Senior Planning & Scheduling Officer with 05 years experience in the field of planning & project controls in EPC /Oil&Gas /Refinery.I have lead many projects as Project Coordinator and Project Planner for the clients in different sectors. Proficient in Planning/Scheduling, Daily/weekly/monthly & other reports, Feasibility, construction & cost analysis, presentations and...
1:-Creation of shutdown & construction plans (in Primavera) in conjunction with discipline engineers.
2:-Manage and control contract resources in order to facilitate the engineering construction plans. E.g. scaffolding, hire equipment, cranes etc.
3:-Planning of Jobs in Maximo by reviewing daily Maintenance schedules and verify that the work orders are scheduled according to their priorities and resources availability
4:-Hands on experience on all CMMS-Module
5:-Develop and manage relationships with key service providers including equipment overhaul/refurbishment and management of quality critical hold points.
6:-Ensure the completion of appropriately detailed plans and costs for a monthly and weekly look ahead.
7:-Understand and able to utilize planning tools such as MS excel, Access, MS Project, Primavera.
8:-monitor and forecast progress of all activities and deliverable such as products, engineering documents , fabrication status of construction.
9:-Monitor, manage and review defined KPI at business review meetings of working plant.
10:-Monitoring of contracts and critical activities procedures with construction team and Hold regular discussion and meetings with the supervision staff.
11:-Preparation of Weekly, Monthly progress actual quantities comparison with planned values to ensure the proper implementation of the work plan.
12:-Analyzing the differences between the quantities planned and the total quantities from the items input.
13:-Monitoring progress against the Plan (S-curve) at various levels on weekly and monthly basis
Monitor the reporting system with partner companies and sub-contractors.
14:-Heading the weekly planning coordination meeting with construction and sub-contractors.
To update the punch list clearance.
1:-Create Project plan using Primavera p6 as per VDR lists
3:-Consolidate Material as per Drawings (mechanical, piping etc.)
4:-Generate the material Codes by using SMART
5:-Material Ordering By Using SAP
6:-Managing project budgets and implementing cost-saving actions.
Keeping costs down
7:-Budget Transaction, and analyses by SAP
8:-Issuance the material as per drawing
9:-Resolve the Drawings Problems By design Mutual Discussion
10:-Prepare the welding inspection plan as per Drawing
11:- Total piping Dia inches of project.
12:- Verification of as built drawings
13:-Production progress monitoring
14:- Interaction with engineer to resolve various issues related to Drawings or Production aspects
15:-Logistic (Loading, dispatch and unloading) the raw material and final job
16:-To handle procurement activities of engineering and non-engineering items with respect to quality requirements.
17:-Project progress monitoring and prepare the status
18:-06 month Commissioning,experience of instruments at gadoon site
19:-Insulation work done as per Design Requirement.
20:-Prepare the Boilers For Steam Blowing.
i also supervise at Gadoon power plant 2.6Mv