工作经历

公司标识
Sr. Officer Electrical
Volka Food International (pvt) Ltd
May 2017 - 代表 | Multan, Pakistan

 Operation & Maintenance of

 Erection, Commissioning and Operation of (2* ENGINES) Wartsila (18V32/ 16V32) FURNACE OIL ENGINES.
 Erection, Commissioning and Operation of (1* 3.1MW.) Wartsila (9RL) FURNACE OIL ENGINES.
 Erection & Commissioning of PROJECT OF 11KV Synchronizing WITH WAPDA.
 Erection & Commissioning of Two STEP UP 6KV/11KV Transformers of 5000KVA each
Job’s Responsibilities
 Ensuring Smooth and efficient operation of all general Services equipment’s as plant requirements.
 Commissioning of WARTSILA engine complete.
 Synchronization of WARTSILA engine with WAPDA.

公司标识
CONTROL ROOM OPERATOR
MASTER TEXTILE MILLS LTD (LAHORE)
Sep 2014 - Apr 2017 | Lahore, Pakistan

 Operation & Maintenance of

 Erection, Commissioning and Operation of (1* 6.5MW.) Wartsila (18V32E) FURNACE OIL ENGINES.
 Erection, Commissioning and Operation of (1* 4MW.) MAN (7L40/45) FURNACE OIL ENGINES.
 Erection, Commissioning and Operation of (3*2MW.) Jenbacher (Jenbacher JGS 616) GAS ENGINES
 Erection of Coal fire boiler of 20Ton
 Erection & Commissioning of PROJECT OF 11KV Synchronizing WITH WAPDA.
 Erection & Commissioning of Two STEP UP 6KV/11KV Transformers of 5000KVA each
 Operation and maintenance (4*1MW.) Caterpillar (3512) DIESEL ENGINES.
 Gas Turbine 2xTurbomach Centaur-50 4.2MW

Job’s Responsibilities
 Ensuring Smooth and efficient operation of all general Services equipment’s as plant requirements.
 Commissioning of MAN engine complete With OMRON PLC system.
 Commissioning of WARTSILA engine complete.
 Erection & Commissioning of JENBACHER Engine.
 Synchronization of MAN and WARTSILA engine with WAPDA.
 Erection of coal fire 20TON boiler with PLC control complete.
 Electrical maintenance work on coal fire, rice husk , gas and wood boilers
 Responsible for the maintenance of 11kv system and 6KV system.
 Preparation of routine preventive maintenance schedules off all critical equipment’s.
 Ensuring safe trouble shooting of the equipment’s.
 Saving of all kind of all energies i.e. Electricity, Compressed Air and |Water.
 Heat recovery boilers capacity of 2.5 tons / hour each.
 No Safety bypass of any equipment during operation & Maintenance.

公司标识
SHIFT INCHARGE
ZEESHAN ENERGY LTD JA TEXTILE MILLS (FAISALABAD)
Mar 2014 - Sep 2014 | Faisalabad, Pakistan

 Operation & Maintenance of

 (3*2.3MW.) NIIGATA (6L34HX) FURNACE OIL ENGINES.
 (4*1.5MW.) DUETZ (TBG620V16k) Gas Engines.
 (1*100kva.) John Deere(100kva)Diesel engine

Job’s Responsibilities
 Ensuring Smooth and efficient operation of all general Services equipment’s as plant requirements.
 Responsible for the maintenance of Auxiliaries panels and relay panel, generator panel.
 Responsible for the maintenance of 11kv system
 Preparation of routine preventive maintenance schedules off all critical equipment’s.
 Ensuring safe trouble shooting of the equipment’s.
 Saving of all kind of all energies i.e. Electricity, Compressed Air and |Water.
 Responsible for the clearance of the sensors.
 Whole Maintenance of Cooling Tower.
 Solve the problem in TEM panel of gas engine.
 No Safety bypass of any equipment during operation & Maintenance

公司标识
ELECTRICAL TECHNICIAN
DESCON ENGINEERING LIMITED 18-KM, FEROZPUR ROAD LAHORE. UCH -II POWER PROJECT DERA MURAD JAMALI PAKI
Jun 2013 - Feb 2014 | Dera Murad Jamali, Pakistan

 ERECTION COMMISSIONING AND OPERATION

 (2*132 MW.) GENERAL ELECRTIC GAS TURBINE.
 (1*142MW.) FAUJI STEAM TURBINE.


Job’s Responsibilities
 Installation of MV&LV panels at power plant and installation of 220 KV switchyard complete testing commissioning.
 MCC Power termination and DCS or 220 KV Switchyard control termination.
 Punch list work of whole plant and Inspection and maintains
 Meager and continuity test and other damaged parts replacement.
 Installation of whole plant M.V/L.V Panel, Control Panel, Local Control Panel.
 Erection of Lighting and earthing system work of whole plant.
 Step up Transformer control panel termination and Auxiliary unit of Transformer HT power cable termination and control termination.
 Cable tray and conduit installation, Cable Lying, MV/LV Cable jointing, Control and power cable termination.
 Pre-commissioning and commissioning of all electrical items.
 I can handle all Electrical activities regarding maintenance and erection with quality and safety

公司标识
CUSTOMER PREMISES EQUIPMENT INSTALLER
PAKISTAN TELECOMMUNICATION COMPANY MUMTAZABAD EXCHANGE MULTAN
Jun 2010 - Jun 2013 | Multan, Pakistan

Job’s Responsibilities
 Computer hardware and Software Installation and its all type of troubleshooting
 Hand on experience in all types of troubleshooting in PSTN and Broadband Network,
 Monitoring Status and to Provide Technical Assistance to Customers.
 Experience in Patch work of PSTN and Broadband connections at MDF, ONU and at MSAG.
 Installation and configuration of all types of ADSL2,Wi-Fi Modems, Access Points, Routers
 outdoor units and their troubleshooting.
 Experience in installation and troubleshooting of IPTV ,IPCAM and EVO Wireless Broadband
 Experience in operation of BnCC(Billing and Customer Care) terminal.
 Hand on Experience of using LQT Meter and Meager at exchange and at OSP.

公司标识
ELECTRICAL SUPERVISOR
GIBS SM FOOD MAKER UNIT II VOLKA FOOD BAHAWALPUR ROAD 2KM MULTAN.
Aug 2009 - Jun 2010 | Multan, Pakistan

Job’s Responsibilities
 Erection of giggly jelly plant .All installation of plant or termination power and control.
 Wiring work of all building volka food .installation of whole buildings light and termination.
 Termination and installation of all type single phase and three phase motor.
 Cable laying work as per drawing and power or control cable termination.
 Boundary wall fled light installation and termination.
 Cable tray installation works and cable dressing.
 Troubleshooting all type of electrical fault and maintenance.

公司标识
ELECTRICAL SUPERVISOR
HABIB RAFIQ PVT. PROJECT STOCK EXCHANGE TOWER BLUE AREA ISLAMABAD
May 2008 - Aug 2009 | Multan, Pakistan

Job’s Responsibilities
 Installation of cable tray and trunking system.
 Installation or termination of all type sealing light and fled light.
 Termination of all type socket power socket switches and boards and breaker.
 S.M.D.Bs and D.Bs installation or termination works.
 Meager and continuity test and commissioning all building wiring works.
 Wiring small power CCTV system and communication system.
 Fixing of lights, switches, sockets and other wiring accessories.
 All CCR work installs all type panel and control or power cable termination.
 Boundary wall fixing fled light and wiring or termination.

公司标识
ELECTRICAL TECHNICIAN
DESCON ENGINEERING LIMITED 18-KM, FEROZPUR ROAD LAHORE. CWE-JV MANGLA DAM PROJECT JEHLUM PAKISTAN.
Mar 2008 - May 2008 | Multan, Pakistan

Job’s Responsibilities
 Building wiring work and installation and termination light, switch, socket, breaker and all wiring accessories.
 Maintenance of clay plant, cries plant, batching plant and electrical troubleshooting of induction motor power and control work.
 Maintain lighting and repairing fled light at Dam of duration work in night.
 Three phase induction motor connection termination control panel termination work.

公司标识
ELECTRICAL TECHNICIAN
PAK GAS PVT LTD MULTAN MANUFACTURER OF CARBON DIOXIDE& DRY ICE
Sep 2007 - Mar 2008 | Multan, Pakistan

Job’s Responsibilities
 Maintenance of single phase motor and power or control work.
 Termination of motor connection and panel termination.
 Replace and install light, power socket, switches and wiring work.
 Motor control panel installation and repairing.
 All type electrical troubleshooting and clear fault.

学历

Oxford Institute of Technology Multan
大专, DAE‎
Electrical
Incomplete
2007
Govt High school Basti Malook
大学入学/0级, 科学, Metric‎
Science
等级 B
2004

技能

熟练 Conservation Awareness
熟练 Quality Control Processes Command

语言

熟练 乌尔都语