seeking opportunity to blend theoretical information with the practical experience so that I can better understand the domain knowledge acquiring presently and also to plan effectively my career and enhance my professional skills for optimizing my work related prospects.
I was being developed in the inspection department and assigned the tasks with the inspection team to have casing vibrations, thermography, and NDT tests.
• Inspected the casing vibrations of fly ash compressors, column mills (limestone), column mill (coal), loop-seal compressor, secondary fans of CFB-1 and CFB-2 boilers, induced draft fans, oil pumps, gear box and generators bearings of GE STG-1, STG-2, STG-3.
• Inspected the thermography of main grid station and electrical panels.
• Inspected the thickness test of coal buster A and B of CFB-1 boiler.
• Check the temperature of insulation of boiler through laser.
• Inspect the pressure safety valves (PSVs) car sealing of GE STGs 1, 2, 3 and 4.
• Present the brief report on pressure vessels inspection code as per API 510 and was made aware of API-570, API-563 and ASME standards.