Working experience as Electrical supervisor with the following job responsibilities- Making DB/LT Panels, Engine Control Panels, ATS Panels, PFI Panels, Motor Starter panels.Engine Coupling, wiring, Skid Fitting and Canopy fitting.Load Testing, Rectify mentioned points by QC.Installation Testing, Commissioning of Generators and Panels.Engine UsePerkin Engine (upto 500KVA)Lister Petter Engine (upto 200KVA)YDO Engine (upto 30KVA)Lovol Engine (upto 100KVA)Quanchai Engine (Upto 30KVA)Grupel Generators ( upto 500KVA )Alternator UseLeroy Somer AleternatorLido AlternatorSinocox AlternatorMecalte AlternatorStamford AlternatorEngga AlternatorModule UseDeepSea Module (4510, 4520, 6020, 6120, 7320)Smartgen Module (HGM420)DataCom Module (DKG105)Projects Done Installation of Karcher Bus Washing Plant (TB42).Railing FittingGantry BuildingBrush FittingPanels on Gantry installationWater Recirculation Pump(WRP) installationPLC Cabinets installationChases Wash installationComplete Cabling, Piping.
Working experience as Electrical Technician with the following job responsibilities- Maintenance & Installation of LT panelsMaintenance & Repairing of ATS panels Load distribution, load calculation in domestic wiring Installation & maintenance of 3-phase DPs.
Working experience as Electrical Technician and carried following jobsMaintenance of electrical distribution board and panelsMaintenance and diagnostics of ATS panels Making of electrical panels and switchgears Preventive maintenance and diagnostics of electrical system
Philip Morris (Pakistan) limited an affiliate of Philip Morris International Inc. The principal activity of Philip Morris (Pakistan) Limited is the manufacture and sale of cigarettes for Pakistan's domestic market.Worked as Trainee Electrical Technician. Following job has been carriedChecking and termination of induction motorsDiagnostics of electrical circuits and wiring at plant site Preventive maintenance of electrical equipment at plant site
Transformer Winding Job includes the removal of burnt winding, preparation of coil for winding, size selection of wires, arrangement & termination of coils & finally testing of transformer Single/Three Phase Induction Motor Winding Rewinded the 30kw Siemens induction motor installed in Paper factory. Job includes the removal of burnt winding, preparation of coil sets for winding, size selection of wires, arrangement & termination of coils & insulation wedges in coils & finally testing of motorElectrification of Building Job includes the preparation of drawing for three phase & single phase DB and circuits, wiring sizing, Bus bar arrangement & installation of breaker & channel in DB, termination & testing of circuits.