I started professional career in June 2009. I have nine years of experience. I have worked at Highways, Bridges, Thermal Plant, Gas Plant Facility, Infrastructure projects. Currently I am participating for renewable energy at Hydropower project which is included Powerhouse, Dam, separate Spillway, Intake, Tunnels, transmission line, access/diversion roads and bridges. I also have good understanding about FIDIC, NHA, WAPDA and SSGCL Specifications but limited to work.
Organize and guide the contractor & consultancy services for consistent output in addition to the tasks listed below as Quantity Surveyor;
Verification/preparation of measurements, Interim Payment Certificates (IPC/FPC), Milestones, Schedule of Price, Escalation, Bill of Quantity, EOT relevant cost and Method Statement etc
Undertaking cost analysis and verifying changes to costs
Monitoring budget of the project and assessment in project variation
Advising on the maintenance costs of specific construction work
Having good understanding about FIDIC (Red, Yellow, Silver), SSGCL, NHA and WAPDA specifications but limited to work
Organize and coordinate the overall activities in the project
Advising on procurement strategy
Facilitate and monitoring the consultant and contractor’s mobilization
Maintain complete records of site operation
Preparation of X–section & Long Section on Auto CAD
Survey works, layouts, calculation of super elevation & curves
Earth work embankment, cutting & filling, sub-base & ABC
Asphaltic base course and wearing course, TST, DST
Preparation of bar bending schedule & shop drawings
Calculate the quantities of all types of structure works
Supervision & monitoring during construction but limited
Writing extensive monthly, weekly & daily progress reports
https://www.linkedin.com/in/fahidusman
720 MW Karot Hydropower Project
Client: Karot Power Company Limited (KPCL)
EC Contract: Three Gorges Economy Development Company (TGDC)
P Contractor: China Machinery & Electric Company (CMEC).
EPC Cost: 1.28 Billion USD
The project is designed exclusively for power generation under Build Own Operate Transfer (BOOT) basis with a concession period of 30 years. It has an asphalt core rock-fill dam of 95.5 m height, 26700km2 catchment area, a separate spillway, intake structure, 3 diversion tunnels(12.5d), 4 power tunnels and a surface powerhouse(164.9x27x60.5m) containing 4x180MW Francis turbines with mean annual power generation of 3,206 million kW/h. Storage of Reservoir 1.52x108m3. Lenders of the project are China's Silk Road Fund, International Finance Corporation, The Export-Import Bank of China and China Development Bank. The EPC/Turnkey project. PPIB Project. Part of CPEC.
My responsibilities are verification of milestone, payments, project variation, escalation, cost claim, and other related contractual matter as per FIDIC Silver for EC and P Contractors
Name of Project: Golen Gol Hydropower Project
Project is funded by three donors OPEF Fund for International Development (OFID), Kuwait Fund for Arab Economic Development and Saudi fund for Development. The scheme designed for the generation of 108 MW consisting of three units in one phase. Public Sector Project.
My responsibilities are: Checking of IPC’s, Escalation, Rate analysis and VO for all Lots i.e. hydraulic structures, tunnel, road, bridges, Powerhouse, grid station, Switchyard, transmission line (132 & 220kV), electrical and mechanical work.
Name of Project: Construction Facility Works at DHA City Karachi (DCK)
Responsible for Three Projects. Preparation of IPCs and prepare bill for Sub-Contractors. Bar Bending Schedule. Calculate the quantities of road cut & fill sub-base, WBM, base course, asphaltic work, electrical, water supply sewerage, drainage System etc and DHA building work
Name of Project: Construction of Flyover at Takht Bhai on N-45
Preparation of Interim Payment Certificate, Bar Bending schedule, Shop drawing, dealing with client and EA consultant according to work and extension of Flyover 225m to 425m (25x17) revision of B.O.Q, realignment of Flyover and prepare complete drawing for extended portion with coordinates. 84 piles 153 girders. To Controls contractor’s price value.
Name of Project: POGC Rehman EWT (Extended Well Test) Plant Facility.
Project: POGC Rehman EWT (Extended Well Test) Plant Facility.
EPC Contractor: Project Support Services Asia (Pvt) Ltd.
Client: Polish Oil and Gas Company Pakistan.
This facility is handling 15 MMscfd of Raw Gas, about 10 BPD of condensate and 200 BPD of produced water on EPCC basis according to specifications of Sui Southern Gas Company Limited (SSGCL). PGNiG Partner JV with Pakistan Petroleum Limited (PPL). MYCO Engineers was Sub-Contractor with EPC PSS. My responsibilities were; preparation of IPC, rate analysis, shop drawings, B.B.S and weakly & monthly work schedules. Calculation of quantities like as pad strip foundations, evaporation pond, condensate storage, firefighting system, gathering manifold, metering skid, air compressors, inlet, discharge piping, cutting & Filling of plot areas included Residence. PGNiG on 25th June 2013 has commenced gas production from Rehman reservoir block # 2667-7.
Name of Project: 747 MW (Gross) Combined Cycle Power Plant.
EPC Contractor: Harbin Electric International Company Ltd.
AKS was Sub-Contractor with China Company (HEI). Preparation of Interim Payment Certificate, Shop Drawings, Bar Bending & Work Schedules etc and getting approval from Chinese Engineer. Bills for Sub-Contractors, Calculation of quantities of RCC work like as Cooling Tower, Pump House A, Pump House B, Intake & Open Channel, Mini Coffer Dame, Chlorination Building, C.W Pipe Line RCC pipe line syphon well, Drainage & Discharge Culvert for Thermal Power Plant. Supervision of site work included Management of Project activities & Contractor’s invoices. EPC Project.
Name of Project: Kach-Shahrag-Harnai Road Project ICB-07
Responsible for Checking of Interim Payment Certificate, Escalation Payment Certificate, Shop Drawings and Bar Bending for Three Bridges , 269 culverts 12 causeway 84 retaining walls and other protection & drainage work. Due to shortage of consultancy staff at site I was also responsible for supervision of survey and quality work Calculate Quantity of Earth Works, Structural works. Variation Order at the project and Prepare the Monthly Progress Report. Record maintain and File Keeping. Road Length 93 KM
Name of Project: Sanjawi-Dukki Road Project ICB-09
Preparation of Interim Payment Certificate. Prepare the Bills for Sub Contractor. Plotting the X-Section. Preparation of Variation order. Preparation of Bar Bending Schedule & Shop Drawing for four bridges, culverts and syphonwell. Inspection of site work including checking of Steel and Layout as per drawings. Dealing with client according to the work. 29 KM Road, 123 Numbers of Culverts and Four Bridges. Project was funded by ADB under the BRDSP (Balochistan Road Development Sector Project)
Name of Project: Sanjawi-Dukki Road Project ICB-09
Checking of Interim Payment Certificates. Checking of Road X-Section. Checking of Different Bar Bending Schedules. Checking of different Structure works. Preparation Monthly Progress Report.
Worked with Contractor (Rakhshani Builders (pvt) Ltd) (Without pay) at the same duration and calculate the super elevation, curves, making the level sheets and complete survey work with contractor’s survey staff and plotting the X-section, shop drawing (Auto CAD) and bar bending schedule with contractor’s QS.