概要

Long-standing, proven experience across mechanical applications and corporate management. Thorough understanding of maintenance aspects and safety standards. Dedicated to and actively involved in corporate vision and operations. Extensive technical hands-on experience and know-how with workforce management and collaborative abilities. Earned reputation as a hard charging leader with distinctive ability to train and lead efficient, goal-focused teams. Invited to serve on numerous corporate improvement committees and completed various workshops covering communication, chemical handling (AAA Corporation), and safety.


o Equipment & Tooling                     o Manufacturing Processes             o Cost Analysis & Budgeting


o Training & Development               o Die Building & Repair                     o Critical Issue Resolution


o Quality Control                o Vendor Communications              o Maintenance Planning


o Project Management                     o Planning & Improvement              o Regulatory Compliance

项目

1.5 MEGA WATT SOLAR SYSTEM
CAT G - 3520 E NEW SERIES DESIGN AT 50 DEGREE CENTIGRADE
CAT GAS ENGINE NEW SERIES DESIGN AT 50 CENTIGRADE AMBIENT G - 3520 E
NEW GAS ENGINE JENBACHER MODEL JGS - 420 (B311)
300 U.S.R.T L.G MODEL WC2H034 HOT WATER ABSORPTION CHILLER

工作经历

公司标识
CHIEF ENGINEER CAPTIVE POWER PLANT
LIBERTY MILLS LIMITED S.I.T.E KARACHI.
Oct 2011 - 代表 | Karachi, Pakistan

Responsible for all activities related to 4EK Series G - 3516 A, G - 3516 B, G - 3516 C & newly installed G – 3520 E Dry Manifolds and New Jenbacher JGS – 420 (B311). Caterpillar Gas Engine Co - Generation Captive Power Plant.
§  CAT G -3516 A (4 EK)965 K.W X 1 = 0.965 M.W        
§  CAT G -3516 A (CSZ) 1005 K.W X 1 = 1.005 M.W
§  JANBACHER JGS – 420(B311) 1500 K.W = 1.500 M.W (NEWLY INSTALLED)
§  CAT G – 3516 C (GZZ) 1450 K.W X 1 = 1.45 M.W 
§  CAT G – 3520 E (GZE) 2022 K.W X 2 = 4.044 M.W
§  PLANT CAPACITY = 8.964 M.W
§  D – 3512 (24 Z) 1005 K.W X 2 CAT DIESEL = 2.010M.W STAND BY DIESEL GENERATORS.
§  1.3 M.W SOLAR POWER INSTALLED RECENTLY (REON ENERGY PROJECT).
§  Co-Generation Installation and erection work. 1.85 Tons D.D.F.C DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler.
§  2.26 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler. Installation 3.00 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler and erection with all auxiliaries, equipment, and controllers. On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # LWM - 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. 300 U.S.R.T L.G Model WC2H – 034 hot water absorption chiller installed.
§  Planed all Required Top –End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals.
§  Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing.
§  Maintaining spare parts, Gas and Diesel Engine Fuel Oil, Engines Lube Oil Stock and Inventory with consumable parts and all required local purchase.
§  Responsible for all Power Generation, Steam Generation, Raw Water-Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff in House Training.
§  Submitted all correspondence reports and emails discussed b / w Higher Management and C.E.O and maintain its record properly.
§  Timely Checked Energy Saving Activities in all required areas of Production, Planning, and Maintenance and arrange a meeting to achieve all targets for saving Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy-saving Issues.

公司标识
MANAGER POWER HOUSE & UTILITY
Yunus Textile Mills Landhi Karachi
May 2008 - Sep 2011 | Karachi, Pakistan

As Manager Captive Power House and Utility look after all activities of 4EK Series G – 3516 A –CSZ SERIES Dry Manifolds. Caterpillar Gas Engine Co - Generation Captive Power Plant Capacity.
o 965 K.W X 2= 1.930 M.W o 1005 K.W X 1 = 1M.W o 1005 K.W X 1 = 1 M.W o 965 K.W X 3 = 2.895 M.W
o PLANT CAPACITY = 6.825 M.W
Co – Generation Installation and erection work.
1.85 X 3 = 5.55 Tons D.D.F.C Duplex Type Exhaust Fired Waste Heat Recovery Boiler. 1.1 Ton D.D.F.C Simplex Type Exhaust Fired Waste Heat Recovery Boilers. 5 Tons D.D.F.C Gas fire Boiler. ZR 300 series Atlas Copco oil free screw compressor 6 NOs unit Installation and maintenance H.P & L.P elements replacement work carried out.
Responsible for all operation and Maintenance activities of Utility Plant with all auxiliaries’ equipment and controllers.
Installed 250 U.S.R.T L.G Single Effect Steam Fired Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals.
Planed all Required Top - End Overhauling and In Frame over Hauling and Major Overhauling as per O.E.M Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing required in all related systems and engines, chillers, Boilers, compressors. Maintain spare Parts, Gas Engine Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water-Cooling Water Hot Water, ZR 300 Series Atlas Copco oil free screw Compressors Daily and Weekly Chemical Dozing Report checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Timely submitted all Power Generation, Steam Generation reports to Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, Air Leakages Inverters efficiency and day time energy saving Issues.

公司标识
CHIEF ENGINEER
LIBERTY MILLS LIMITED S.IT..E KARACHI
Oct 2000 - May 2008 | Karachi, Pakistan

As Chief Engineer looks after all activities of 4EK Series G - 3516 A, G - 3516 B, G - 3516 C Dry Manifolds. Caterpillar Gas Engine Co-Generation Captive Power Plant
Installation and erection work.
1.85 Tons D.D.F.C Exhaust Fired Waste Heat Recovery Boiler.
1.1 TON X 2 = 2.2 Tons Gresham Eastern Exhaust Fired Waste Heat Recovery Boilers.
Installation and erection with all auxiliaries’ equipment and controllers. On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # LWM - 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. Planed all Required Top - End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare parts, Gas Engine Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water-Cooling Water Hot Water Daily, and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills, and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and emails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning, and Maintenance and arrange a meeting to achieve all targets for saving Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy-saving Issues.

公司标识
ERECTION ENGINEER
SIDDIQ SONS TEXTILE PROCESS MILLS S.I.T.E KARACHI
Oct 1999 - Apr 2000 | Karachi, Pakistan

Carried Out 4EK Series Wet Mani Fold Caterpillar Gas Engines Installation and erection work. Installed Jacket Water Heat Recovery and Exhaust Heat Recovery System. In Jacket Water Heat Recovery Installed Plate Type GEA Heat Exchanger and Motorize Control Actuator Valve with Barber Column Module 8000 attachments

公司标识
DEPUTY MANAGER POWER HOUSE
SAPPHIRE TEXTILE MILLS UNIT # 2 S.I.T.E KOTRI
Nov 1996 - Mar 1999 | Kotri, Pakistan

Manage 4EK Series Wet Manifold Caterpillar Gas Engines. Perform 3RC Series 625 K.W Caterpillar Gas Engine Installation and Erection with Power panel and Control Panel Installation work. Manage Power Plant Operation and all Maintenance work. Plan Schedule Maintenance as per O.E.M Intervals. Carry out Fault finding and rectification work perform and perform all Predictive Maintenance in time. Planed Top - End Overhauling and Major Over Hauling as per O.E.M Time frame S.M.U. Manage all required purchasing as per power plant demand and requirement. Maintain inventory records. Negotiate with Fabricators and vendors for outdoor maintenance and repairing work. Arrange all required Parts and Auxiliaries in stock inventory.

公司标识
SHIFT INCHARGE
LUCKY ENERGY PRIVATE LIMITED F.B AREA KARACHI
Mar 1994 - Oct 1996 | Karachi, Pakistan

All Gas Engine Erection on given Pads or Foundation with proper Isolators balancing and fixed all Attachments like Exhaust Mufflers Power and Control Panels cabling and erection work with All Auxiliaries equipment Cooling Towers, Water Softening Plant, Engine Lubricating Oil Storage and Supply System, K&SB Raw Water Circulating Pumps, Siemens H.T Transformer and Johnson's and Philips Oil Circuit Breakers Trolleys Switchgear Installation and distribution work perform With all safety measures.

公司标识
ASSISTANT ENGINEER
REGENT TEXTILE MILLS LIMITED S.I.T.E KARACHI
Oct 1990 - Jan 1994 | Karachi, Pakistan

§  3RC Series Caterpillar Gas Engines 625 K.W X 3 = 1.950 M.W Captive     Power
§  Plant Operation and Maintenance work carried out.
§  Carry out all Schedule maintenance and predictive maintenance.
§  Carry out Top - End Overhauling of Caterpillar 3RC Series Gas engines.
§  Carry out In Frame Maintenance Overhaul.
§  Carry out Major Overhauling.

学历

Mehran University of Engineering & Technology
学士, 理工学士, B'TECH PASS MECHANICAL‎
Mechanical Engineering
CGPA 2.5/4
2001
GOVERNMENT COLLEGE OF TECHNOLOGY S.I.T.E KARACHI
大专, DIPLOMA OFASSOCIATE ENGINEER‎
Power Technology
Completed
1989

技能

熟练 BSc in Electrical / Electronics /Mechanical
熟练 CONFLICT MANAGEMNT
熟练 GAS AND DIESEL ENGINE INSTALLATION
熟练 H.T AND L.T TRANSFORMER INSTALLATION AND
熟练 HOT WATER CHILLER MAINTENANCE
熟练 HOT WATER CHILLER OPERATION
熟练 HOT WATER DRIVEN CHILLER INSTALLATION.
熟练 Negotiations
熟练 Power plant operation
熟练 PREVENTIVE & PREDICTIVE MAINTENANCE
熟练 Record Keeping
熟练 Root Cause Analysis
熟练 Team Building
熟练 WASTE HEAT RECOVERY BOILER INSTALLATION

语言

中级 英语
熟练 乌尔都语
中级 旁遮普语