概要

4000 MW Quarayyah Combined Cycle Power Plant being constructed adjacent to the existing Qurayyah l Power Plant approximately 100 km south of Damman. The project comprises 18 GE frame 7FA gas turbines and 6 GE D11 Steam turbines consisting of 6 blocks, three gas turbines, related HRSGs and 1 steam turbine to each block.
Testing Motor Operated Valve, control pressure , temperature element etc, and troubleshooting
Control Valve and motor operated valve calibration
Expertise in master schematic

项目

Qurayyah Power Plant

工作经历

公司标识
E&I Engineer
Doosan Heavy Industries & Constructions
Sep 2018 - 代表 | Jubail Industrial City, Saudi Arabia

The Fadhili combined heat power plant 1500MW consist of Five (5) Siemens SGT6 5000F gas turbine generator 250MW unit (GTG), Five (5) fired HRSG utilizing the exhaust heat of the gas turbine and Two(2) Doosan DST-S10 steam turbine generator 176MW unit (STG),and one (1) Reserve Boiler

公司标识
Instrumentation Engineer
JSTS
Apr 2016 - 代表 | Lahore, Pakistan

JSTS was founded in 1988.
It specialized in providing Engineering Design and Services for Sugar Factories, Steel Industry and Cable Factories.
In 1990, it started its own manufacturing of Electrical Systems to cater the need of industry. JSTS not only sells its own products but represents largest machinery manufacturer of south China, Guangzhou Guangzhou Enterprise Group Corp (www.gzhm.com) for its wide ranging products.

公司标识
Instrumentation and Electric Engineer.
Doosan Heavy industries
Jan 2015 - Mar 2016 , Saudi Arabia

I have 5 Experience in combine cycle power plan
Steam Turbine commissioning and operation

公司标识
Instrument And Control Froman
Arabian Bemco Company
Jan 2012 - May 2014 | Dammam, Saudi Arabia

学历

PPI institute
大专, Diploma Association Engineering‎
Electrical
Completed
2011

语言

熟练 乌尔都语
中级 英语

关注的公司