Following is the summary of different sectorsI have beeninvolved :
○ BeveragesIndustry ○IndustrialServices
○ FoodIndustry○CommunicationTechnology
○ ConstructionIndustry ○ ChemicalsIndustry
○ HospitalityIndustry
System Limited
• Responsible of maintaining inventory record
• Responsible for monthly Electricity bill calculation
• Responsible of maintain daily check list
• Responsible of all electrical equipment smooth operation (HVAC,Transformer, HT/LT panels, Diesel Generators, and Industrial UPS)
• Responsible of procurement of required equipment’s and materials
• Maintain diesel consumption report
• Estimation material, labour or construction cost for budget preparation
• Responsible for calculation of Electrical Load.
• Responsible of BOQ
• Design Distribution panels
• Prepare Design of PFI, ATS, AMF, MOR, PR, ASD, MCC,PCC, PDB,Auto Load Sharing Synchronizing Control Systems.
• Prepare Design of PFI,ATS, AMF, MOR,PR,ASD,MCC,PCC,PDB, Auto Load Sharing Synchronizing
Control Systems.
• Preparation of Single Line Diagrams (SLDs) Of HT and LT Switch Gear Systems.
• Prepare Design of MV Metering , Protection, Synchronization , BUS Coupler Panels.
• Design Calculations such as Fault level calculations, Voltage drop and cable sizing
calculation, Earthing and lightning protection calculations.
• Design the cable supporting & routing methods using plan and sectional drawings.
• Prepare Design of LT Metering , Protection, Synchronization , BUS Coupler Panels.
2) Bilal Switch Gear Engineering (Pvt) Ltd QC Engineer(February 2016 to Dec present)
ROLES AND RESPONSIBILITIES
Knowledge and application of DeeSys , Schnieder , GE MIF II Relay.
Operation of Entes , Autonics Relays, Timers, CT’s, PT’s.
Performance Of SAT and FAT.
Preparation of Project Final Reports.
Operation and Maintenance Of Faulty Equipment like ACB,VCB Protection Relays.
Preparation of Test Reports and Evaluating Site Activities.