概要

 Thirteen (13) years of progressive experience spread over the disciplines of Construction, Operation & Maintenance and Testing of 11KV, 33KV, 66KV, 132KV, 220KV & 500KV Grid Station, Transmission Line & electrical power equipment in renowned public ( NTDCL/WAPDA) and private sector organizations.
 Expertising in supervising personnel, conducting reviews, establishing schedules, maintaining budgets, and creating contingency plans.
 Excellent communication and interpersonal skills and be capable of interacting with other engineering disciplines, managers, vendors and clients.
 Good planning and organization skills, including the ability to juggle priorities and meet tight deadlines.
 Fluent in written and oral English

项目

560 MW Combined Cycle Power Plant Bin Qasim, Karachi.
PEL Unit-02

工作经历

公司标识
CEO
VOLTECH
Apr 2017 - 代表 | Lahore, Pakistan

 Controls the direction of the company
 Decides budgets for all departments
 Targets and initiates business partnerships with other companies
 Drives the culture of the business
 Employment and ensures there are enough staff (and the right people)
 Manages senior managers
 Generates new business and gives approval of new projects
 Responsible for day-to-day decisions
 Identifies risks and ensures appropriate strategies are in place
 Ensures the correct practices are being met
 Drives profitability of the business

公司标识
Assistant Director
Water and Power Development Authority (WAPDA)/NTDCL
Mar 2012 - Apr 2017 | Lahore, Pakistan

Testing of Substation equipment i.e. 500 KV, 220KV & 132 KV Reactors, Circuit Breakers, CT & PT, Capacitor Circuit Breakers, Incoming & Outgoing Panels etc.
Technical Evaluation of Tenders of Grid Stations & Transmission Lines up to 500 KV.
Prequalification/Registration of Construction Contractor for Construction of 11 KV Lines and Local Distribution System/Village Electrification Works.
Supervised designing and preparation of drawings for electrification of Control Buildings at Grid Stations and WAPDA Colonies at DAMs.
Installation, Testing & Commissioning of 500 KV Grid Station Dera Ghazi Khan.
Installation, Testing & Commissioning of 220 KV Burhan Grid Station.
Installation, Testing & Commissioning of 500 KV Transmission Line form Dera Ghazi Khan to Loralai.
Testing & commissioning of 132KV, 220KV & 500 KV Grid Stations Equipment like CT, PT & CB.
Annual Dependable Capacity Test of IPPs.

公司标识
Project Engineer (E & I)
Harbin Electric Corporation HE
Oct 2011 - Mar 2012 | Karachi, Pakistan

 Installation, Testing & Commission of 220 KV, GIS, Grid Station.
 Installation, Testing & Commissioning of 220 KV Transmission Line.

公司标识
Project Engineer/Electrical Maintenance Engineer
Pak Elektron Limited (PEL) Lahore
Apr 2009 - Sep 2011 | Lahore, Pakistan

 Coordinator for sanction of 5 MW load from LESCO and supervise Installation, Testing and Commissioning of 11 KV Transmission Line from Lalyani Grid Station to PEL Unit-02.
 Installation, Testing, Commissioning and Maintenance of Substation, HT & LT Panels, DBs, 11KV/0.4KV Distribution Transformers and Power Generators.
 Installation, Commissioning and Maintenance of different sizes PVC Cables.
 Electrical Wiring and Electrical Fixtures installation, Fire Alarm System, Public Address System, Lightning Protection, Earthing System, External Power Supply and Lighting System and HVAC System.
 Provide field support for work execution of critical equipments including reviewing contractors' quotations, drawings & regular reports, assessing their performance and providing advice as necessary.
 Take part in the coordination meetings with Operations for the follow up of critical activities of project and equipments.
 Provide specialized technical support, troubleshooting and failure analysis of all instrumentation, plant Analyzers, Fire & Gas and associated control systems.
 Review Preventive Maintenance strategy, PM plans, and spare parts availability to improve the plant reliability.
 Reviewing requirements for plant shutdown and prepares consolidated work lists for shutdown as well as preliminary estimates of manpower and material.
 Complying with all safety norms and regulations of working by ensuring implementation of Quality Management System (ISO 9001:2008), Environment & HSE Management Systems (ISO 14001:2004 & OHSAS 18001:2007).

公司标识
Electrical Maintenance Engineer
Dewan Farooque Spinning Mills
Jun 2007 - Mar 2009 | Lahore, Pakistan

 Installation, Pre-Commissioning and Commissioning tests of Alternators, Induction Motors, Power Generators and Distribution Transformers at 3 MW Power Plant.
 Installation, Commissioning, Supervised Operation, Repairs and Maintenance of Plant Services Machineries, Distribution Transformers, Circuit Breakers, CTs & PTs, Diesel Generators and Ensure Assets & Equipment are in Continuous Proper Condition at all Times.
 Check vendor supplied drawings and/or information and coordinate transfer into project drawings.
 Checkout vendor provided equipment at vendor site and/or jobsite and field pre-commissioning and start-up support
 Responsible to maintain HSE of my team of Supervisors and Workers and Encourage the Safe work environment.

学历

University of South Asia
硕士, 科学硕士学位, ‎
Electrical Power
CGPA 3.6/4
2015
Mehran University of Engineering & Technology
学士, , Bachelors of Engineering‎
Electrical Machines, Industrial Electronics, Power Engineering
2007

技能

熟练 Cooordination Skills
熟练 EPC
熟练 Execution Management Systems

语言

熟练 英语