概要

Innovative. Industrious. Talented. Mechanical Engineer with proven track record in learning new design
skills since graduating with a Mechanical Engineering degree in 2012. Excellent interpersonal and
communication abilities, and possess a wide range of technical skills. Enjoys being part of a team, as well as
managing and motivating a productive team, and thrives in high pressure and challenging working
environments.I am API 510 certified pressure vessel inspector having 4 years of progressive and dynamic
experience in inspection of static equipment, pressure vessel, welding and piping. I have knowledge about
matters and information pertaining to pressure retaining items, ability to write reports, apply safety codes and
standards and establish effective relationship with coworkers.I am looking to join some organization with
learning oriented opportunities where I can apply my knowledge, skills and work to achieve personal and
organizational goals.

项目

Yanbu Power And Desalination Plant Saudi Arabia

工作经历

公司标识
Project Engineer
Business And Engineering Trends
Apr 2019 - 代表 | Karachi, Pakistan

Lucky Coal Fired Power Plant - Client-SEPCOIII & Lucky Electric Power Company Ltd.

Provide technical support to the engineering team in executive projects.
Investigate technical aspects and root cause of problems and Initiate corrective actions to rectify problems.
Develop preventative measures to prevent recurrence of problems. Assess the impact of deviation on product quality.
Coordinate with technicians in developing engineering designs.
Determine product disposition and various technical issues relating to a product.
Ensure collaborative relationship with manufacturing floor personnel.
Implement best practices in developing technical solutions.
Managing process from inquiry development, estimating, order closing to project management and completion.
Making technical presentations and demonstrating how our products meet client needs. Provide, as appropriate, consultancy to aid customers in the development of their requirements.
Providing pre-sales technical assistance and product education.
Ensure client satisfaction with the project process and project team by effective and timely communication including status reporting, continual risk/issue assessment/management and escalation, and resolution of issues as they arise.
Working as a project in charge during the execution of the projects at various project sites, successfully dealt with the associated problems and ensure timely completion as per given timeline.
Maintaining records of customer communication and sales activity in our CRM and established internal.

公司标识
Mechanical Engineer
GSSE
Apr 2016 - May 2018 , Saudi Arabia

GSSESaudi Arabia (KSA)
Mechanical Engineer/Site EngineerApril 2016 June 2018
Yanbu Power & Desalination Plant Phase 3 - Client-SEPCOIII & SWCC Sept 2017 June 2018
Manage and lead a multi-discipline engineering and maintenance support team to provide engineering support to the Asset Production Facilities to ensure safe, efficient and effective operation and maintenance to help maximize the return from the fields during their life cycle.
Plan and execute piping activities like pre fabrication and erection of Piping systems along with Supports erection, Erection of Tanks, pumps & valves as per layouts, NDT, Punch killing of test packs and Performing hydro test and insure that work is running as per required standard or as per specification provided by Client.
Installation of Centralized air conditioning system and Installation and alignment of Pumps and other static equipment.
Preparing BOQ and other technical writing & documentation and complete installation of LFO system.
Prepare comprehensive work packages for field execution staff regarding Refurbishment activities from the work request generated by inspection department.
Allocation of resources, technical queries and client co-ordination.
Installed the chemical dosing system for the process additives.
FRP piping installed as per construction code specified.
Identify potential project risks and propose appropriate solutions where possible.
Box up of all dismantle parts and performed hydro test as per given specifications.
Assessment of monthly progress invoices and claims for additional and varied works.
Ensuring and monitoring that QA/QC and safety procedures to be fully followed at site.
Main Pipe Rack, Pipe Bridges, Heavy Platform Structure, Heavy Supports and Pipe Sleepers.
Execute given task as per Client safe work procedures.

公司标识
Site Engineer
Pak Premier Engineering
Dec 2014 - Mar 2016 | Lahore, Pakistan

Site Engineer December 2014-March 2016
Installation of roof top packed unit at Herbion Pharmaceutical Company.
Installation of firefighting piping in PIC (Punjab Institute of Cardiology).
Maintenance of the air cooled chiller in the Shoukat Khanam Memorial Cancer Hospital.
Equipment erection (static equipment like valves and fin fans).
Recommend actions to correct safety hazards.
Installation of centralized air condition system in Nawaz Shareef Medical College Raiwind.
Make ensure that all parameters met the operation requirements.
Monitoring the piping erection as per site and isometric
Preparation of Weld Map as per isometric.
Revision on spools and drawings as per new changes in site
Preparation of FDM as per new modification with approval of client
Evaluation of technical problem using CAD Layout.
Incorporation of personnel dexterous in site fabrication and erection for critical issues.
Preparation of RFI and Hydro-Test for QA/QC inspection.
Preparation of RFI for FITUP and VISUAL Joints
Follow up the approved WPS for relevant piping system and acceptable tolerance level.
Attending weekly meetings with client and consultants
Preparation of daily progress report with joints details and activities location.
Preparation of hydro test packages for testing and pneumatic for air test.
Installation of pumps, valves, compressors, chillers units, vessels as per design.

公司标识
Operation And Maintenance Engineer
Shahnawaz Engineering Pvt.ltd.
Sep 2012 - Oct 2014 | Lahore, Pakistan

Operation & maintenance Engineer
Hyper star Market Fortress stadium Lahore-Client-MAF September 2012 October 2014
Preventive Maintenance of Chillers, Pumps & AHUS.
Make the repairs and replacements wherever and whenever necessary.
Supervised the mechanics and workers properly for allotting the maintenance responsibilities.
Inventory each piece of equipment and its parts to see which spare parts need to be ordered or kept in the department to minimize down-time & to maintain the minimum stock of all such items in store.
Advising the purchasing department on tooling & product purchase.
Make ensure that all parameters met the operation requirements.
Prepare the schedule of the annually overhauling of the chillers and burners.
Ensure that the Machines are regularly serviced and functioning without problems.
Create the proper schedules for the maintenance work.
Make the repairs and replacements wherever and whenever necessary.
D-Scaling of the condenser tubes, evaporator and cooling water fins.
Maintain the production of the chillers as per owner user.
Design consideration, develop and implements of standard maintenance procedure and developing the maintenance plan and work procedure of equipment along with HSE rule and regulation.
Preparation of Preventive maintenance Plan and schedule yearly, monthly and weekly as per vendor recommended in O&M manual and extraction of required routine task from the Plan.
Before execution of any jobs ensure the equipment is fully isolated from Mechanical, Electrical, Thermal and Pressure hazards and work crew member understand the kind of job and related hazards.

学历

Bahauddin Zakariya University
学士, Bachelors in Engineering, BSc(Hon's) Mechanical engineering‎
GSM
CGPA 3.2/4
2012

技能

熟练 Handling Assignments
中级 رسم الآلات

语言

熟练 英语
熟练 乌尔都语