09+ Years of Experience in Mechanical
Maintenance.
Managing the Maintenance Department
Working as head of Department
Maintenance Engineer
Maintenance Engineer
-Erection & commissioning experience of 220 m^3MDF Board Plant as Project Execution Engineer
-Erection of new machines & modified second hand machines.
-Erection of Thermal oil pumping unit & its piping for Hot Press (19.2 G.cal/hr with ∆T 35°C)
-Erection & Fabrication of Ducts, cyclones, Bag filter systems, steel structures & piping.
-Layout designing through AutoCAD & installation of machines & parts as per drawing.
-Erection of Building Shed (Area Sq Ft 8504)
-Erection of Hydrlic units & its operation
-Making scheduled checks on machineries, parts and equipment and performing Preventive and Predictive Maintenance.
-Maintain reorder point of each machiney and its related accessories.
-Maintaining the inventory of local & imported items required for New Plant
-SOPs for Plant machines & equipments.
-Planning and execution of Planned Monthly and Annual Plant Maintenance.
-To perform technical analysis and enhance the production and quality by adopting modification work on different plant machineries.
-Managing unplanned work resulting from breakdown and emergencies, in a positive and efficient manner.
-Performing technical parameters of critical machines.
-Maintenance of rotary & stationary machines like drum chippers, centrifugal pumps, blowers & centrifugal fans & cooling towers, belt conveyors, chain conveyors & bucket elevators.
-Operation of Boge compressors S-60-2 ,S-125 & S-150-3
-Maintenance of MDF (Medium Density Fiber) board Plant special machines, Refiner L-36, Refiner L-42, Day Light -Opening Hot Press & Mende Auma Hot Press
-Maintenance of different types of Belt conveyors, Roller conveyors, chain conveyors & bucket elevator.
-Operation & maintenance experience of Reverse osmosis plant (25m^3).
-Operation & maintenance experience of Energy plant (25Gcal/hr capacity) for thermal oil heating & steam generation.
Managing team of 50 memebers, including general staff, shifts staff, workshop and fabrication team.