概要

To enhance my skills through passionate,career, oriented and motivational tasks by working,in a dynamic environment in pursuit of communication expertise

项目

FFBL(COAL POWER PLANT)

工作经历

公司标识
Field Mechanical Engineer
Steel Erectors(Sub-Contractor of DESCON Engineering Ltd FFBL(COAL POWER PLT
Aug 2016 - Mar 2017 | Karachi, Pakistan

1) Process data required converting P & ID’s to piping layouts like a proper identification of valves, strainers, In-line instruments,
2) Utility summery giving utility consumption for each equipment with duty conditions like pressure, temperature etc.,
3) Conceptual equipment layout drawings for process plant reflecting the process constraints.
4) Process data sheets for equipments.
• Working Area: Piping of Steam Turbines
1. High Pressure Steam lines (HPS)
2. Low Pressure Steam lines (LPS)
3. Interconnecting Pipe lines (IC)
4. DW
5. IW
6. IA
7. LC

公司标识
Educational Internship
Thermal Power Plant Muzaffargarh Genco III
Jun 2015 - Feb 2016 | Muzaffargarh, Pakistan

Working Area
Boiler Steam Drum
Economizer
Super Heater
Condenser
Soutbloor
Furnace
Condensate pump
FD/ID Fans
Cooling Tower
Decanting Area
Pump Housei
Oil Cycle
Steam Cycle
Air Cycle
Turbine

公司标识
govt youth internship
Manan Shahid forging limited
Feb 2014 - Jun 2014 | Lahore, Pakistan

Under the supervision of the Program Coordinator, i participate in designing and implementing an evaluation of the Healthy Start program. Specific tasks are given below..
Participate in evaluation design and monthly evaluation coordinating meetings.
Conducting qualitative interviews and focus groups with program participants.
Manage program evaluation data, including generating analyses and summaries at regular intervals.
Contribute to the presentation of evaluation findings and the production of annual reports.

公司标识
boiler sub engineer
TPS Muzaffar garh (genco lll)
Jan 2012 - Jul 2012 | Muzaffargarh, Pakistan

Assist in designing, developing and executing construction projects.
Visit sites, prepare construction drawings and develop samples.
Work with engineering team in developing construction plan.
Determine budget, schedule, manpower and material and equipment requirements to execute construction project.
Report all expenses to Project Manager on timely basis.
Maintain quality assurance standards for projects.
Provide technical assistance to field staff when needed.
Analyze construction problems and recommend corrective actions.
Order and stock construction materials to avoid shortage

公司标识
Assistant Engineer
TPS Muzaffar garh Genco lll
Jun 2011 - Aug 2011 | Kot Addu, Pakistan

Supervises, and/or coordinates the work activities of subordinates

学历

University of Engineering & Technology
学士, 技术学士, BSc Mechanical engineering technology‎
Engineering Management
CGPA 2.6/4
2015
govt.college of technology multan
大专, Diploma of Associate Engineer Mechanical‎
Thermal System, Applied Mechanics and Design, Hydraulics
Completed
2011

技能

初学者 Front Office Support
初学者 Handling Assignments
初学者 رسم الآلات

语言

熟练 旁遮普语
熟练 Saraiki
熟练 乌尔都语
熟练 英语