Throughout more than Five-year experience. I have 5-year experience in Gulf country as an Assistant Electrical Engineer. Supervision and installation of new LV wiring, MDB, SMDB, FDB dressing as per ADDC, DEWA and FEWA rules and regulations and participated in different site of maintenance works. And update the log sheet submitted to site Engineer and PM. Weekly meeting brief to my management.
I have the Diploma of Associate Engineer Electrical Approved from ADDC and have excellent academic record. I have developed creative thinking, leadership qualities and ability to express my ideas and thoughts most effectively.
Successfully completed Installation, Testing and Commissioning of
Electrical 7.8MW, 7400rpm condensate extraction Steam Turbine.
Installation, Testing and Commissioning of Woodward 505 Governor based Turbine control Panel along with all turbine protections and Auxiliaries control.
Installation, Testing and Commissioning of 7.8MW 6.6KV, Generator along with Generator dual Excitation system, and configuration of Synchronization and Protection Controller AGC- 4.
Installation, Testing and Commissioning of 6.6KV to 4l5Volts Step down substation, including 2x1.5MVA, 2x2MVA, 1x3.5MVA Transformers and plant auxiliaries.
Installation, Testing and Commissioning of 6.6KV Switchgear panels with protection schemes, LV Synchronization panels, MCC Panels, VFD Panels, PLC Panels and 120 VDC Bank Panel.
Installation of cable trays, Lighting DBs, Earth System and MV, LV and control cables Laying and Cables Termination of Motors, Field Instruments and Panels side. Installation, testing and commissioning of Siemens PLC 57-300, SCADA Wincc software Based Engineering and Operator Systems along with all Control Loops Check.
Installation, Testing and Commissioning of Air Compressors, Cooling Towers and RO Plant Electrical System.