I graduated Bachelor Degree in Electrical Engineering from QUEST Nawabshah, I have more than four years of working experience in the field of Project Management on different types of projects, where I learned the valuable professional skills such as project Scheduling, Initiating, Execution, Controlling and finalization.
I am currently working on Quetta International Airport and we are installating following equipments
• Passenger Boarding Bridges (PBB)
• AXA Ground Power Units (GPU) 90KVA, 400Hz.
• Advanced Visual Docking Guidance Systems (T3 Model).
• Mini Hatch Pit systems 180KVA, 400Hz.
I worked at Jinnah International Airport, Karachi and Installed, Terminated, Tested & Commissioned Following Equipment
• Ground Power Units (GPU) 180-90KVA, 400Hz.
• Advanced Visual Docking Guidance Systems (T3 Model).
• Pop-Up Pit systems 180-90KVA, 400Hz.
• Surveillance System
• Fiber Optic Cable
I worked at Multan International Airport and Installed, Terminated, Tested & Commissioned Following Equipment
• Passenger Boarding Bridges (PBB) Multan International Airport. (MIAP).
• Ground Power Units (GPU) 90KVA, 400Hz.
• Advanced Visual Docking Guidance Systems (T1 Model).
• Mini Hatch Pit systems 90KVA, 400Hz.
Worked on Following Projects
1. 132/11.5kv sub-station Bahria Town Lahore
2. 132/11.5kv sub-station Fatehpur
3. 132/11.5kv sub-station Alipur
During Installation i worked on Cable laying, Termination, Testing and Commissioning of following Equipments
132/11.5kv, 20/26 MVA Power Transformer
145kv SF-6 3-Pole Circuit Breaker, Current Transformer, Bus Dis-connectors
120kv Surge Arrestor
132kv Control and Relay Panels
11kv VCB type Switchgear Panels