工作经历

公司标识
production enineer
FFC
Jun 2015 - Jun 2017 | Sadiqabad, Pakistan

• Worked at two General Electric (GE) MS-5000 Gas Turbines of 18 MW capacity each, and have detailed knowledge of its operations and troubleshooting

• Studied the entire electrical distribution system of FFC including 13 substations, 11KV, 6.3KV and 380V electric supply

• Electrical Load Management System (ELMS) logic description study and handling

• Working with two Waste Heat Boilers (WHBs), each having a capacity of 55 tons/hr of high pressure steam (40kg/cm2)

• Handling the operation of an Auxiliary Boiler of capacity 70 Tons/hr of very high pressure steam (105kg/cm2)

• Worked in Turn Around on Gas Turbines and Boilers (including the wet washing of Gas Turbine)

• Trouble Shooting of Compressors, Steam Turbines and Pumps

• Operation of Cooling Tower of capacity 32,000 m3/hr load and optimization of its chemical parameters

• Instrument Air and Utility Air Plant operations

• Inert Gas Generation Facility controlling

• Operations of Pre-Treatment & Treatment of Raw Water, including the controlling of four separate running Demineralization Lines

学历

University of Engineering & Technology
学士, Bachelors in Engineering, Chemical Engineering‎
chemcal engineering
CGPA 2.7/4
2015

语言

中级 旁遮普语
中级 英语
中级 乌尔都语

关注的公司