概要

My work experience is about 7 years in civil works.

工作经历

公司标识
Senior Engineer
Usman Ibrahim Contractors
Aug 2022 - 代表 | Karachi, Pakistan

Enter Description

公司标识
Assistant Manager Civil
Pakistan Security Printing Corporation
Jun 2020 - Jul 2022 | Karachi, Pakistan

Report writing, preparation of BOQS, repair and maintenance work

公司标识
Field Engineer
SAFWCO
Jul 2019 - Nov 2019 | Umer Kot, Pakistan

The proposed project aims to contribute & concentrate on increased access to portable drinking water through installation, rehabilitation & restoration of damaged water sources. The project will increase existing water discharge capacity of the communal dug wells through upgrading them with submersible pumps powered by renewable energy. Community local water reservoirs will also be repaired for storage of water aimed at both human & livestock animals. At Institution level, primary schools will be provided with drinking water & sanitation facilities to build students resilience to recurrent draught shocks.

公司标识
Junior Engineer
Associated Consulting Engineers Pvt. Ltd
Mar 2016 - Feb 2019 | Kashmir, Pakistan


Project DetailsThe Project utilizes a gross head of 420m by diverting the Neelum River at Nauseri to the lower reach of the Jhelum River at Zimanabad through a 32.5 km long tunnel system. A concrete gravity diversion dam will be 160m long by 60m high with 03 radial gates and a large flap gates at Nauseri on the Neelum River. The intake structure with a capacity of 280 cumecs is located close to the diversion dam and incorporates six intake gates, which are connected to the sedimentation basins. A diversion tunnel with a capacity of 500 cumecs is built to carry dry season flows only around the dam foundation site. A headrace tunnel system of 28.5 km is constructed. An underground power station having 04 units with a total maximum capacity of 969 MW is constructed at Chattar Kalas, Muzaffarabad. 12 single phase transformers units are to be installed each 98.33 MVA at the power station. An approximate 4 km long tailrace tunnel will discharge the collected water in Jhelum River at Zaminabad.My Responsibilities1. Inspection and supervision of following construction works2. Structural concrete works of Main Dam spillway piers, stilling basin, intake & sedimentation basin, collecting canal & protection slabs.3. Inspection of reinforcement for these hydraulic structures, water stop installation etc.4. Installation of grouting system (grout, drain, vent pipes & grooves) at the contraction joints.5. Placing of different types of concrete of strength varies from 12psi to 60psi in lifts of specified height.6. Exposing/ preparation of rock beds foundation.Dewatering & control of water during at concrete works.7. Slop Stabilization by using rock bolt & shotcrete.Placing of roller compacted concrete & its related testing.8. Installation of anchor bolts & drainage holes inside the rock in spillway & stilling basin area.Preparation of daily, weekly & monthly progress reports.9. Supervision of backfill behind sedimentation basin left wall.10.Contact grouting in tunnel.

学历

Phoenix Consultant
证书, IOSH Managing Safely‎
Safety Training
Completed
2017
Sir Syed University Of Engg. & Technology Karachi.
学士, 技术学士, BS Civil Engineering‎
Construction Studies
CGPA 2.65/4
2014

技能

中级 Civil Affairs Handling
初学者 Civil Design Knowledge
初学者 Civil Drafting
熟练 Civil Engineer
中级 Civil Procedures
熟练 Civil Supervision Skills
熟练 Computer Skills
中级 Construction Management
熟练 Construction Site Management
中级 Cooordination Skills
熟练 Documentation
中级 Engineering Skills
初学者 Fluent in English
初学者 Handling Assignments
熟练 Metallurgical Skills
中级 MS Excel
中级 Problem Solving Skills
熟练 Receptionist Task Management
中级 Site Administration
熟练 Site Development
熟练 Special Effects

语言

熟练 乌尔都语
中级 信德语
中级 英语