Mechanical engineer with over 10 years of diversified power sector experience in Operation, Maintenance, performance, project planning& development, handling multiple projects and managing multidisciplinary teams. Industry proven ability for liaising with suppliers and contractors, resolving complex technical issues and achieving challenging results.
Details of Skills and Experience.
1.Expertise in Gas Engines Jenbacher,MTU,Caterpillar, Steam Turbine ,Air Conditioning / HVAC System Absorption & Electric Chillers
2.Boilers including Gas fired, Coal Fired, Package Boilers, WHRBs.
3.Air Compressors Cooper, Atlas Copco, IR, and Allied Air.
4.Waste water Treatment, RO Plants ( Pakistan, Turkey/Italy Vendors).
5.Fire fighting system with efficient Pump Designs (USA/Italy Vendors).
6.Balance of Plant
7.Pumping Systems Network Developed In-house Grundfoss, KSB, CNP, Pentair Etc.
8. Electrical T&D Systems (Grid + Island, HT, LT).
9. PLC Systems & Related Instrumentation ABB, Schneider, PEL, Siemens, Mitsubishi, Allen Bradley Etc.
10.Utility Companies Dispute Resolution SSGC, KE, KWSB.
11. Thermal Designs, Engineering Economics, Co-Generation, Control System, Procurement Analysis& Cost Cutting, Maintenance and engineering Solutions, Projects Planning and Development, Microsoft office, ERP,MS Project, AutoCAD.
12.Project Feasibility, Pay back IRR, Procurement Planning and Evaluation, inspection, Technical meetings, Commissioning and Performance tests.
13. Environmental Management System compliance (ISO 14001) and Audits related to Utilities, Energy Management System ISO 50001.
1. Managing All Energy Projects, including own captive power plant( Gas Engines Jenbacher, Caterpillar MTU), Solar power, Gas/coal fired steam boilers( BONO, Bosh, Cochran, Razzaq, DDFC), Thermal oil Heaters (BONO, Bosh, Cochran, Razzaq, DDFC),Air compressors( IR,ATLAS COPCO, Allied Air), ETP and RO plant.2. Project Management, Designing, Selection, Feasibility and Cost Analysis, and Procurement of efficient gas engines, chillers, air compressors, Solar power, processing machines, steam boilers, thermal oil heaters, Civil Constructions, Fire fighting systems, with cost effective solutions.3.Planning and organization of water sources and specially, Bore water, KDA supplies, its usage at machines and boilers with good water chemistry for optimum efficiency of equipment.4. Dispute resolutions related to KWSB,KDA, SSGC, K Electric, LATI.1. Managing All Energy Projects, including own captive power plant( Gas Engines Jenbacher, Caterpillar MTU), Solar power, Gas/coal fired steam boilers( BONO, Bosh, Cochran, Razzaq, DDFC), Thermal oil Heaters (BONO, Bosh, Cochran, Razzaq, DDFC),Air compressors( IR,ATLAS COPCO, Allied Air), ETP and RO plant. 2. Project Management, Designing, Selection, Feasibility and Cost Analysis, and Procurement of efficient gas engines, chillers, air compressors, Solar power, processing machines, steam boilers, thermal oil heaters, Civil Constructions, Fire fighting systems, with cost effective solutions. 3.Planning and organization of water sources and specially, Bore water, KDA supplies, its usage at machines and boilers with good water chemistry for optimum efficiency of equipment. 4. Dispute resolutions related to KWSB,KDA, SSGC, K Electric, LATI.…see more
Skills: Facility Management (FM) · ERP Implementations · 3D Computer Aided Design (3D CAD) · ISO 50001 · ISO 14001 · Energy Efficiency · Renewable Energy Systems · Project Planning and management · Construction · Energy Management Systems (EMS) · Environmental Management Systems · Waste Water Treatment Plants · HVAC Engineering · Dispute Resolution · Water Resource Management · Thermal System Design · Utilities Management · Costings · Feasibility Studies · Change Management · Requirements Analysis · Troubleshooting · Planning · Enterprise Resource Planning (ERP) · Construction Management · Project Coordination · Project Planning · Engineering · Operations Management · Budgeting · Project Management
1.Managing all Energy Projects & Mills Utilities including Own Captive Power Plant, Gas/ Coal /Waste Heat Boilers, Thermal Oil Heaters, Hot water Utilization and Recovery, Caustic recovery Plant, Waste Water Treatment Plant, RO Plants and other Spares and consumables of a processing unit.2.Designing, Selection & procurement of Efficient Power Plant Engines, Gas-fired Steam boilers, Thermal Oil Heaters, Electric and Absorption Chillers, RO plants including civil construction, ventilation system, cooling towers, etc.3.Exhaust Heat Recovery from all heat sources in Power Plant i.e. Jacket Water Heat Recovery, Exhaust Heat utilization with maximum recovery & steam output.4.Utilization of Drain Caustic up to 75% by Designing of Caustic recovery plant at minimum utilization of steam, with innovative new ideas related to mechanical & electrical designs. It includes new tank designs, their cleaning mechanisms, operational procedures, and related recoveries.5.Planning and organizing water sources and especially bore water by designing and selecting an appropriate design to get maximum water from UG. For that water, designing, and selection of Reverse Osmosis Plant with its maximum usage.6.Cost Analysis of operations of the Utilities and engineering department for the maximum saving of allocated powers.1.Managing all Energy Projects & Mills Utilities including Own Captive Power Plant, Gas/ Coal /Waste Heat Boilers, Thermal Oil Heaters, Hot water Utilization and Recovery, Caustic recovery Plant, Waste Water Treatment Plant, RO Plants and other Spares and consumables of a processing unit. 2.Designing, Selection & procurement of Efficient Power Plant Engines, Gas-fired Steam boilers, Thermal Oil Heaters, Electric and Absorption Chillers, RO plants including civil construction, ventilation system, cooling towers, etc. 3.Exhaust Heat Recovery from all heat sources in Power Plant i.e. Jacket Water Heat Recovery, Exhaust Heat utilization with maximum recovery & steam output. 4.Utilization of Drain Caustic up to 75% by Designing of Caustic recovery plant at minimum utilization of steam, with innovative new ideas related to mechanical & electrical designs. It includes new tank designs, their cleaning mechanisms, operational procedures, and related recoveries. 5.Planning and organizing water sources and especially bore water by designing and selecting an appropriate design to get maximum water from UG. For that water, designing, and selection of Reverse Osmosis Plant with its maximum usage. 6.Cost Analysis of operations of the Utilities and engineering department for the maximum saving of allocated powers.…see more
Skills: Facility Management (FM) · ERP Implementations · 3D Computer Aided Design (3D CAD) · ISO 50001 · ISO 14001 · Energy Efficiency · Renewable Energy Systems · Project Planning and management · Construction · Energy Management Systems (EMS) · Environmental Management Systems · Waste Water Treatment Plants · HVAC Engineering · Dispute Resolution · Water Resource Management · Thermal System Design · Utilities Management · Costings · Feasibility Studies · Change Management · Requirements Analysis · Troubleshooting · Planning · Enterprise Resource Planning (ERP) · Construction Management · Project Coordination · Project Planning · Engineering · Operations Management · Budgeting · Project Management
1.Managing all Energy Projects & Utilities including Captive Power Plant.2.Operation,maintenance,of complete power house equipped with Jenbacher Gas engines JGS-620, Hot water Absorbtion Chiller, Waste heat recovery boilers, Steam Turbine.3. Project Management of Combine cycle power Project, PEB shades,HVAC Designs, Autocad Designs and Construction of Building.4.Cost Analysis of operations of Utilities and department for maximum saving of allocatedpowers.5.Proactively manage changes in project scope, identify potential crises, and devisecontingency plans.1.Managing all Energy Projects & Utilities including Captive Power Plant. 2.Operation,maintenance,of complete power house equipped with Jenbacher Gas engines JGS-620, Hot water Absorbtion Chiller, Waste heat recovery boilers, Steam Turbine. 3. Project Management of Combine cycle power Project, PEB shades,HVAC Designs, Autocad Designs and Construction of Building. 4.Cost Analysis of operations of Utilities and department for maximum saving of allocated powers. 5.Proactively manage changes in project scope, identify potential crises, and devise contingency plans.…see more
Skills: Facility Management (FM) · ERP Implementations · ISO 50001 · ISO 14001 · Energy Efficiency · Project Planning and management · HVAC Engineering · Dispute Resolution · Water Resource Management · Thermal System Design · Utilities Management · Costings · Requirements Analysis · Troubleshooting · Enterprise Resource Planning (ERP) · Construction Management · Project Coordination · Operations Management · Project Management
Looking after day to day power house operations and maintenance work.Cost Analysis of complete power house.Looking after day to day power house operations and maintenance work. Cost Analysis of complete power house.
Skills: ERP Implementations · ISO 50001 · ISO 14001 · Energy Efficiency · Project Planning and management · Dispute Resolution · Water Resource Management · Thermal System Design · Requirements Analysis · Troubleshooting · Enterprise Resource Planning (ERP) · Construction Management · Project Coordination