A determined Chemical Engineer who is looking for an position where I can use my skills & abilities to my organization. Reliable and highly motivated to get into the desired environment with new challenges.
Planning & Development (Transmission)
Assist in the development and implementation of project plans.
Conduct research and gather data to support planning activities.
Analyze project requirements and prepare project proposals.
Bids evaluation by analyzing the technical aspects to ensure compliance with project requirements
Coordinate project activities and ensure timelines are met.
Conduct audits to ensure compliance with standards.
Collaborate with cross-functional teams to achieve project goals.
Prepare reports and presentations for project stakeholders.
Learn and apply engineering principles and techniques to project planning and development activities.
Research & Development:
Increased SRFT to 90% by resolving discrepancies in the processing division by working with McKinsey & Company.
Tested revised recipes on a pilot scale, analyzed the findings to achieve desired product quality, and implemented them.
Production (Cold Pad Batch Dyeing):
Ensured completion of daily production targets and maintained 6s on the production floor.
Resolved any non-conformity faced against the planned production of fabric in the shape of quality.
Provided technical support to the Operations group for daily monitoring of plant KPIs.
Reported on Daily progress, Consumption, Dispatch, and Stock.
Performed post-shift production on SAP as an SAP expert.
Analyzed log sheets for operators, identifying areas for improvement and providing targeted feedback; resulting in a 30% increase in compliance with information accuracy standards.
Examined the performance of process equipment and ensured its proper maintenance.
Certified enough manufacturing materials and supplies are retrieved from the stores at the appropriate time.
Coordinated with Shift Chemist to find the in-process non-conformances. Checked the lab results of the product and instructed the operators accordingly.
Monitored wastewater disposal as per the NEQs Standards.
Minimized steam consumption by optimizing the process parameters.
Corroborated Safe Work Procedures and issued work permits to the contractor and associated departments.
Acquired knowledge of cement unit processes and operations, as well as the use of additives for different types of cement.
Analyzed power and energy needs, and explored co-generation possibilities using stream energies.
Witnessed maintenance procedures conducted during shutdown periods.
Aided the Production Manager to complete the production tasks within the deadline.
Conducted Data acquisition and Costing for Enterprise resource planning, estimated the cost of two top-selling products, and increased the ROI by 40%.
Supported the Sales Engineer as an application engineer
Developed skills like Leadership, Blog writing, entrepreneurship, Freelancing, and Public speaking.
Conducted the Tree Plantation and clothes collection for poor and deserved families with Akhuwat Foundation, Outreached FRP Engineers’ CEO and got an industrial visit and also got offered an internship, led three days Government School Kids workshop for their soft skill development and career counseling, grossed 60% Profit via Crowd sale, Kick start two mock business project as an entrepreneur.
Assisted in the development of new denim washing samples based on design specifications.
Conducted research on the chemical reactions in denim washing processes, including enzyme wash, stone wash, and bleach wash
Operated front loader and barrel machines for denim washing, ensuring proper loading and unloading of garments.
Collaborated with team members to optimize washing processes and achieve production targets.