I bring along close to 3 year of career as Web Developer, 2 years career as Mechanical Engineer and 5 years of career as Business Development Manager while significantly contributing in enhancement of the capacity & productivity of the organization, with an excellent set of leadership skills and commitment and innate passion for Web Development with an inquisitive, working hard nature. I am a Graduate of PEC (Pakistan Engineering Council) and HEC (Higher Education Commision) accredited BSME and MBA Program and have taken courses in HTML, CSS, PHP, CodeIgniter seeking a Web Development , Mechanical Engineering or Business Management Position.
I��j�az�az�G:j��V�r���)�,ğ���r(����x(�W��x���yׯzZ)���
Studied the basic concepts of PHP, MySQL, Code Igniter and XAMPP to start working on ETTM App.
Studied the already developed ETTM Web Application based on CodeIgniter on Local Area Network and resolved the bugs encountered.
Developed Daily Site Report (DSR) Module on front end for toll plaza crew and back end for admin headquarter crew
Developed Daily Traffic Report (DTR) Module on front end and back end using the MTR concept.
Currently Developing Dashboard Charts Module for front end
Maintenance of already developed Modules on regular basis and solve the issues faced by Toll Plaza crew regarding ETTM Web App.
Migrating the CodeIgniter Project on Laravel
Identified new sale leads for growth of company
Pitched the company to sell IT products.
Negotiated quotes for the IT based products to make a name for company.
• Create and hand out schedules for construction staff working in the field and perform field quality control observations and assessments.
• Inspect and assess the quality of materials being used for construction projects and calculate the quantity of material, supplies and equipment needed for each individual project.
• Verify and approve invoices of purchases and oversee the work of field staff to ensure efficacy of work procedures.
• Ensure compliance to project specifications and make sure that all construction activities are being carried out in accordance to preset safety rules.
• Ensure availability of resources and materials at all times.
• Provide recommendations for repair work and make sure that deadlines are compiled to.
• Perform continuous evaluation on trends and ensure that preventative maintenance is managed at each stage of the project.
• Survey maps and blueprints prior to creating construction plans and determine project feasibility and direct all resources to the site in a time efficient manner.
• Provide technical advice to field staff in order to ensure that construction procedures are being carried out properly.
• Identify construction constraints and plan and carry out measures to counter them.
• Prepare period reports and assessments for each project phase.
Earned a reputation as Quality Assurance Manager and provided technical consultations.
Directed and co-ordinated with technical staff to ensure workers compliance with welding done in Partition of Shrine and Arcade building and the Window Grills in the boundary wall of Arcade and shrine building.
Assisted technical staff in maintenance of HVAC systems, Lifts system
Applied technical skills and techniques in troubleshooting the defects.
Contributed in the research and development efforts to improve and update the systems with latest technology.
Completed Internship at Gohar Textile Mills, the manufacturer of textiles and fabric.
Assisted Accounts Department in preparing letters for receivables, bills for payables and costumers.
Learned the hierarchy in management, delivery and supply management in professional environment.
Compared GTM’s SWOT & TWOS Analysis with the other textile competitors and developed Ranking Sheets on how GTM is ranked in all of them.