概要

Responsibilities
Fabrication of bottom plates of oil Storage Tanks
Fabrication of shell plates of oil Storage Tanks
shells rolling.
Fabrication of Man hole &D-Door
Fabrication of roof plates of oil Storage Tanks
Fabrication of Tank nozzles and other attachments.
Fabrication of roof structure
Erection of bottom plates,shell plates
Erection of roof structure & laying of roof plates.
Preparation of hydro testing of tank

工作经历

公司标识
Mechanical Supervisor
Interglobe Commerce Pakistan (PVT) LTD
Apr 2018 - Apr 2021 | Rawalpindi, Pakistan

Responsibilities
Fabrication of bottom plates of oil Storage Tanks
Fabrication of shell plates of oil Storage Tanks
shells rolling.
Fabrication of Man hole &D-Door
Fabrication of roof plates of oil Storage Tanks
Fabrication of Tank nozzles and other attachments.
Fabrication of roof structure
Erection of bottom plates,shell plates
Erection of roof structure & laying of roof plates.
Preparation of hydro testing of tank,

公司标识
Fabricator
SEFEC ENGINEERING (PVT) LIMITED
Sep 2017 - Mar 2018 | Karachi, Pakistan

Responsibilities
Fabrication of bottom plates of oil Storage Tanks
Fabrication of shell plates of oil Storage Tanks
shells rolling.
Fabrication of Man hole &D-Door
Fabrication of roof plates of oil Storage Tanks
Fabrication of Tank nozzles and other attachments.
Fabrication of roof structure

公司标识
Fabricator
SEFEC ENGINEERING (PVT) LIMITED
Sep 2017 - Mar 2018 | Karachi, Pakistan

Responsibilities
Fabrication of bottom plates of oil Storage Tanks
Fabrication of shell plates of oil Storage Tanks
shells rolling.
Fabrication of Man hole &D-Door
Fabrication of roof plates of oil Storage Tanks
Fabrication of Tank nozzles and other attachments.
Fabrication of roof structure

公司标识
Fabricator
Hyundai Engineering Pakistan (Pvt) Ltd
Jul 2015 - Dec 2016 | Rawalpindi, Pakistan

Responsibility
Monitor and controlled all the fabrication activities on pipeline according to B31.3 and project
specification.
Monitor and controlled all the fabrication activities on Structure.
Review All Procedures according to Project specification.
Prepare isometric drawing as per site in workshop.
Check all fabrication work in workshop .
Perform hydro testing of pipeline.
Prepare daily progress report.
Fabrication,Erection activity.
Coordinate the fabrication team in workshop and arrange the material for fabrication.
Erection the spool at site.
Erection of bottom plates, shell plates
Erection of roof structure & laying of roof plates.
Preparation of hydro testing of tank,
Hydro static testing of all welding joints.

公司标识
Fabricator
Al Tariq Construction Pvt LTD
Mar 2014 - Jul 2015 | Rawalpindi, Pakistan

Responsibilities
Fabrication of bottom plates of oil Storage Tanks
Fabrication of shell plates of oil Storage Tanks
shells rolling.
Fabrication of Man hole &D-Door
Fabrication of roof plates of oil Storage Tanks

公司标识
Fitter
Descon Engineering Pvt LTD
Sep 2013 - Jan 2014 | Kohat, Pakistan

Responsibilities
Fabrication of bottom plates of oil Storage Tanks
Fabrication of shell plates of oil Storage Tanks
shells rolling.
Fabrication of Man hole &D-Door
Fabrication of roof plates of oil Storage Tanks

学历

Pakistan Board of Technical Education Lahore
大专, DAE Mechanical‎
Mechanical
Completed
2013
BISE
大学入学/0级, 科学, matric‎
Science
所占比重 72%
2010

语言

初学者 英语
熟练 乌尔都语