SUMMARY OF EXPERIENCEnn To ensure that Approved Construction Materials are using and Construction Procedures are Complying. n Site Routine, Surveillance Inspection Findings and Discrepancies, To Record in Project QC log Book. n Report to Project Manager, When the Quality of Workmanship does not meet the Project Standards. n Site QC Inspections, Observations, Violations, Comments and Report to Project Manager for the NCR.n Preparation of Weekly Inspections report, QC Log book Comments and Status to the project Manager.n Ability to Planning, Scheduling, Monitoring and Supervision of the Major Concrete Placement works.n Ability to foresee items requirement, and to ensure that items Timely Availability on Job Site. nIf required, To Take Affective appropriate Measures and Actions, To Expedite the Progress at Site.n Maintaining Records of Field Changes and Additional Work for Invoices and as Built Drawings.n To Review, Contractors Construction Methodology for The Field Adjustment / Rectification works.n Preparation of Punch List, Exception items list and Assist to project Manager for the Final Inspection.n Monitoring, Re-Inspection of Rectified Works, Closing of Log Book QC Comments and Remarks.n Checking, Comments and Verification of Field Adjustment, Field Changes, and As-Built Drawings.n Building Maintenance and Renovation works. To Assist the Implementation of Safety Procedures. n Ability to plan, execute and run large earth work, roads,retaining walls, pipe lines, and infrastructure works sub and super structures as QA/QC standards.
Reviewing of documents/Transmittals.
Issue proactive, general comments, violation, preparing focused assessment and follow up for closure after verifying at site.
Discuss VAF (Violation after Facts) and repeated violations with supervisors and further decide for issuing Company NCR.
Put repeated violation in PQI (Project Quality Index).
Preparing weekly report and weekly highlights.
Attend RFI as per contractor notification.
Daily surveillance of site.
Preparing MCC and then verify with PMT & contractor for closure in MPCS .
Preparing weekly outstanding issues.
Complete monthly E-learning courses.
Preparing monthly BSO reports (Behavior of Safety Organization) .
Inspection of pre-cast concrete elements in precast yard like pipe support foundation, pedestals, fence foundation, sign board.
Supervision of civil related activities according to drawing and specification.
Confirming that concrete works, reinforcement, shuttering work,mould oil, anchor bolts templates,projection,c/c distance, insert plates teplates,dimentions, finishing work, Nitocote are done as per approved drawing, specification, method of statement and design.
Witnessing the 3rd party tests.
Verifying contractor’s daily report and progress and reporting project coordinator.
Preparing daily flush report of going daily activities and weekly report and then reporting to project Coordinator.
Implementation of QA / QC Procedures and Methods.
Study of inspection and testing plans (ITPs) for various activities submitted by contractor.
To make sure strict implementation of HSE rules.
Study of method statements for various activities and supervising the implementation.
Update and maintain the log sheet for RFIs and NCRs.
Making sure that all the activities are going / implemented as per approved drawings and client specifications and reporting accordingly.
Scope of work is buildings including structure work & finishing work ,380
KV Trench, excavation and backfilling, ASL Tanks for Treated & Untreated
fuel, Solar Field Island, Dike Wall.
Managing all types of documentation concern to scope of work.
Updating RFIs tracker, NCR, working on dossier and CTO.
Issue site observation report & NCR/WDR.
Prepare weekly & monthly QA/QC report.
Surveillance of activities and inspect the area for final inspection as per approved ITP.
Study of method statements for various activities and supervising the implementation.
Supervision of civil related activities according to drawing and specification.
Confirming that Earth work, concrete works, reinforcement, shuttering work, finishing work, water proofing and epoxy paint are done as per drawing, specification and design.
Witnessing the 3rd party tests.
Verifying contractor’s daily report and progress and reporting project manager.
Implementation of QA / QC Procedures and Methods.
Check the slump, temperature and cubes filling for blind concrete and structural concrete.
Study of inspection and testing plans (ITPs) for various activities submitted by contractor.
To make sure strict implementation of HSE rules.
Study of method statements for various activities and supervising the implementation.
Update and maintain the log sheet for RFIs and NCRs.
Making sure that all the activities are going / implemented as per approved drawings and client specifications and reporting accordingly.
Reporting immediately of site technical issues to the Project Manager.
To ensuring that Construction Activities are carried- out as Per the Approved Project Inspection Test Plan (ITP’s)
Review of ITP, and Quality Control Inspection Procedures
Implementation of QA / QC Procedures and Methods
QC Site Inspections, Checking of Materials and Field Testing
To Log of Findings, Comments, and Reports for NCR
RFI Status, QC Comments, Highlight of week & Logbook Report
Final Inspection of Works and preparation of Punch List
Reviewing and Checking of As Built Drawings.
Reviewing material submittal before submittal for approval and making sure that these materials are per specification and project contract.
Preparing method statements for different activities and getting there approval.
Coordination with different suppliers and regarding different materials / Equipments certificates.
Attending meetings with client / consultants and sub-contractor regarding quality assurance and control.
Making sure that the equipments and materials are as per specification and drawings and calibrated.
Making visit of sub contractor including batching plants, 3rd party laborites and other manufacturing groups.
Preparing QA/QC Dossiers and handing over the projects as contract documents.
To coordinate with sub-contractors for designing, third party for testing, Concrete & Material suppliers, Client and Consultant.
Preparing Material submittals and coordinating for approval.
Preparing Reports on Area concerns and early warnings and Coordinating with Project Manager.
Pre-planning job quality plan and implementing as per specification and drawing.
Making sure that each and activity at site is going and per drawing & specification with proper documentation.
Coordinating with safety and making sure that all employees, Equipment and other property are safe.
Thinking always for improving myself in relative fields and other technologies.
Project consist of : villas structure work and
Performed all the inspections with Consultant for Structural and Architectural works.
To ensure that all the inspections and tests are carried out as indicated on the appropriate Inspection & Test Plan (ITP).
Assisting QA/QC Manager in preparation of Inspection test plans (I.T.P), hand over documents and other submittals.
To ensure that all inspections and tests are recorded on the appropriate forms or checklists as indicated on the relevant ITP.
To report any defective material or non-confirming activity to Site QA/QC Manager.
Closing of Non -conformance reports (NCR) and site instructions.
To comply with all valid safety instructions and current company standing instructions.
Preparation of Weekly and Monthly Progress Report.
To ensure that only approved material is used.
Checking and controlling the Quality of work and Material.
Coordination with consultant for the daily inspections including preparing and Submitting RFI, Clearing surveillances reports, daily reports.
To ensuring that Construction Activities are carried- out as Per the Approved Project Inspection Test Plan (ITP’s)
Review of ITP, and Quality Control Inspection Procedures
Implementation of QA / QC Procedures and Methods.
QC Site Inspections, Checking of Materials and Field Testing
To Log of Findings, Comments, and Reports for NCR
RFI Status, QC Comments, Highlight of week & Logbook Report
Final Inspection of Works and preparation of Punch List
Reviewing and Checking of As Built Drawings.
Reviewing material submittal before submittal for approval and making sure that these materials are per specification and project contract.
Preparing method statements for different activities and getting their approval.
Coordination with different suppliers and regarding different materials / Equipments certificates.
Attending meetings with client / consultants and sub-contractor regarding quality assurance and control.
Making sure that the equipments and materials are as per specification and drawings and calibrated.
Making visit of sub-contractor including batching plants, 3rd party laborites and other manufacturing groups.
Preparing QA/QC Dossiers and handing over the projects as contract documents.
To coordinate with sub-contractors for designing, third party for testing, Concrete & Material suppliers, Client and Consultant.
Preparing Material submittals and coordinating for approval.
Preparing Reports on Area concerns and early warnings and Coordinating with Project Manager.
Pre-planning job quality plan and implementing as per specification and drawing.
Making sure that each and activity at site is going and per drawing & specification with proper documentation.
Coordinating with safety and making sure that all employees, Equipment and other property are safe.
Conducting site survey ,collection of field initial information for the engineering grants like water supply, street pavements, link roads, culverts, small dames, side drains and flood protection walls as per project engineers instruction.
Implementation of the community grants as per drawing and given specification.
Close Coordanitation with project team throughout the planning design and implementation stages of the schemes.
Supervision and administrative duties related to the schemes with beneficiaries, along coordination with other members of the project and with staff of other organizations.
Monitoring and evaluate the relevant ongoing project activities in the field as project engineer instruction.
Conducting community members on job training regarding Operation & Maintenance, scope of work, implementation methodology, quality of work, documentation related to the schemes.
Monitoring of overall projects financial resources, material utilization and use of other organization assets according to the approved budget and donor guidelines.
Assisting project engineer in technical reports, proposal, BOQ, design and specification whenever required.
Reporting regularly to Project Engineer and to represent Organization into other NGOs, Agencies and Government Authorities where required.
Reporting immediately site social and technical issues to the project engineer.
Reporting the site amendments & variations as per community demand to the project engineer and getting on time approval.
Conducting site survey ,collection of field initial information for the engineering grants like water supply, street pavements, link roads, culverts, small dames, side drains and flood protection walls as per project engineers instruction.
Implementation of the community grants as per drawing and given specification.
Close Coordanitation with project team throughout the planning design and implementation stages of the schemes.
Supervision and administrative duties related to the schemes with beneficiaries, along coordination with other members of the project and with staff of other organizations.
Monitoring and evaluate the relevant ongoing project activities in the field as project engineer instruction.
Conducting community members on job training regarding Operation & Maintenance, scope of work, implementation methodology, quality of work, documentation related to the schemes.
Monitoring of overall projects financial resources, material utilization and use of other organization assets according to the approved budget and donor guidelines.
Assisting project engineer in technical reports, proposal, BOQ, design and specification whenever required.
Reporting regularly to Project Engineer and to represent Organization into other NGOs, Agencies and Government Authorities where required.
Reporting immediately site social and technical issues to the project engineer.
Reporting the site amendments & variations as per community demand to the project engineer and getting on time approval.