概要

To secure a position in a facility where I can contribute my potentials, increase my professional's experience and deepen my commitment of providing of quality services.

项目

132kv/11kv Grid project

工作经历

公司标识
Electrical Supervisor
AYK PVT LTD
Apr 2016 - Sep 2017 | Gujranwala, Pakistan

Worked in Ayk pvt ltd in maintenance department
Key responsibilities is
Sites visits and inspection
Reports of work
Good interpersonal skills
Power work
Battery charger and battery bank work
UPS
Designing and planning
Team leader
AC sequence controller panel
Hands on experience

公司标识
Sr. Electrical Technician
E2E Enterprises
Dec 2015 - Mar 2017 | Muridkay, Pakistan

Worked on LV panel, Installation, testing, and maintenance.
Commissioning on steam turbine as under process.
Worked on Preparation plant panel, HP Boiler panel, Solvent Extractor plant panel, De Oil Bran panel, RO Plant panel, Compressor plant, Ash handling panel, Fuel handling panel, De waxing and De-gumming panel, firefighting panel, battery charger panel, turbine control panel and Tank farm area panel. Worked on VFD.
Testing a motor, contactor and starter, Cable insulation test with megger.
Worked on MS office note down the data of all electrical equipment’s in soft and hard farm, send a daily activity report to manager.
Repairing and maintenance of all electrical equipment.
Ability to read the follow the Technical Manuals, Operating Instruction and Drawings.
Good interpersonal Skills.

公司标识
Electrical Supervisor/ Site Engineer
Sahi Construction
Jul 2013 - Aug 2015 | Islamabad, Pakistan

• Wiring, Maintenance, Installation and Repairing of Circuit like as, CCTV, Public Address System, Fire Alarm, Internet, Telephone, UPS and Lights about the diagram.
• Testing and Inspection of Circuits.
• Inspects Electrical Installations / Equipment’s and reports the condition to the manager.
• Inspects spare parts and materials from the suppliers to ensure compliance with the specifications before accepting in Store..
• Monthly budget and Cost review.
• Evaluation of Planning & Scheduling of the Project.
• Follow up with Design and Drawings.
• Inspects the site to check the quality and performance of work carried out and certifies spare parts and materials consumption.

公司标识
Electrical Technician
Alstom Grid Pakistan (Pvt) Ltd.
Jun 2012 - Jul 2013 | Rawalpindi, Pakistan

Erection, Commissioning and Installation of 40 MVA Power transformer, 1600 A SF6 Circuit Breaker, 132 kv Current Transformer, 132 kv Potential transformer, 3 pole 145 kv Bus and Line disconnecting switch, 11 kv capacitor bank 7.5 MVAR capacity, Pad mounted auxiliary transformer 200 kva, 132 kv beam structure and 132 kv gantry and earth mast tower.
Installed Indoor equipment panel termination is 2500A incoming panel, 630A outgoing panel, 2500A Bus couple panel, 630A Capacitor outgoing panel, 110V battery bank, 110V-5A Battery charger, AC and DC panel, Control panel, Relay panel and Event and fault recorder panel.
Termination and testing. Ability to read single line and circuit diagram.
Follow up with design and drawings.
Termination of control wiring with glands and lugs as per specify of cable size.

学历

Preston University
学士, 技术学士, Bachelors of Technology in Electrical‎
Electric Power and Control System, Electrical Power
等级 B+
2014
Punjab Board of Technical Education Lahore
中级/A级, , Intermediate, DIPLOMA OF ASSOCIATE ENGINEER‎
Electrical
2011

技能

中级 Abobe Pro
熟练 Circuit Diagram
熟练 E Mail
熟练 Handling Assignments
熟练 MIT Knowledge
熟练 Planning / Design
熟练 Reporting Writing
熟练 RESTful APIs
熟练 Troubleshooting
熟练 Typing
熟练 Web Browsing
熟练 Wiring

语言

熟练 乌尔都语
中级 英语