LT and HT penal Termination Of Instruments.
Distribution Box Termination.
Installation of LT Wiring.
Dcs Terminations.
Field Terminations Gauges, Transmitters, Control valve, Motorized Operated Valve, Pneumatic valve….
Installation Of Instruments In Turbine.
Installation Of Orifice Plate, Differential
Intelligent Pressure Transmitters, Thermocouples, Rtds, Pressure Switches, Magnetic Gauges, Pressure Gauges, Temperature Gauges Etc……….
Power Cable Laydring Tranches and Trays.
Project of waste heat recovery power plant at bestway cement farooqia
Electrical and Electronics working experience in Automation Plant PLC and SCADA system, single/three phase working Experience And the new Installation of electrical equipment’s, invertor, 3 phase motors, servo drive and fault troubleshooting etc...,