Orange Line Metro Rail Transit System (OLMRTS)
Assistant Engineer Track June 2020- Present
• Maintaining Track Fitness to provide Train Driving Safety.
• Maintenance of Turnouts during Joint Commissioning with Signal professionals. •
Adjustment of Track height, Direction Versine corrections dialing of Curves. • Analyzing of Faults & Defects under supervision of Track Engineer. •
Supervise track maintenance team on site to rectify defects. •
Conducted Trainings on Technical Knowledge & Employee Safety Education
. • Participated in Drills as commander, Straight & Switch Rail replacement Tests & stood First in position.
• Managed the Track store at Depot, supply material according to the demands of each group.
• Distribution of PPE’s monthly basis to all track department.
Pakistan Railway Freight Transportation Company(PRFTC)
September2018-2020
Assistant Executive Engineer BS-17
Inspection & Maintenance of Track .Optimization of utilization of Railway track material. Review complex Track issues and support or obtain expert support to rectify defects . Produce the weekly and monthly progress reports . Provide technical guidance and supervision to the Maintenance Track Team
Pakistan Industrial Technical Assistance Center (PITAC)
Ministry of Industries and Production
Civil Engineer BS-17
September 2018- September 2019
Monitors construction costs, government regulations at different stages of each project
Assisting Senior Engineers and Project Managers in the design and development of site plans and infrastructure projects specifications and estimates.
Coordination of project assignments with other engineers and technicians, reviewed drawings supplied by vendors, clients, and architects to recommend necessary changes and keep projects moving forward.
Revamping of Head Quarter Building
Establishment of Entrepreneurship Training And Development Department
Submits permit applications to local, state, and federal agencies, verifying that projects comply with applicable regulations
Formulates accurate cost estimates for materials, equipment, or labor to determine a project's economic feasibility
Railway Estate Development And Marketing Company (REDAMCO)
Subsidiary of Ministry of Railways
Assistant Executive Engineer BS-17
September 2017 September 2018
Commercialization and Leasing of Railways Land Across all over Province Punjab.
Repair Maintenance of Railways infrastructure in different cities.
Leasing of Commercial Market In Mughalpura Lahore.
Supervision of Security, Maintenance Janitorial teams at Newly built Okara Railway Station
Railway Construction Pakistan (RAILCOP)
Subsidiary of Ministry of Railways
Assistant Executive Engineer BS-17
September 2015 September 2017
Analyzed of long range plans, survey reports, maps, and other data to effectively plan and design private and public infrastructure projects that meet or exceed client expectations
Constructed Heavy Repair Shop for Diesel Locomotives Lahore.
Rehabilitation of Mughalpura Dry Port.
Construction of Ware
• Maintaining Track Fitness to provide Train Driving Safety. • Maintenance of Turnouts during Joint Commissioning with Signal professionals. • Adjustment of Track height, Direction Versine corrections dialing of Curves. • Analyzing of Faults & Defects under supervision of Track Engineer. • Supervise track maintenance team on site to rectify defects. • Conducted Trainings on Technical Knowledge & Employee Safety Education. • Participated in Drills as commander, Straight & Switch Rail replacement Tests & stood First in position. • Managed the Track store at Depot, supply material according to the demands of each group. • Distribution of PPE’s monthly basis to all track departmen
Monitors construction costs, government regulations at different stages of each project
• Assisting Senior Engineers and Project Managers in the design and development of site plans and infrastructure project’s specifications and estimates.
• Coordination of project assignments with other engineers and technicians, reviewed drawings supplied by vendors, clients, and architects to recommend necessary changes and keep projects moving forward.
• Submits permit applications to local, state, and federal agencies, verifying that projects comply with applicable regulations
• Formulates accurate cost estimates for materials, equipment, or labor to determine a project's economic feasibility