To pursue a career in Electrical Engineering fields; seeking a challenging position in
reputed, dynamic and progressive organization where my technical and management skills utilize
effective promote with the organization.
Verifications: Degree has verified by Higher Education Commission
(HEC) Pakistan, Ministry of Foreign Affairs (MOFA) Pakistan and United Arab Emirates Embassy.
Responsible for the Quality Control, installation, testing, Commissioning and maintenance/panels of electrical
machines in MEP Building Construction works, Review the design and management the teams.
Monitoring of the execution team as Electrical Engineer for MEP & Plant Commissioning.
Prepare method of statements and ITPs in coordination for QC works.
Prepare daily QC reports regarding inspections, material and, Non conformances.
Prepare weekly surveillance reports, non conformance reports and verification of corrective actions.
Ensure the all works are carried out as per SEAS approved method.
Preparation of testing and commissioning method statements in coordination with Vendors, QA/QC
engineers and project engineers.
Installation of cable trays and conduits for lay out of power and control cables for EOT Cranes.
Inspection installation of HV/LV Cables & Cable Testing such as (Continuity Test & IR Test).
Coordination with consultant, client and project management for any kinds of issues.
Installation of Power/Aux. Transformers, MCC, MDBs, DBs, ATS, Synchronization Panels.
Executing work in a manner complaint with the project budget and schedule.
Monitor and manage troubleshooting and complains of the clients for switchgears.
Instruments, electrical wiring, telephone system as per drawing requirements.
Coordination with the consultant for RFI.
Prepare permits for different testing performs.
Line and loop verification for DCS, UPS, LV and MV Switchgears Panels.
HV (High Voltage) and LV (Low Voltage) Cables installation for MEP.
DC Batteries bank, UPS System Testing and installation in building.
Grounding systems Verifications and Installation building and power plant.
Power factor Corrector.
Installation of power and control cables in trunks and ducts.
Distribution panels, three phase wiring trunking and duckting.
Hoist Motor to panel cables connections verifications.
VSD BFP (Variable Speed D
To attend break downs induction melting furnaces of steel mills in all over Pakistan. Installation, of electrical transformers, furnaces, capacitor bank, earthing system, panels and commissioning of new installed furnaces plant.
Responsibilities:
Installation of panel, transformer, medium voltage switchgear, lightning protection systems.
Make resonance between furnace coil and capacitors bank.
Maintenance of furnaces; transformer solid-state panel and DC choke.
RO water plant pipe line leakage checking.
Prepares report of break down and commissioned plants.
Installation of electrical machines as per drawings.
Repairing of PCB for controlling panels.
Earthing system verification and installation.
Complete the steel mill according to requirements.
Transformer incoming and outgoing phase sequence check.
Synchronize the units according to head office approval.
Complete the project within the specifications and time.
To attend the installation and commissioning for produced electric machines for the partners industries.
Product standard check, review the design, testing reports, manage all working groups, team leading and
product construction review.
Installation of transformers and Motors for industrial purpose.
Make deals with the industrial clients for order and installation of required product.
Created industrial links for future deals.
Prepares report for installed and commissioned machines.
Installed the electrical machines as per drawings.
Grounding system verification for new machines installation.
Completed the installation within the specifications and time.
Complete the Electrical and Mechanical works according to project schedule and under budget.
Prepare technical reports according to daily and monthly work.
Different types test are performed inspection and verification.
Check the problems and corrects errors of every team.
Present product’s technical features for sales purpose.
Plan and prepare daily working schedules.
Continuity review of processes to determine if improvements.
Manage the work plans for team work.
Prepare work plans for team work.
Transformer’s construction inspection according to standards.
Preparation FAT reports and check test reports of tested transformers.
Review the manual of product correct the errors and make accurate.
Supervision of electrical equipments installation in commercial and residential buildings. Motor control circuits, Three phase and single phase power wiring.
Responsibilities:
Conduct work as per drawing wiring.
Check the wiring as drawing requirements.
Prepare maintenance schedule monthly and weakly.
Installation and connection of distribution, ATS and synchronization panels.
Conduit, casing caping, underground, surface and cable tray wiring.
Bus-bars, conductors, batteries and capacitor bank installation.
Team leading to control the members.
Star delta motor and DOL motor starters.