• Focusing on the interconnection study of power plants (Solar, Wind, Hydro, Thermal, Nuclear) and evaluation of T&D losses
• Technical & Analytical Skills: Load flow, short circuit, stability and power quality analysis of a number of power plants of diverse nature (renewables and conventional) using PSS/E.
• Technical proposal writing.
• Technical Report writing.
Successfully completed the following projects:
• Grid Syetm Impact Study of 330 MW Siddiqsons Thar Coal Power Project, Tharkot
• Interconnection Study and Power Quality analysis of 50 MW Siddiqsons Solar, Kohat
• Interconnection Study of SAR 1.72 MW Hydro Power
• Interconnection Study of 1223 MW Combined Cycle Power, Balloki
• Interconnection Study of 1230 MW Combined Cycle Power, Haveli
• Interconnection Study of 545 MW Hydro Power Plant, Kaigah, Kohistan
• Interconnection Study of Ghanool 2.4 MW Hydro Power
• Interconnection study and Power quality analysis of 50 MW Siddiqsons Nowshera Solar
• Plant expansion and interconnection study of 200 MW Fauji Kabirwala
Reviewed following project :
• Interconnection study of 2.6 MW Machai Hydro Power Plant
6 weeks internship experience with 3 weeks at Wapda Town 220KV grid station where I learnt about the working of Power components like CTs, PTs, Transformers, Relays etc and 3 weeks at WAPDA House in Planning and Protection department learning about protection schemes and software like PSS®E and Power Word Simulator (PWS)
4 weeks internship program covering all the sections related to Transformer like construction, working, testing etc which gave me a deep insight to the production line and maintenance department