15+ years of experience organized electrical professional with a background in project management as well as strong technical skills in electrical engineering. Primarily focused on the implementation of international standards and codes system. Seeking to leverage my knowledge of and expertise in industrial control, power management, and power distribution to help the company to maximize productivity and quality of electrical operations.
• Generating daily reports for running projects and routine work
• Preparing daily reports for electricity, steam, natural gas, and water consumption
• Monitoring & maintaining SCADA base energy metering system
• Commissioning and repairing of fire alarm system
• Installation and operation of energy efficiency equipment
• Performing electrical inspection audits for MV, LV panels, transformers and motors
• Creating audit reports for electrical inspection, energy analysis, thermography analysis and root cause analysis reports
• Hands on experience with different device used for thermography, electrical energy analyzer and compressed air leakage
• Conducting internal resources audits for energy conservation (electricity, steam, water and gas)
• Implementation of lean management in all process
• Implementation of international codes for the safe usage of equipment with NFPA 70, 70E and OSHA
• Assist compliance and other department to assure the HSE rules implementation
• Led company-wide energy awareness campaign by editing monthly energy awareness editorials
• Offered on-site energy conservation instruction and reduced 70% seepages of energy sources
• Led various lighting retrofit projects and save energy costs by 40%
• Installed heat recovery boilers and achieved coal consumption saving by 15%
• Developed KPI for better energy conservation
• Managed teams during projects and handled material availability at the site
• Furnished projects estimated cost, BOQ, and reviewed RFQ
• Direct and co-ordinate all MEP installations, servicing, repair and maintenance
• Accountable for resolving different technical issues at the design stage
• Planning and execution on the electrical side for MEP projects
• Accountable for resolving different technical issues at the design stage
• Commissioned and installed control shed for heifer and bull calf and decline death ratio by 60%
• Installed and designed jute sheet with water sprinkler method to reduce temperature and increase milk capacity up to 15%
• Installed WAPDA 11 KV connection for 630 KVA Transformer
• Installed 11 KV metering and protection panels, ATS, PF 630 KVAR, and control panels
• Installed and replaced all diesel Genset with the gas engine and saved energy cost by 30%
• Maintain knowledge of electrical materials in warehouse
• Check and reviewed all documents related drawing and installation
• Assist manpower/technicians on their day-to- day activities
• Perform preventive and corrective maintenance according to schedule
• Prepare documents such as load management and electric calculations
• Installed VFD at large capacity motors and saved energy consumption by 40%
• Design panel for motor control center and decrease motor burning by 80%
• Erection of power & control panel supplies for DCS, MCC & PCC
• Complete erection of 14.5 MW & 19 MV (11KV) generators of Siemens
• Maintain records on electrical jobs and assign to appropriate personnel
• Supervise subordinates for maintenance, installation, modification, and repair of electrical assignments
• Plan and schedule projects, estimate time and materials
• Diagnose malfunctioning systems and locate the cause of a breakdown and correct the problem
• Installed solar system base lighting sources for street lights and saved energy consumption by 70%