Experienced Electrical Engineer, with over 9 years of expertise in technical & managerial skills and a proven track record in Construction, Designing, Installation, Testing & Commissioning of Electrical equipments Demonstrated expertise in project management, system optimization, and regulatory compliance. Seeking new opportunities to apply my skills and drive success in innovative and challenging environments.
A)Monitor & Supervise all the installation activities on site including lighting works, Power system for HVAC Units, MDBs, MCCs, low current system and make coordination between all low current system.B) Installation of ALFANAR NES-H and ALPHA model 17.5 Kv MV Switchgears.C) Installation of KOHLER Medium Voltage generators upto 2500 KVA, 4.16 Kv.D) Installation of ALFANAR 13.8/4.16 Kv, 13.8/0.400 Kv transformers upto 5000 KVA.E) Installation of 1560 KVA, 4.16 Kv Hitachi MV Capacitos Banks.F) Installation of ALAFNAR Medium Voltage MCC Panels, 17.5 Kv.G) Installation of AUCOM MV Socftstarters 4.16 Kv nominal voltage.H) Installation of 900 Kw, 2256 Lps, 4.16 Kv Submerssible pumps.I) Installation of 265 Kw, 1308 Lps, 400 V Submerssible pumps.J) Installation of Siemens Low Voltage MDBs & distribution panel boards 220/400V.K) Installation of Earthing & Lightning protection system as per BS 7430.L) Installation of Cable Trays, PVC & EMT conduits, Electrical Junction Box, Switch & Sockets, lighting fixtures etc.M) Installation of Teletecnica, 125V, 100A DC system for Auxiliary supply for Switch gears.N) Installation of Fire Alarm system, telephone system etc. O) Supervise technicians with their technical requirements during, cable termination, tagging, ferrulling, cable dressing etc as per approved drawings to maintain good quality.
1. Develop Mapping & area load calculation of newly installed PMTs & Substations.2. Developed and improve proactive and cost effective maintenance strategy based on AMRs to avoid any damage.3. Monitor in-house inventory movement and complete inventory transfer forms for book keeping purposes, maintain all data in SAP.4. To ensure the monitoring of 62 Feeders and 950 PMTs wise losses and taking appropriate measures to reduce technical losses.5. Implement the project of ASAAN Meter policy and reduce losses therefore able to drag the category of VHL Feeders to ML Feeder.6. Implement the project of ABC (Arial Bundle Cabling) on HL PMTs by convincing the area stakeholders and define them the technical aspects behind the removal of old conductor.7. Implement the project of Multistory Bus Bars to keep K.E values up and full fill the safety requirements as per the international safety standards same have impact on commercial losses.8. Prepare the SLDs of LT networks specially for industrial feeders to enhance the load flow analysis and capture the faults in case of sudden shutdown or cable damage. 9. Implement the project of faulty meter replacement have time issues or reverse connections of CTs or having shunt discrepancies in meter.10. Budget and planning of manpower for the executions of upcoming FYs. 11. Determine the needs of components by review any changes that impact material or supplier, to adjust stocks accordingly with mutual coordination of purchase department.12. Execute NCs of below 40 KW consumers including Multistory buildings, commercial shops, Industrial units and houses.13. Recover max dues in the schemes of Hamara Azam, Paish Qadam etc14. Ensure that Department operates in accordance with all the applicable health, safety and environmental protocols leading towards safety and well-being of staff & public.
TEMPORARILY WORKED FOR 3 MONTHS WITH FACILITY CONTRACTOR IN HBL PLAZA I.I CHUNDRIGAR ROAD KARACHI.
EXPERIENCE:
a. Developing weekly & monthly maintenance procedures & ensuring implementations.
b. Managing & Monitor Electrical Power House with 1100, 500 & 635 KVA CAT gensets.
c. Follow up and Manage daily Job order system of overall maintenance department.
d. Carrying out inspections of the Facility and equipment to identify and resolve issues.
e. Checking Electrical, Mechanical and HVAC systems to ensure proper functionality.
f. Preparation of monthly progress reports.
g. Preparation of financial reports of equipment using on daily basis and make plans for cost reduction accordingly.
h. Monitor equipment inventory and place orders when necessary.
i. Plan and monitor the corrective and preventive maintenance of equipment.
j. Coordination with contactors, suppliers and 3rd party service providers to ensure smooth completion of projects/troubleshooting.
k. Monitor work orders and get them close timely.
l. Reporting to Facility Manager/Higher Management on daily and weekly basis.
Hands on experience in maintenance of Waukesha (950 KW, VHP type) Genset,Work on Woodward synchronizer to sink two Gensets, LT/HT room maintenance, Installation of CB’s, monitoring of continues changing in load, shifting of load from Genset to K.E,Able to inspect & supervise automation control component and process control Component, like PID controllers, temperature sensor/controllers, photocell, level sensor, pressure switches, Servomotor, thermocouple and all type of RTD, Pt100, Thermal over load, EOCR, Limit switch, Timer & Counter and their Calibration etc,Supervision of major over hauls and discussed with senior Manager and make a strategy for implementation so that to avoid the machine stoppage in future,Maintenance of Induction Machines specially (squirrel cage),Created technical documents, electrical drawings, spreadsheets and compiled their results,To analyze the maintenance record, identify the root cause and its remedial actions required to submit to management,Hand Experience of designing and installation of Star-Delta panels up to 200KW motors,Good knowledge of designing Reveres Forward circuit and DOL starting circuits.,Perform various duties as assigned.
Monitoring of Electrical/Electronics jobs & failure analysis in order to comply with maintenance strategies & objective, Spare parts and backup management providing cost effective and simple solutions and alternatives, Liaising with internal and external business units on maintenance activities to ensure timely completion of maintenance works and no disruption to plant operations, Calibration of all utilities and operational equipment and devices and their proper functioning/maintenance, Managing electrical man-power and assigning them specific responsibilities, Design engineering systems for the automation of industrial tasks, Maintain technical project files, Quality and Safety - Work in accordance with all safety regulations and requirements. Understand importance of product quality and ensure a safe working culture in the team.
Gain the opportunity to experience the working in Winding shop different types of faulty motors(I.M & DC) come for repairs. If there is any winding damage or burn, they simply replace the winding, also observe the working in Crane Maintenance Workshop & operation of Overhead Cranes.
Also read the SLDs of large Cargo ships & observe it’s internal wiring
Gain the opportunity to experience the operation of industry process units includes Ammonia, DAP, UREA plants & Utilities and Power Generation units also. Have the opportunity to experience the working of protection devices in fault conditions. In one week stay at electrical workshop make me familiar with the construction of I.M & also it’s troubleshooting
PROJECT: Additional Housing & Interim NOX for U.S Consulate, Karachi, Pakistan
a. Quality installation of Electrical equipment and accessories as per the procedures and perform the CVCs to verity the installation is correct and meet the requirement.
b. Preparing the Submittals of material & samples for client's approval.
c. Hand on experience on Computerized Maintenance Management System (CMMS), making of PM Schedule, collecting of equipment’s data, making of PM Template etc.
d. Testing & Commissioning of 100/80 A, Eaton’s Automatic Transfer Switches.
e. Testing and Commissioning of FG Wilson’s Emergency Genset at standby and prime rated values.
f. Perform the Functional Performance Tests of Automatic Transfer Switches, Emergency Generator, Lighting & Dimming Controls, Electrical Panels & Switchgear etc by following the criteria of HANSON PROFESSIONAL SERVICES INC.
g. Laying of H.T & L.T cables. Installation and commissioning of Pad Mount Transformer, Switch gear, Distribution Board, Street Light Poles etc.
h. Well awareness of building Fire Alarm System and Technical Security System. Installation of Horn Strobes, Heat and Smoke detectors, Duct smoke detectors and Fire dampers.
i. Selection of Contractors/Vendors based on financial workings and defined criteria
j. Coordination with clients, consultant for the installation and inspection.
k. Every week attend the Site work Progress meeting, Construction QC meeting with client and discuss the concern of client.
l. Monitor the progress on the site through the updated work schedules, including where corrective actions are required.
m. Making a daily plan for site work as per design drawing and specification.
n. Preparing of as builts and Method of statements for the approval from client.
o. To execute other assigned works as instructed by the Project manager related to engineering and site activities and to report him about the ongoing site activities.