工作经历

公司标识
Deputy Manager Production Engineering
Thal Engineering (House of Habib)
Jan 2022 - 代表 | Karachi, Pakistan

·         Successfully led the line setup of in-house assembly of alternators and starters for one the largest tractor manufacturers in Pakistan.
·         Reduced Takt time for HVAC unit, thus saving precious man hours and cost.
·         Successfully implemented the idea of using sun light as source of light resulting in the reduction of consumption of monthly units of electricity.
·         Managing the execution of the localization projects and facility development.
·         Conducting monthly APQP (Advance Product and Quality Planning) meeting to proactively identify the requirements of the upcoming projects.
·         Responsible for the coordination with all stakeholders for the execution of the localization projects.
·         Preparation of annual budget planning (OPEX and Capacity Analysis)
·         Responsible for ISO, EMS & OHSAS audit activities.
·         Active participation in 5S, Energy Conservation and Continuous Improvement activities (Kaizens).

公司标识
Project Engineer
Thal Engineering (House of Habib)
Jul 2019 - Jan 2022 | Karachi, Pakistan

·         Engaged in manufacturing feasibility study of new products and projects.
·         Preparation of technical comparisons for new product.
·         Planning and scheduling of new projects.
·         Communication with customer and TAA partner, DENSO Japan, for technical matters related to project and production.
·         Preparation and agreement of sourcing plan with TAA partner, DENSO Japan, and customer.
·         Preparation of investment details for new projects and existing facility improvement activities.
·         Actively engaged in identification, proposing and ensuring improvements in production processes for increased productivity and cost saving.
·         Coordinate for existing processes capacity monitoring and analysis to conclude for improvements.
·         Responsible for planning of equipment addition if required during capacity enhancement activity.
·         Preparation of annual budget planning (OPEX and Capacity Analysis)
·         Responsible for ISO, EMS & OHSAS audit activities.
Active participation in 5S, Energy Conservation and Continuous Improvement activities (Kaizens). 

公司标识
Assistant Manager Production and Planning
Hinopak Motors Limited
Apr 2016 - Jul 2019 | Karachi, Pakistan

· Developed Refrigeration Vehicle for Pakistan Navy as per customer specs in minimum possible cost.
· Successfully implemented OGRA safety standards for the design of Fuel Tankers.
· Reduced weight and hence cost of intercity air conditioned bus resulting in better aerodynamics.
· Ensuring production as per monthly requirements and quality standards.
· Coordination within and / or other departments to resolve production and quality related issues.
· Coordination with the stakeholders on procurement and operations to ensure timely completion of the project.
· Management of projects by planning, organizing, motivating, directing and controlling the resources that are being applied to the project.
· Necessary technical correspondence with foreign manufacturers and equipment suppliers.
· Implementation and maintenance of 5S culture to increase productivity, quality, ergonomics and safety.
· Identification and elimination of work-place safety hazards.
· Conducting workers training sessions relating to self-quality production.
· Preparation of monthly closing reports.
· Monitoring of MRP (Material Requirement Plan) & RMR (Raw Material Requirements).
· Responsible for ISO, EMS & OHSAS audit activities.
· Active participation in 5S, Energy Conservation and Continuous Improvement activities (Kaizens).

公司标识
Trainee Engineer
Hinopak Motors Limted
Aug 2014 - Mar 2016 | Karachi, Pakistan

· Technical study of various objects which are to be used in the body fabrication.
· Drawings for new parts development.
· Updating hand drawings into CAD model.
· Updating structure drawings of commercial trucks and buses according to new design.
· Issuance of updated drawings to production line.
· Facilitating production department in getting material from store accordingly.

公司标识
QMS Executive
Alkaram Textile Mills Private Limited
Apr 2014 - Jul 2014 | Karachi, Pakistan


· Part of team to have successfully completed the IKEA quality audit.
. Conducting internal quality audits.
· Helping different departments in maintaining their documentation record as per ISO.
· Updating procedures, work instructions, formats, standards and JDs of departments.
· Making sure timely circulation of updated documents to concern departments.
· Making sure whatever is being written in documents is being done and whatever is being done is being written.

学历

NED University of Engineering & Technology
硕士, 科学硕士学位, Masters in Engineering Management‎
Industrial Management
CGPA 3.4/4
2015
NED University of Engineering & Technology
学士, Bachelors in Engineering, BE in Industrial and Manufacturing‎
Industrial Manufacturing
CGPA 3.0/4
2013

技能

熟练 Project Administration
熟练 5S
熟练 7S Standards
熟练 Achieve Results
熟练 Activity Controls
熟练 Adaptive Leadership
熟练 Adhesive
熟练 Agile Project Management
熟练 Analytic Reporting
熟练 Analytical Skills
熟练 Blow Molding Skills
熟练 Building Relationships
熟练 Business Exposure
熟练 Business Negotiation
熟练 C Problem Solving
熟练 Calll Handling
熟练 Chemical Engineer
熟练 Chemical Experience
熟练 Collaborative
熟练 Configuring Software
熟练 Conflict Management
熟练 Contract Negotiation
熟练 Cooordination Skills
熟练 Cooperation
熟练 Coordination
熟练 Cost Efficiency
熟练 Customer Acquisition
熟练 Customer Interaction
熟练 Customer Service Solutions
熟练 Delievry Planning
熟练 Demand Planning
熟练 Design Greener Products
熟练 Design Skills
中级 Distribution Logistics
熟练 ERP Software Command
熟练 Fabrication
熟练 Farm Knowledge
熟练 FaroArm
熟练 Finance Administration
熟练 Fincane Reporting
熟练 Fixtures
熟练 Fleet Management 
熟练 Flexography
熟练 Fluent in English
熟练 Fluent in Urdu
熟练 Follow up
熟练 General Chemicals
熟练 Handling Inventory
熟练 Industrial Sales
熟练 Informtion Collection

语言

熟练 英语
熟练 乌尔都语