To work with a reputed and professional organization, where I can get opportunities for career development and utilize my technical, analytical and problem-solving skills to achieve the organizationacircs goal and allow me to enhance my capabilities to the maximum.
• Carry out regular audits w.r.t Quality & HSE compliance of all workers in overall implementation operation activities.
• Creating, maintaining & overviewing all the SOPs of Nokia field force & operation Divisions & proposing improvements.
• Monitoring & analysis of all ongoing projects & providing feedback to planning & implementation teams for improvement
• Providing training to subcontractors, Suppliers partners & NOKIA project teams regarding the quality & HSE expectations as per Customer requirement.
• Creating, maintaining & overviewing all the SOPs of Telenor’s Infrastructure Deployment Division & proposing improvements.
• Monitoring & analysis of all ongoing projects & providing feedback to planning & implementation teams for improvement.
• Providing training to subcontractors, vendors & Telenor project teams regarding the quality & HSE expectations in Telenor projects
• Carry out regular audits w.r.t Quality & HSE compliance of all workers in overall supply chain.
• Was titled “Employee Engagement Champion” in recognition of my contributions in conducting team building activities in 2017
To ensure supervision of day to day activities of Power implementation projects and mitigation of daily challenges which arise during on site activities execution according to best industrial and quality standard.
• Implementation of Power devices (Rectifiers, Solar, Battery Banks, RMS, IPS, DGs) at Telenor sites of South regions.
• Solar energy implementation on BTS sites for fuel/energy cost reduction.
• RMS (Remote Monitoring System) implementation for analyzing operations excellence to monitor on site hardware status and fuel status remotely.
• To conduct visit at sharing sites for Planning & designing of efficient battery and rectifier systems which reduces generator fuel cost.
• Battery backup planning & rectifier/UPS requirements at RAN sites
• Load calculations of the site equipment.
• BTS Rollout 2014 activity execution in counter part of CW/Power.
• Follow up for timely deployment of Genset and IPS at newly TP built sites.
Successful completion of Telenor projects:
1. Generator less Operation Strategy Implementation/Fuel Reduction.
2. Remote Power Infrastructure Monitoring and Fuel Savings.
3. Regional Energy/OPEX Savings with network availability.
4. Solar (PVC) Energy Implementation.
5. 2Volt VRLA Battery Deployment 2000+ Sites.
6. GEM (Generator Manager) Installation on 2000+ Sites.
7. Deployment of 222 sites of PIU in S-I & S-II regions.
8. Energy Efficient Air Conditioners Deployment (Inverter Based).
9. 2G ZTE Rollout of Q1 & Q2-2014 in South region.
10. 3G Rollout of Phase-01 2014 in South Region.
• Responsible for the execution of Power & Environmental alarms project of BTS / BSC sites.
• BSS reports (Region wise Network outage & TCH availability)
• Using RC (Radio Commander) software tool to monitor the current Site status and also fully command on editing the tools.
• Improving Network KPIs and TCH Availability by minimizing network outages due to Power/ Hardware.
• Hand on experience on Net viewer Server for Siemens Sral and PNMSJ Server for NEC.
• Hardware Level, Quality Alarms & Segment Level Statistical Analysis of BSS Issues.
• Teams mobilization, Office Management and Coordination with the Costumer for power related Issues).
• Conduct Preventive/Corrective Audits and highlight area for improvement.
• Provide 24 hours support to level I engineers for resolution of any major Issue.
• Resolve Site fluctuation and Media fluctuations.
• Conduct Quality HSE/QMS Audit and reporting to customer.