I have 7 years professional experience in Electrical installation,maintenance, testing and commissioning, control system.
I have more than 2 years of work experience in saudi arabia for the erection and energization of 115/13.8KV power substaion.
I have wast knowledge of Building wiring and designing.
I also have experience in BTS and mircowave installations as wireless technician.
Scheduled Maintenance on PTCL BTS sites located at wah cantt.
Installation and callibrations of control system, PLC, VFD, Drives, gauges, relays.
1. M.V Cable Termination 35 to 630mm2 cable in switch gear, outdoor 67MVA Power Transformer,500KVA service transformer, Stand by Generators 6.6Kv.
2. L.V Cable Termination in PNL, outdoor, Isolators, CT’S AND PT’S.
3. Grounding work with Conductor and Strip Code Weld, Clump within mash.
4. Assembling and installation control panels, Connections and wiring of AC and DC lights, Conduting of PVC and GI pipes for wiring circuits.
5. Installation of cable tray for MV cables for switchgear, control system and GIS. Installation of stands for HV cables.
6. Literary knowledge of testing and commissioning of relays, MCB’s, MCCB’s, RCCB’s, grounding mash and copper rod for grounding.
7.Assists the commissioning team in High Pot testing of GIS, Transformers, Incoming and Outgoing feeders.
8. Experience of installation and testing of 130 V battery bank and battery charger.
9.Check and maintain all Electrical works in Plant like Generators, Motors, Control Panels, Circuit Breakers, Timers, Relays, Fuses, Auto Sensors.
Plan and layout installation of conduit, control panels, fixtures, and other electrical equipment based on job specifications.
Assisted the testing engineer for loop checks, functional testing and required documentation.
Assist in the purchase of materials and daily used equipment.
Performed other assigned tasks with full responsibility.