Understand the construction of PFI panel (Power factor improvement plant)
• Worked with Senior Engineers to enhance knowledge in practical field
• Worked with Assistant Manager to enhance knowledge in Engineering Entrepreneurship
• Understand the construction of power transformer and distribution transformer
• Worked on testing of transformer
• Understand the construction of instruments transformers
• Understand the construction of energy meters including single phase meter and three phase meter
• Understand the construction of HT, MV and LV switchgear panels
• Understand the construction of PFI panel (Power factor improvement plant)