概要

A young, bold, and energetic value-added mechatronics engineer having more than 9 year experience in field of HVAC and Utilities equipment’s/System of a pharmaceutical industries.
Installation, commissioning, maintenance & upgradation of HVAC equipment, air compressor, boiler, water treatment plant (RO& EDI), fork lifters, Cold Room, Fire Alarm System, Fire Hydrant System, BMS System, Transformers and Generators.
A real challenge accepted personality who provide his energies for timelessly.

项目

Design and manufacturing of prosthetic hand using sEMG signals
Design and control of prosthetic hand using sEMG signals

工作经历

公司标识
Assistant Manager Engineering
Herbion Pakistan (Pvt) Limited
Jul 2019 - 代表 | Islamabad, Pakistan

Following are my Responsibility
1. Persoanl Care Project
2. Project Work (Up-gradation of Herbion Islamabad Plant)
3. Utilities work/Maintenance Work
4. Operations (Production Related Activities)
5. Engineering Related documentation work
6. SAP working
7. Working from Outsource vendor’s
1. Personal Care Project:
 On time completion of personal care project with all respect.
2. Project work(Upgradation of ISB Plant):
Islamabad Plant have been designed and deveopled as per GMP requriement by adding the following.
 Installation & commissioning of HVAC System Air handling units (AHU-Coolmax-016-2019), Exhaust air fans (EAFSASA-25-2019), Vantelation Air Fan (VAF-SASA-3-2019), Cooling Coil Units (CCU-Coolmax-05-2019), Dust Collectors (DC-02-
2019), YORK air cooled screw chillers (YVAA-02-2019-300TR),Dehumidifier (Munter-05-2019),Heat Exchanger.
 Installation & commissioning of LT panels (ZELON-02-2019-1000KW), MCC (Machine Control Circuit) panels for
HVAC system (ZELON-MCC-03-2019-1000KW), PFI panels (ZELON-02-2019-600KVAR), Transformer (PEL-01-2019-
1000KVA)
 Installation & Commissioning of Addressable Fire System (FR-Johnscontrol-2020) for production and beam sensor
for main warehouse (FR-Johnscontrol-2022).
 Installation & Commissioning of Building Managmenet System (BMS system) for HVAC System.
3. Utilities work/Maintenance work
 Installation & commissioning of Atlas Copco Air Compressor 37 KW with Desiccant Air Dryer (Atlas Copco-ID
GA 37-37KW) with Proper Validation (i.e. IQ,OQ,PQ and Compressed Air Quality Testing).
 Maintenance of Class C Boiler(EAGLE-ID 54-1.25 TN), Air Compressor (DH-22-2.9 Cubic mtr/m),FBD Panel (FBD-Glatt120Kg), CARGO lift (3000 Kg) and Water Treatment Plant (Replacement of membrane).
4. Operations (Production Related Activities)
Addition of following machinery in production to enhance capacity with Proper Validation (IQ,OQ,PQ).
 Installation and Commissioning of automatic liquid filling machine (JINGLONG-12H-2019), Automatic Capsule
filling machine (Dr Pharm-NJP1200-2019), Automatic Sachet Filling machine (DCK 300 -2022), Double Cone Blender.
5. Engineering Related documentation work
 Updates in drawings for quality, PICs DRAP & other requirements.
 Preparation of SOPs for new system and maintain its logbooks accordingly.
 To maintain work order file so that to maintained machine parts inventory.
Gohar Irfan (Mechatronic Engineer) Page 2
 To ensure the preventive maintenance of production machines & utilities equipment as per planed
frequency to minimize break down
 Maintain AHUs filter cleaning record to provide cleaned air to production (as per area filtration) .
 Maintain utilities operation Performa/record to compare with electrical bill costing.
 Maintain generator operation record to provide bulk amount of diesels for boiler and generator so that to
prevent from any difficult situation.
6. SAP working
 Generating PRQ,ARQ,SRQ,AR in SAP as per requirement on daily basis. (machinery critical parts and
general consumable).
 Issuance on daily basis include general consumable, High Speed Diesel e.t.c.
7. Working from Outsource Vendor’s
 Working from outsource vendor on daily basis i.e. civil work, building maintenance, electrical working,
HVAC, Water treatment Plant e.t.c

公司标识
Site Engineer
Pakistan Elevator Engineer
Jul 2017 - Jun 2019 | Islamabad, Pakistan

I perform my job responsibility as a site engineer in pakistan elevator engineers(PAKLIFTS).
Being a site engineer my responsibility was totally concern with a whole project contain Mechanical Structure,Control system, Civil work.
In Mechanical structure i assemble most of mechanical parts include Guide rails(12 mm), Counter weight(36"*92"), Roping(4/5), Cabin Assembly(Sample/3D), Shock absorber and all the other major responsibility.
In control system i was totally concern with 100 % of control system in which i have starting from Control panel to digit display.
Some of the major parts are nominated below
Control panel installation and connectinon
COP installation and connection
LOP installation and connection
Junction Box
Light Sensors/Door sensors
Read switch
Limited switch
Magnate
Floor level
7 segments display
Door Drive Connection
Machine room
E.T.C

公司标识
Engineering Officer
Medisave Pharmaceuticals
Feb 2016 - Jun 2017 | Lahore, Pakistan

Work in the field of Electrical, Mechanical and HVAC engineering.

学历

University Of Wah, Wah Engineering college wah cantt
学士, 技术学士, Mechatronics Enginnering‎
Applied Mechanics and Design, Electric Power and Control System, Robotics
CGPA 2.9/4
2015
Wisdom science college chowkara karak
中级/A级, 理学院(工程预科), Pre-Engineering‎
Pure Mathematics, physics
所占比重 72%
2011
Hera high school ahmad abad karak
大学入学/0级, 科学, Martriculation‎
Mathes, physics, chemestry
所占比重 76%
2009

技能

熟练 Fine Art Teaching
中级 GUI Framework
熟练 Handling Assignments
中级 MATLAB Command
初学者 PLC
初学者 PLC Ladder Logic
中级 Pro-E
中级 Solid work

语言

中级 Saraiki
熟练 旁遮普语
熟练 普什图语
熟练 英语
熟练 乌尔都语